Find

  • All tenders
Ireland: Tenders/Iarnród Eireann-Irish Rail/9091 TER Design, Supply, Integration, and Repair Services

9091 TER Design, Supply, Integration, and Repair Services

Awarded

The competition has ended and a winner has been selected.

Qualification deadline
Dec 15, 2025Expired
Procedure
With negotiationTwo stages
Agreement
Buying goods
Estimated value
€3.5Mover 6 years

Brief

Iarnród Eireann-Irish Rail has entered into an agreement with CMS Chemstore Engineering Ltd. for the design, supply, integration, and repair services of Telecommunications Equipment Rooms (TER) and Retrofit Roofs for use at various locations nationally in Ireland. The contract has a duration of 6 years and an estimated total value of 3,461,282 EUR. The services include the construction and delivery of TERs, provision of groundworks requirement details, delivery and installation of Retrofit Roofs, certification of all works, and maintenance recommendations. The buildings must generally conform to BRB ‘Specification for Relocatable Equipment Buildings for SandT Use, No. BR 1615, Issue D, May 1991’, with specified amendments and additions. Two bids were received for this contract.

Diverse konstruksjonsmateriell

Result

TED
  • Chemstore
    Winner
  • Number of tenders received
    2
  • Contract value
    €3,461,282

Previous winners

  • Who are you up against?

    The suppliers who have won similar contracts at Iarnród Eireann-Irish Rail

Will you bid?

The agent sets up the bid and writes the first draft. Free for 14 days.

From the notice

  • IE has a requirement for the Supply and Installation of Telecommunications Equipment Rooms (TER) and Retrofit Roofs for use at various locations nationally. These equipment rooms will primarily host Telecommunications Equipment and, as required additionally contain Signalling and Electrification equipment, to support the operational railway. The buildings must generally conform to BRB ‘Specification for Relocatable Equipment Buildings for SandT Use, No. BR 1615, Issue D, May 1991’, with the amendments and additions as specified in the technical specification supplied at ITT stage. There is also a requirement for the supply and installation of Retrofit Roofs for existing TER’s to further extend the functional lifespan of these installed rooms. Following the completion of the tender process, the Tenderer will be responsible for: • Construction of Telecommunications Equipment Rooms to IÉ specification • Delivery of TER’s to locations nationally at an agreed rate • Provision of ground works requirement details to support installation of TER • Delivery and Installation of Retrofit Roof’s to locations nationally at an agreed rate • Certification of all works and installations as per Standards referenced in the specification • Provision of maintenance recommendations for supplied TER’s

  • Contact

    adam.ryan@irishrail.ie
  • Type
    Result · Prequalification
  • Main code
    Prefabricated buildings
    44211000
  • 44110000Construction materials44112000Miscellaneous building structures44112400Roof44112410Roof frames44112420Roof supports44112430Roof trusses44112500Roofing materials44140000Products related to construction materials44190000Miscellaneous construction materials44210000Structures and parts of structures44211100Modular and portable buildings44211200Cubicles

Similar active competitions

  • Gas Networks Ireland

    Bygg og anlegg - Bruer og tunneler

    24/042 - Telecom Equipment Colocation Cabin Supply

    The objective of this QSQ is to qualify Applicants onto the Qualifications Systems for the design, manufacture, supply and installation of multiple telecoms equipment colocation cabins. These colocation modules may consist of a temperature-controlled 9m × 3m × 3m container and house a range of telecommunications equipment (that are owned and operated by others) with accompanying electrical supplies, fibre optic distribution system and supporting installations. The scope includes but will not be limited to; • Cabin and systems design • Cabin structure • Cabin internals • HVAC (Heating, ventilation, and air conditioning) • AC Power • DC Power system • Earthing system • Lightening protection system • UPS (Uninterrupted Power Supply) • Fibre management systems • Cable management systems • Equipment cabinets • Building management system • Control Panel • Intruder alarm system • Fire alarm system • Fire suppressant system • Emergency and escape lighting • Cabin access and controls system • Water leak detection systems • CCTV systems • Duties associated with the role of PSDP (Project Supervisor for the Design Process) and PSCS (Project Supervisor for the Construction Stage) • Any other ancillary works associated with any of the above • The scope may also include upgrades, modifications, extensions and maintenance to new and/or existing telecoms equipment colocation cabins. Please find further information and details of the colocation modules that will be required under the contract in Appendix 5 Co-Location Facility Data Sheet. The Contracting Entity reserves the right to call off from the Qualification System in respect of ancillary services that may be required to be performed in Northern Ireland. Admission to the Qualification System is subject to Applicants meeting the minimum requirements and minimum scores set out in this QSQ.    The details of how the Qualification System will operate are set out in Appendix 2 (Operation of the Qualification System).     Applicants should note that from time to time over the term of the Qualification System, the Contracting Entity, at its sole discretion but without altering the overall nature of the Qualification System, may modify the Qualification System to reflect changes in its requirements.  The conditions under which such an option may be exercised by the Contracting Entity will be outlined in the relevant call off competition document.

    Qualification system
    Apr 4, 2028(100+ days)
  • Iarnród Eireann-Irish Rail

    Spesialisert jernbaneutstyr

    Continuous Welded Rail Transportation and Delivery System

    Iarnród Eireann-Irish Rail is planning the procurement of a Continuous Welded Rail Transportation and Delivery System, with an estimated maximum total contract value of 14,000,000 EUR. This procurement is for supplies related to locomotives and tenders.

    Planning€14,000,000
  • Iarnród Eireann-Irish Rail

    Oppføring av bygninger

    9096 Qualification System for Civil Engineering Works €50k to €1m

    Iarnród Éireann (IÉ) is seeking expressions of interest from suitably qualified applicants to establish a Qualification System for Civil Engineering associated with upgrading of the railway infrastructure and other related works that Iarnród Eireann may undertake directly or on behalf of Bus Eireann, Dublin Bus or CIE on their properties. The extent and details of these works will vary from location to location. The project works (from €50k up to value of €1M) shall be tendered to those Contractors approved for inclusion on this Qualification System. Examples of project works required may include but are not limited to any of the following: Any works required to facilitate construction of new platforms and/or extension and upgrading of existing platforms, Construction of footbridges and any associated lift installations, Any works required to facilitate construction of new car parks and/or extension and upgrading of existing car parks, Any works required to facilitate bridge widening, bridge replacement, bridge closures, road realignments, access roads etc, Construction of new over and underbridges, Alterations / maintenance to existing railway underbridges or overbridges, Embankment/cutting works including widening, strengthening and repair, Coastal defence works, Construction of roads, earthworks, drainage, boundary treatment and minor civil engineering works, Any works required to facilitate the installation of ducting / services routes / equipment cabinets etc. or relocation of services adjacent to the railway, Maintenance and demolition of existing railway structures / infrastructure, Works to existing and new OHLE support structures and infrastructure, Works to existing and new signalling support structures and infrastructure, Works to install new TPS (Train Protection System) infrastructure, Foundation works, ground engineering and geotechnical processes, All associated temporary works to ensure the continued operation of the railway.

    Qualification system
    Mar 14, 2030(100+ days)