9111 - SCSS Detailed Design Services
Awarded
The competition has ended and a winner has been selected.
- Qualification deadline
- Apr 28,Expired
- Procedure
- Without prior noticeTwo stages
Brief
Iarnród Eireann-Irish Rail has entered into a framework agreement with O'Connor Sutton Cronin_19870 for the delivery of detailed design services and potentially design support, employer's representative, and construction supervision services for various station groups in Ireland. The core services involve detailed design for Station Groups East 1 (8 stations) and East 2 (12 stations), with options for additional detailed design services for East 3 (15 stations) and East 4 (11 stations), and design support/supervision for all East groups. The maximum total estimated value of the contract is 1,811,986.14 EUR.
Digital design og brukeropplevelse
Result
- O'Connor Sutton Cronin_19870Winner
- 3Number of tenders received
- Not statedContract value
- Maximum framework agreement valueUp to €2,000,000
Previous winners
Who are you up against?
The suppliers who have won similar contracts at Iarnród Eireann-Irish Rail
Will you bid?
The agent sets up the bid and writes the first draft. Free for 14 days.
From the notice
The overall objective of this project is to develop detailed designs and for each station provide a package of Approved for Construction (AFC) Drawings as detailed in section 6.4.2 for the scope of works. This SOW specifies two groups of services (‘Detailed Design Services’ and ‘Design Support, Employers Representative and Construction Supervision Services’). These services are to be performed for one or more sets of stations (‘Station Groups’). The Core Services to be performed by The Consultant are Detailed Design Services for Station Groups East 1 (8 stations) and East 2 (12 stations). In addition, IÉ may also ask the consultant to deliver one or more of the following optional work packages: - • Option 1: Provide Design Support, Employers Representative and Construction Supervision Services for East 1 and East 2 • Option 2: Provide Detailed Design Services for East 3 (15 stations) and East 4 (11 stations) • Option 3: Provide Design Support, Employers Representative and Construction Supervision for East 3 and East 4. Station Groups are defined in Appendix 1. Detailed Design Services are defined in Sections 6 and 7. Design Sup
Contact
Jonathan Bayleyjonathan.bayley@irishrail.ie- Result · Framework agreement · PrequalificationType
- DublinLocation
- 79415200Main codeDesign consultancy services