18/212-008 - Foynes Diversion Submerged Arc Welded (SAW) Linepipe

Awarded

The competition has ended and a winner has been selected.

Qualification deadline
Nov 12, 2025Expired
Procedure
With negotiationTwo stages
Agreement
Framework agreement
Estimated value
€1.5M

Brief

Gas Networks Ireland has entered into a framework agreement with Irish Tube & Fittings Supply Ltd for the delivery of submerged arc welded (SAW) linepipe, with a maximum total contract value of 1,539,703.44 EUR. One bid was received for this contract.

Wholesale of Plumbing and Building Materials

Result

TED
  • Irish Tube and Fittings Supply Ltd
    Winner
  • Number of tenders received
    1
  • Contract value
    Not stated

Previous winners

  • Who are you up against?

    The suppliers who have won similar contracts at Gas Networks Ireland

Will you bid?

The agent sets up the bid and writes the first draft. Free for 14 days.

From the notice

  • 18/212-008 - Foynes Diversion Submerged Arc Welded (SAW) Linepipe

  • Contact

    Tenders@gasnetworks.ie
  • Type
    Result · Framework agreement · Prequalification
  • Main code
    Pipes
    44163100

Similar active competitions

  • Gas Networks Ireland

    Wholesale of Plumbing and Building Materials

    25/064 - Qualification System for for the provision of Polyethylene (PE) Pipe, Fittings and Valves

    Gas Networks Ireland needs polyethylene (PE) pipe, fittings, and valves for gas, to be delivered to various stipulated depot destinations on the island of Ireland, for a duration of 10 years. The supply requirements are divided into four lots: Lot 1 (PE Pipe 90mm - 400mm), Lot 2 (PE Pipe 20mm - 63mm), Lot 3 (PE Fittings), and Lot 4 (PE ball valves). The products must comply with I.S. EN 1555 or equivalent, with indicative diameter ranges from 20mm to 400mm, and specific pressure ranges and colors for different PE materials. The buyer may modify the qualification system to reflect changes in requirements, including pipe diameter, pressure rating, and the provision of associated services or additional supplies. A full site visit and audit of the prospective qualified applicant's supply chain manufacturing facility(s) may be carried out to validate and support their pre-qualification submission.

    Qualification system
    Apr 9, 2036(100+ days)
  • Gas Networks Ireland

    Pipe inspection and water/wastewater maintenance

    25/002 - Provision of Onshore and or Nearshore Inspection Services

    The Contracting Entity is seeking applications from suitably experienced inspection companies to carry out offshore, nearshore and onshore inspection surveys of two submarine gas transmission pipelines each approximately 200km long, Scotland to Ireland from shore to shore, and one spur and one umbilical approximately 11km long to the Isle of Man. The network cathodic protection is provided by means of sacrificial aluminium alloy half shell bracelet anodes. The network entire lengths are either trenched, or rockdumped in lieu of trenching. The seabed is varied and includes sandwaves towards the Scottish end. The maximum water depth is approximately 140 metres. The inspection scope requires vessels equipped for visual inspection, acoustic examination, cathodic protection monitoring and the assessment of the disposition of the pipeline relative to the seabed. There is also a requirement for a capability for conducting intervention tasks involving the removal of seabed debris and/or freespan rectification and maintenance capability for a subsea tee in approximately 30 metres water depth. There is a further requirement for a capability to mobilise an offshore diving spread to conduct subsea intervention tasks using divers. There will also be a requirement to mobilise at short notice for unplanned debris surveys of the pipelines as required.

    Qualification system
    Jun 27, 2028(100+ days)
  • Raheen Group Water Scheme

    Construction of buildings

    Raheen Group Water Scheme Watermain Replacement

    Raheen Group Water Scheme needs works to replace approximately 2.3 km of existing watermain and install a new booster pump station, including ancillary works, in Ireland’s Mid-West region. The project has a maximum total value of €900,000 and a duration of 4 months.

    Competition
    Jan 29, 2027(63 days)
    €900,000