04RCN HSE Residential Care Neighbourhood, Grangegorman Project
Published deadline passed
The published deadline has passed. For multi-stage competitions a later tender deadline may still apply — check the notice or portal for the current phase.
- Qualification deadline
- Aug 27Expired
- Procedure
- With prequalificationTwo stages
Brief
Grangegorman Development Agency needs construction services for a new 2 to 4 storey development, approximately 12,000 m2 in floor area, for the Health Service Executive (HSE) on the Grangegorman campus in Dublin 7, Ireland. The project, with a maximum total value of 42,000,000 EUR and a duration of 3 years, involves the demolition of an existing 17-bed residential mental health facility and the diversion of a live MV power line. The scheme has been designed to detailed design stage (CWMF Work Stage 2b) by the Employer's Design Team. The procurement will follow a two-stage Restricted process, with an initial pre-qualification stage followed by an invitation to tender for shortlisted contractors.
Building work and installations
Previous winners
Who are you up against?
The suppliers who have won similar contracts at Grangegorman Development Agency_564
Will you bid?
The agent sets up the bid and writes the first draft. Free for 14 days.
From the notice
The GDA is seeking to shortlist 6 No. Building contractors who will be invited to tender for the construction of a new build 2 to 4 storey development circa 12,000 m2 in floor area, namely the Grangegorman Residential Care Neighbourhood (RCN) for the Health Service Executive (HSE) on the Grangegorman campus in Dublin 7. The Contracting Authority is proceeding with a two stage Restricted procurement process. The first stage, Stage I – Pre-qualification (Stage I – QW1) will invite submissions from Applicants. Subsequently, shortlisted Stage I Applicants will be invited to tender at the second Stage II – Invitation to Tender (Stage II – ITT). The proposed Residential Care Neighbourhood development will include the demolition of a circa 1,000sqm, 2 storey 17-bed residential mental health facility (St. Elizabeth’s Court constructed mid 1970’s) and the diversion of a below ground live mv power line. The scheme shall be designed by the Employer's Design Team to detailed design stage (CWMF Work Stage 2b). The application site includes a protected structure (RPS ref. 3281) consisting of a boundary wall along a portion of the eastern boundary. No works are proposed to this protected structure. The scheme was granted planning permission in January 2024 and application details are available on DCC’s website - Planning Application Reference is GSDZ4149/23. The Contractor will carry out the required Works and will be responsible for coordinating, scheduling and programming their workload and the Works. The Contractor will retain ultimate responsibility for the quality of the specialists and/or specialist subcontractors. It is to be noted that while the facility will be owned, occupied and managed by the HSE (they are the ultimate client/end-user) the GDA is the developer and the Contracting Authority for the purposes of procurement and delivery of the facility on the Grangegorman campus. As the proposed facility is located at Grangegorman, Dublin 7, it will form part of the Dublin North City Centre services provision and the Approving Authority is the HSE Estates Department. The project is being funded by the HSE Estates as part of their national capital works portfolio. Please refer to the Project Information Memorandum (PIM) for further details.
Contact
procurement@ggda.ie- Competition · PrequalificationType
- 45000000Main codeConstruction work
- 45100000Site preparation work45200000Works for complete or part construction and civil engineering work45300000Building installation work45400000Building completion work