8437 - Enterprise Fleet Replacement Project
Awarded
The competition has ended and a winner has been selected.
- Qualification deadline
- Dec 18, 2025Expired
- Procedure
- With negotiationTwo stages
Brief
Iarnród Eireann-Irish Rail has entered into a single-party framework agreement for the procurement of new Enterprise vehicles and a maintenance contract for technical support services and spares supply. The agreement is for 8 years and has a maximum total value of 650 million EUR. The services will be delivered in Ireland and Northern Ireland. The procurement includes 8 new trainsets, up to a maximum of 200m in length, designed to operate an hourly service between Dublin and Belfast. The trains will operate on 1600mm track gauge and will initially use Internal Combustion Engine (ICE) Battery Electric traction, with a design to transition to net-zero carbon operation by replacing diesel power generation with dual OHLE power supply equipment. The entire new fleet is planned to be in service between 2028 and 2029.
Spesialisert jernbaneutstyr
Previous winners
Who are you up against?
The suppliers who have won similar contracts at Iarnród Eireann-Irish Rail
Will you bid?
The agent sets up the bid and writes the first draft. Free for 14 days.
From the notice
This is a call to competition by IARNROD EIREANN (IE) and NORTHERN IRELAND RAILWAYS COMPANY LIMITED (NI Railways) for the establishment of an 8 Year, Single Party Framework Agreement for the procurement of new Enterprise vehicles (Enterprise Fleet Replacement Agreement) required for the replacement of the existing Enterprise Fleet (the Contract). Along with procurement of the rolling stock, the scope of the procurement process will also include a maintenance contract in respect of technical support services and spares supply in relation to the new rolling stock (Maintenance Contract). IE and NI Railways (the Contracting Entity) now wish to initially procure 8 new trainsets up to a maximum of 200m in length to operate an hourly service between Dublin and Belfast. It is planned to have the entire new fleet in service in 2028 to 2029 and to deliver the end to end journey sub 2 hours or better on the existing infrastructure. Initial traction power will be Internal Combustion Engine (ICE) Battery Electric (using the existing 1.5 kV DC OHLE) with the train designed to transition to a net zero carbon operation during its life by the removal of the diesel power generation for replacement with dual OHLE power supply equipment. The trains will operate on 1600mm track gauge, will operate in full length formation of a maximum of 200m in length and will be required to meet other gauging requirements of the Irish Rail - NI Railways network.
Contact
juliana.marinho@irishrail.ie- Result · Framework agreement · PrequalificationType
- 34620000Main codeRolling stock