Estimated value
€500K

Brief

The current storage appliances are nearing end of life and there is a requirement for a new storage system that meets ICBF’s needs. At present, there are eight compute nodes in the cluster, consisting of • 2 Dell R930 servers (Quad Intel Xeon E7-8893v3 with 6TB) • 2 Dell R940’s (Quad Intel Xeon Gold 6242 with 3TB RAM) • 4 Dell R960’s (Quad Intel Xeon Platinum 8444H with 3TB RAM) Going forward, there is a requirement to be able to run production, development and test jobs with the dev/test jobs having minimal impact on production. Rather than having the eight nodes working together in one cluster, the intention is to set up three independent environments, development, test and production and allocate certain nodes to each of these environments. For example, in the diagram below, nodes 1 to 3 run production jobs, nodes 4 and 5 run test jobs and nodes 6 to 8 run development jobs. A requirement of the new solution is that storage can be allocated independently to each environment. We need to ensure that any jobs that run on the development and test partitions have a minimal impact on production. The workload requires a minimum Input-Output per second (IOPS) of 50,000 for the production workloads. The IOPS required for the development and test environments do not necessarily need to be at this level, a minimum requirement of 30,000. There is a requirement for a minimum of 300TB of usable storage, to be split between production, development and test. All this 300TB must be available to the end user. Please see diagram in Tender Document

Datamaskinhandel og tilhørende utstyr

Register interest

Previous winners

  • Who are you up against?

    The suppliers who have won similar contracts at Irish Cattle Breeding Federation

Will you bid?

The agent sets up the bid and writes the first draft. Free for 14 days.

From the notice

  • The current storage appliances are nearing end of life and there is a requirement for a new storage system that meets ICBF’s needs. At present, there are eight compute nodes in the cluster, consisting of • 2 Dell R930 servers (Quad Intel Xeon E7-8893v3 with 6TB) • 2 Dell R940’s (Quad Intel Xeon Gold 6242 with 3TB RAM) • 4 Dell R960’s (Quad Intel Xeon Platinum 8444H with 3TB RAM) Going forward, there is a requirement to be able to run production, development and test jobs with the dev/test jobs having minimal impact on production. Rather than having the eight nodes working together in one cluster, the intention is to set up three independent environments, development, test and production and allocate certain nodes to each of these environments. For example, in the diagram below, nodes 1 to 3 run production jobs, nodes 4 and 5 run test jobs and nodes 6 to 8 run development jobs. A requirement of the new solution is that storage can be allocated independently to each environment. We need to ensure that any jobs that run on the development and test partitions have a minimal impact on production. The workload requires a minimum Input-Output per second (IOPS) of 50,000 for the production workloads. The IOPS required for the development and test environments do not necessarily need to be at this level, a minimum requirement of 30,000. There is a requirement for a minimum of 300TB of usable storage, to be split between production, development and test. All this 300TB must be available to the end user. Please see diagram in Tender Document

  • Contact

    mmadden@icbf.com
  • Type
    Competition
  • Main code
    Computer storage units
    30233100
  • 30200000Computer equipment and supplies30230000Computer-related equipment30236000Miscellaneous computer equipment

Similar active competitions

  • Digital Hub Development Agency

    Datamaskinhandel og tilhørende utstyr

    DPS for the Provision of Compute and Storage Infrastructure and Associated Ancillary Software, Products and Services

    DPS for the Provision of Compute and Storage Infrastructure and Associated Ancillary Software, Products and Services

    Dynamic purchasing system€1,200,000,000
  • Dienst Uitvoering Onderwijs

    Datamaskinhandel og tilhørende utstyr

    DAS 2026 Compute & Storage

    Inkoop Uitvoeringscentrum Noord (IUC-Noord) heeft een Dynamisch Aankoopsysteem (DAS) opgezet voor de levering van gangbare compute- en storageoplossingen, met een maximale totale contractwaarde van 375 miljoen EUR. Het DAS is verdeeld in twee percelen: Perceel 1 voor reguliere opdrachten zonder specifieke beveiligingsbelangen, en Perceel 2 voor opdrachten waarbij Te Beschermen Belangen en de Algemene Beveiligingseisen voor Rijksoverheidsopdrachten (ABRO 2026) of Algemene Beveiligingseisen voor Defensieopdrachten (ABDO 2019) van toepassing zijn. De leverancier dient de oplossingen te leveren, implementeren en ondersteunen.

    Dynamic purchasing system
    Jan 31, 2028(100+ days)
    €375,000,000
  • Leibniz-Institut zur Analyse des Biodiversitätswandels (LIB)

    Chromebooks og bærbare datamaskiner

    IT-Hardware für einen Ceph-Storage-Cluster

    Das Leibniz-Institut zur Analyse des Biodiversitätswandels benötigt betriebsfertig gelieferte Hardware für einen Ceph-Storage-Cluster mit 100-Gbit/s-Netzwerk am Standort Bonn. Der Auftrag umfasst Storage-Nodes inklusive Erstbestückung, zwei 100-Gbit/s-Switches sowie alle erforderlichen Transceiver, DAC/AOC, Glasfasern, Kabel und Rackmontagekomponenten; die Lieferung muss vollständig verpackt und dokumentiert sein. Montage und Inbetriebnahme übernimmt die Auftraggeberin. Für die Erstleistung einschließlich 60 Monaten NBD-Vor-Ort-Service ist ein Bruttogesamtpreis von 800.870 Euro angesetzt. Mindestens drei vergleichbare, seit 2023 abgeschlossene Referenzprojekte sind nachzuweisen: jeweils mit mindestens 15 Storage- oder Cluster-Nodes, einer Netzwerkgeschwindigkeit über 25 Gbit/s und belegter Inbetriebnahme im Produktivbetrieb; Ceph-Erfahrung ist besonders wertvoll, aber nicht zwingend. Die Wertung erfolgt zu 55 % nach Preis und zu 45 % nach technischer Leistungsfähigkeit der Nodes, bewertet anhand der Gesamtzahl der CPU-Kerne, des RAM und der NVMe-Kapazität.

    Competition
    Nov 23, 2026(1 day)