Find

  • All tenders
All tenders: Germany/Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH/81319388 - Elaboration of 4 Integrated Catchment Management and Development Plans for the Upper Senqu, Lower Senqu, Central Mohokare and Lower Mohokare Catchment Management Areas in Lesotho

81319388 - Elaboration of 4 Integrated Catchment Management and Development Plans for the Upper Senqu, Lower Senqu, Central Mohokare and Lower Mohokare Catchment Management Areas in Lesotho

Awarded

The competition has ended and a winner has been selected.

Deadline
Nov 24, 2025Expired
Award
Erreichte Gesamtpunktzahl nach fachlicher Wertung (inkl. Mindbed.), weight 83.33
Procedure
OpenSingle stage
Agreement
Buying services
Estimated value
€390.7Kuntil Jun 2026

Brief

The Government of Lesotho, with support from the EU and the BMZ, has embarked on an ambitious "National Programme for ICM (ReNoka)" ("re noka" in Sesotho means "we are a river"). Its aim is to rehabilitate degraded watersheds across the country and to put in place prevention measures that will halt the further degradation of Lesotho"s catchment areas. The sustainable management of Lesotho"s catchments are of critical importance for water, land, energy and food security not only in Lesotho itself but in the entire Orange-Senqu Basin and Gauteng Province, one of Southern Africa"s economic centres. The GIZ has been commissioned by the EU and the BMZ as part of its transboundary water management (TWM) programme for Southern African Development Community (SADC) to implement a technical cooperation project (Action) to support ICM / ReNoka in Lesotho. The overall objective of the Action is that "ICM facilitates socio-economic development and adaptation to climate change in Lesotho", while the specific objective is "ICM is institutionalised and under full implementation in Lesotho, based on gender equality and climate adaptation principles". To achieve this objective, the Action work concurrently on five interlinked outputs: - Output 1: Effective and efficient, gender sensitive and climate-resilient policy framework for ICM is developed and applied. - Output 2: Effective and efficient institutions for ICM are established, with equitable representation of women and youth. - Output 3: Capacity, skills and knowledge of public, private sector and civil society for sustainable ICM is facilitated. - Output 4: ICM measures are implemented. - Output 5: Capacity strengthened for coordination, monitoring, supervision and general programme management. Lesotho is sub-divided into six Catchment Management Areas of (CMAs) to facilitate the planning and management of its three river basins (Senqu river basin, Mohokare river basin and Makhaleng river basin). The six CMAs are Upper Senqu, Lower Senqu, Upper Mohokare, Central Mohokare, Lower Mohokare and Makhaleng. Lesotho"s Long-term Water and Sanitation Strategy (2014) calls for the preparation of Integrated Catchment Management and Development Plans (ICMDPs) in consultation with stakeholders and guidelines for their elaboration as key components to support Integrated Catchment Management in Lesotho. So far two of the six ICMDPs have been elaborated, these are two ICMDPs for Upper Mohokare and Makhaleng CMAs. The objective of this assignment is therefore to elaborate four ICMDPs for the following CMAs: Upper Senqu, Lower Senqu, Central Mohokare and Lower Mohokare.

Waste Management

Result

TED
  • NIRAS Germany GmbH
    Winner
  • Number of tenders received
    8
  • Contract value
    €358,220

Previous winners

  • Who are you up against?

    The suppliers who have won similar contracts at Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH

Will you bid?

The agent sets up the bid and writes the first draft. Free for 14 days.

Award Criteria

  • Description

    Consideration of the price through the valuation method "Bestangebots-Quotienten-Methode"

    Source

    No source found in the documents. Check the weight against the tender documents.

  • Description

    Zur Ermittlung des wirtschaftlichsten Bieters wird hier von der Vergabestelle die erreichte Gesamtpunktzahl nach fachlicher Wertung eingetragen. Es werden nur Angebote mit einer fachlichen Bewertung von mindestens 500 Punkten gewertet. Fachliche Angebote mit weniger Punkten scheiden als fachlich ungeeignet aus.

    Source

    No source found in the documents. Check the weight against the tender documents.

From the notice

  • The Government of Lesotho, with support from the EU and the BMZ, has embarked on an ambitious "National Programme for ICM (ReNoka)" ("re noka" in Sesotho means "we are a river"). Its aim is to rehabilitate degraded watersheds across the country and to put in place prevention measures that will halt the further degradation of Lesotho"s catchment areas. The sustainable management of Lesotho"s catchments are of critical importance for water, land, energy and food security not only in Lesotho itself but in the entire Orange-Senqu Basin and Gauteng Province, one of Southern Africa"s economic centres. The GIZ has been commissioned by the EU and the BMZ as part of its transboundary water management (TWM) programme for Southern African Development Community (SADC) to implement a technical cooperation project (Action) to support ICM / ReNoka in Lesotho. The overall objective of the Action is that "ICM facilitates socio-economic development and adaptation to climate change in Lesotho", while the specific objective is "ICM is institutionalised and under full implementation in Lesotho, based on gender equality and climate adaptation principles". To achieve this objective, the Action work concurrently on five interlinked outputs: - Output 1: Effective and efficient, gender sensitive and climate-resilient policy framework for ICM is developed and applied. - Output 2: Effective and efficient institutions for ICM are established, with equitable representation of women and youth. - Output 3: Capacity, skills and knowledge of public, private sector and civil society for sustainable ICM is facilitated. - Output 4: ICM measures are implemented. - Output 5: Capacity strengthened for coordination, monitoring, supervision and general programme management. Lesotho is sub-divided into six Catchment Management Areas of (CMAs) to facilitate the planning and management of its three river basins (Senqu river basin, Mohokare river basin and Makhaleng river basin). The six CMAs are Upper Senqu, Lower Senqu, Upper Mohokare, Central Mohokare, Lower Mohokare and Makhaleng. Lesotho"s Long-term Water and Sanitation Strategy (2014) calls for the preparation of Integrated Catchment Management and Development Plans (ICMDPs) in consultation with stakeholders and guidelines for their elaboration as key components to support Integrated Catchment Management in Lesotho. So far two of the six ICMDPs have been elaborated, these are two ICMDPs for Upper Mohokare and Makhaleng CMAs. The objective of this assignment is therefore to elaborate four ICMDPs for the following CMAs: Upper Senqu, Lower Senqu, Central Mohokare and Lower Mohokare.

  • Contact

    zuhal.uysal@giz.de
  • Type
    Result
  • Main code
    Environmental issues consultancy services
    90713000
  • 79951000Seminar organisation services90713100Consulting services for water-supply and waste-water other than for construction

Similar active competitions

  • Secretaria Regional de Turismo, Ambiente e Cultura

    Waste Management

    Aquisição de serviços para a elaboração da 4.ª Geração do Plano de Gestão da Região Hidrográfica da Madeira (PGRH-Madeira), para 2028-2033

    A Secretaria Regional de Turismo, Ambiente e Cultura precisa de serviços para elaborar a 4.ª Geração do Plano de Gestão da Região Hidrográfica da Madeira (PGRH-Madeira), relativo ao período de 2028–2033. O contrato terá duração de 14 meses, valor máximo total de 139.250 euros e execução na Região Autónoma da Madeira; os detalhes técnicos constam das peças do procedimento. O único critério de adjudicação indicado é o preço.

    Competition
    Dec 9, 2026(13 days)
    €139,250
  • Stadtwerke Osnabrück AG

    Environmental and waste consultant

    Wasserschutzberatung

    Die Stadtwerke Osnabrück AG benötigen Wasserschutzberatung auf Grundlage eines bestehenden Schutz- und Beratungskonzepts: zunächst für 2 Jahre, mit einer Verlängerungsoption um weitere 3 Jahre (2+3); der geschätzte Auftragswert bezieht sich auf den Gesamtzeitraum von 5 Jahren, eine konkrete Summe ist nicht angegeben. Die Leistungen betreffen 7 Wasserschutz- beziehungsweise Trinkwassergewinnungsgebiete, 2 Wasserversorgungsunternehmen, 331 Betriebe und 4.481 Hektar landwirtschaftliche Fläche im Raum Osnabrück. Bewertet werden Preis (35 %), das Umsetzungskonzept für das Schutz- und Beratungskonzept (35 %), Zusammenarbeit und Projektorganisation (15 %) sowie geplante Personalkapazitäten und -qualifikationen (15 %).

    Competition with qualification
    Nov 30, 2026(4 days)
  • Stichting Waternet

    Ocean and Coastal Fishing with Boat Rental

    Visstandbeheer Loosdrechtse Plassengebied

    Stichting Waternet heeft diensten nodig voor de voorbereiding en uitvoering van visstandbeheer in het Loosdrechtse plassengebied, als onderdeel van de KRW-maatregelen SGBP3 2023–2027, met een maximale totale contractwaarde van 6 miljoen euro. De opdracht wordt uitgevoerd via een tweefasenbenadering, beginnend met een bouwteamfase waarin de opdrachtnemer een actieve, samenwerkingsgerichte en inhoudelijke inbreng levert vanuit praktische uitvoeringskennis en ervaring met visstandbeheer. De gunning vindt plaats op basis van de beste prijs-kwaliteitverhouding (BPKV), waarbij kwaliteit voor 80% meetelt (Plan van Aanpak 50%, Voorstel Samenwerking 30%) en prijs voor 20%.

    Competition
    Dec 1, 2026(5 days)
    €6,000,000