Ireland: Tenders/Iarnród Eireann-Irish Rail/9493 Points and Crossings Laser Profile Measuring System

9493 Points and Crossings Laser Profile Measuring System

Awarded

The competition has ended and a winner has been selected.

Procedure
With negotiationTwo stages
Agreement
Buying goods
Estimated value
€527.7Kover 5 years

Brief

Iarnród Eireann-Irish Rail has entered into an agreement with General Impianti srl for the delivery of a Points and Crossings Laser Profile Measuring System in Dublin. The system, valued at 527,650 EUR over 5 years, must be an automated, battery-powered, remotely controlled, and self-propelled tool capable of recording rail profiles at intervals no greater than 2mm. It needs to perform autonomous Points and Crossing inspections, combining numerous measurement points including longitudinal level, alignment, cross level, five-point derailment, short twist and twist over 3m, track gauge, free wheel passage and clearances, switch residual opening, detection of broken or lost sections in switches and crossings, gaping switches, switch and rail wear, inspection of running edge, 3D scanning of the switches and crossing nose, fixed nose protection, nose free wheel passage/clearance, monitoring of sidewear on rail, and recording track geometry, as well as detecting and measuring lipping/plastic flow. Two bids were received for this contract.

Jernbaneskilt og jernbaneutstyr

Result

TED
  • GENERAL IMPIANTI, SRL
    Winner
  • Number of tenders received
    2
  • Contract value
    €527,650

Previous winners

  • Who are you up against?

    The suppliers who have won similar contracts at Iarnród Eireann-Irish Rail

Will you bid?

The agent sets up the bid and writes the first draft. Free for 14 days.

From the notice

  • • To obtain an automated laser profile measurement tool, which is, battery powered, controlled remotely and self-propelled. • Capable of recording profile of all rails at intervals of, no greater than, 2mm. • Must be capable of carrying out Points and Crossing inspections autonomously. • The proposed measuring device should have capabilities in a number of different areas and be able to combine numerous measurement points within their inspection, such as o Longitudinal Level o Alignment o Cross Level o Five-Point Derailment and have the ability factor in chair gaps/hogging (equivalent to NR/L2/TRK/053 and NR/L2/TRK/1054 Network Rail Standard) o Short Twist and Twist over 3m o Track Gauge o Free Wheel Passage, o Free Wheel Clearances o Measure Switch Residual Opening o Detect Broke or loss of section in switches and crossings including wing rails o Detect Gaping Switches o Switch and Rail Wear o Inspection of Running Edge o 3D Scanning of the Switches and Crossing Nose, o Fixed Nose Protection, o Nose Free Wheel Passage/Clearance, o Monitor of Sidewear on Rail and to record Track Geometry, o Detect and Measure Lipping/Plastic Flow.

  • Contact

    Ricardocatherine.odonoghue@irishrail.ie
  • Type
    Result · Prequalification
  • Location
    Dublin
  • Main code
    Railway equipment
    34940000
  • 34941800Railway points38300000Measuring instruments38422000Level-measuring equipment38424000Measuring and control equipment38425700Surface tension measuring instruments38540000Machines and apparatus for testing and measuring

Similar active competitions

  • Iarnród Eireann-Irish Rail

    Spesialisert jernbaneutstyr

    Continuous Welded Rail Transportation and Delivery System

    Iarnród Eireann-Irish Rail is planning the procurement of a Continuous Welded Rail Transportation and Delivery System, with an estimated maximum total contract value of 14,000,000 EUR. This procurement is for supplies related to locomotives and tenders.

    Planning€14,000,000
  • LTG Kompetencijų centras UAB (PV)

    Anleggs- og infrastrukturbygging

    34747 1435 mm geležinkelio kelio geometrinių parametrų patikrinimas kelmačiu

    LTG Kompetencijų centras UAB (PV) ieško paslaugų teikėjo 1 435 mm vėžės geležinkelio kelio geometriniams parametrams kelmačiu patikrinti. Sutarties trukmė – 38 mėnesiai, o išsamesnė darbų apimtis nustatyta techninėje specifikacijoje; skelbiama maksimali vertė nenurodyta. Paslaugos susijusios su geležinkelio kelio matavimais, tačiau konkreti kompetencijos ar įrangos reikalavimų informacija pateiktame pranešime neatskleista.

    Competition with qualification
    Dec 21, 2026(28 days)
    €0
  • Iarnród Eireann-Irish Rail

    Anleggsmaskiner og utstyr

    9459 Qualification for Depot Equipment

    Qualification System (QS) for Depot Equipment, including but not limited to: • Vehicle lifting jacks • Vehicle body stands • Bogie drops • Equipment drops • Equipment tables • Wheelset turntables • Bogie turntables • Traversers

    Qualification system
    Aug 15, 2028(100+ days)