Achizitie echipamente si lucrari aferente pentru realizarea obiectivul de investitii:: “Construire centrală de cogenerare, pe biomasă, rețea de termoficare, conexiune la rețeaua electrică de medie tensiune”
Expired
The competition has expired without a winner being announced.
- Deadline
- Nov 18, 2025Expired
- Award
- Puterea electrica nominala a modului ORC, weight 30 and 1 more
Brief
Contractul vizeaza urmatoarele componente si activitati: - Organizare de santier - Constructii si instalatii - Montaj utilaje tehnologice, echipamente tehnologice si functionale - Utilaje, echipamente tehnologice si functionale care necesita montaj - Pregatirea personalului de exploatare - Probe tehnologice si teste. Lucrarile constau in realizarea unei capacităţi de producere de energie electrică şi termică în cogenerare de înaltă eficienţă din biomasă, cu o putere instalată de 2,6 MWh termic si 0,5 MWh electric, în comuna Telciu. Prin proiectul de investiţii se propune construirea unei centrale de cogenerare, din biomasă, reţea de termoficare, conexiune reţea electrică de medie tensiune, în comuna Telciu, judeţul Bistriţa-Năsăud. Această investiţie va permite autorităţii publice locale să-şi reducă costurile cu energia termică şi electrică consumată la nivelul clădirilor publice aflate în administrare prin producerea energiei într-o centrală de cogenerare pe bază de biomasă în paralel cu reducerea emisiilor de gaze cu efect de seră. În cazul investiţiei propuse spre realizare, biocombustibilul folosit pentru instalaţia de producere a energiei va fi exclusiv biomasa de origine vegetală, prin aceasta înţelegându-se toate materialele produse prin procesul de fotosinteză a clorofilei, cu ajutorul energiei solare, al apei şi al diferitelor substanţe nutritive. Spre deosebire de situaţia actuală, în care se utilizează lemn de foc pentru încălzirea clădirilor publice, care trebuie să aibă anumite calităţi, în cazul implementării proiectului se vor putea valorifica energetic toate resturile, ramurile, lemnul depreciat, lemn din curăţiri de parchete, etc. Proiectul presupune construirea spaţiilor necesare centralei de cogenerare, a depozitelor de combustibil (biomasă), a reţelei de distribuţie a energiei termice, a conexiunii la reţeaua de distribuţie a energiei electrice şi a altor anexe necesare pentru exploatarea investiţiei. De asemenea, prin proiect vor fi achiziţionate utilaje/maşini/echipamente/dotări specifice procesului de producere a energiei în cogenerare, de ultimă generaţie, respectând astfel principiile privind dezvoltarea durabilă. Investiţia propusă are un caracter inovativ care se concretizează prin inovare de procese şi utilizarea unor tehnologii moderne de producere a energiei în cogenerare din biomasă. Aceasta va permite autorităţii publice locale creşterea gradului de confort şi siguranţă în clădirile publice aflate în administrarea acesteia. Operarea si întreţinerea investiţiei se va realiza cu personal propriu care va fi instruit şi specializat în utilizarea maşinilor/utilajelor /echipamentelor/reţelelor care constituie investiţia. Infrastructura creată va fi utilizată pentru a asigura necesarul de energie termică pentru clădirile aflate în administrarea UAT Telciu şi va funcţiona aprox. 2000 ore/an. Instalaţia are elasticitatea funcţională de a se adapta utilizării sezoniere (pornire uşoară fără costuri energetice speciale).
Elektrisk utstyr og belysning
Previous winners
Who are you up against?
The suppliers who have won similar contracts at COMUNA TELCIU
Will you bid?
The agent sets up the bid and writes the first draft. Free for 14 days.
Qualification requirements
Description
Economic operators must demonstrate a form of registration in accordance with the law of their country of residence, from which it appears that the economic operator is legally constituted, is not in any of the situations that would result in annulment of its constitution, and has the professional capacity to carry out the activities that are the subject of the contract. This requirement also applies to subcontractors and/or third-party supporters.
Documentation Requirement
Bidders/subcontractors/associates/third-party supporters must complete the DUAE and check "a: Global indication for all selection criteria" in "Part IV: Selection Criteria". The supporting document proving compliance (certificate issued by ONRC, or for foreign persons/legal entities, equivalent documents issued in their country of residence, translated into Romanian) must be presented upon request by the contracting authority, only by the bidder ranked first in the intermediate ranking. In case contract execution by subcontractors occurs, proof of registration and correspondence of main/secondary activities with the contract subject must also be presented by subcontractors for their part.
Source
No source found in the documents. Check the requirement against the tender documents.
Description
Economic operators must provide proof of authorization by ISCIR (Registrul de Inspecție și Autorizare a Echipamentelor sub Presiune) in accordance with applicable legislation for activities of installation, assembly, repair and maintenance of pressure equipment installations.
Documentation Requirement
Bidders/subcontractors/associates/third-party supporters must complete the DUAE and check "a: Global indication for all selection criteria" in "Part IV: Selection Criteria". The supporting document proving compliance (ISCIR authorization, or for foreign persons/legal entities, equivalent documents issued in their country of residence, translated into Romanian) must be presented upon request by the contracting authority, only by the bidder ranked first in the intermediate ranking. In case contract execution by subcontractors occurs, proof of ISCIR authorization must also be presented by subcontractors for their part.
Source
No source found in the documents. Check the requirement against the tender documents.
Description
Economic operators must provide proof of certification by ANRE (Autoritatea Națională de Reglementare în Energie) in accordance with applicable legislation for execution of electrical installations.
Documentation Requirement
Bidders/subcontractors/associates/third-party supporters must complete the DUAE and check "a: Global indication for all selection criteria" in "Part IV: Selection Criteria". The supporting document proving compliance (ANRE certificate, or for foreign persons/legal entities, equivalent documents issued in their country of residence, translated into Romanian) must be presented upon request by the contracting authority, only by the bidder ranked first in the intermediate ranking. In case contract execution by subcontractors occurs, proof of ANRE certification must also be presented by subcontractors for their part.
Source
No source found in the documents. Check the requirement against the tender documents.
Description
Bidders must demonstrate that they have supplied and commissioned biomass cogeneration systems. Technical and professional capacity can be supported in accordance with applicable law. If supported by a third party, a firm commitment from the third-party supporter must be submitted along with annexed documents, describing how the support will be materially realized and confirming that the third party will support the bidder in fulfilling contract obligations and will respond jointly and severally with the bidder for contract execution.
Documentation Requirement
Documentation demonstrating compliance (certificates or documents issued by the beneficiary/reception records and commissioning reports showing all elements necessary to confirm compliance with similar experience requirement) must be presented upon request by the contracting authority, only by the bidder ranked first in the intermediate ranking. If supported by a third party, the commitment must be submitted with the DUAE, including documents from the third-party supporter describing the concrete manner of support and identifying technical and professional resources to be made available. Documents must bear the beneficiary's registration number and signature to be valid.
Source
No source found in the documents. Check the requirement against the tender documents.
Description
The bidder must specify which part(s) of the contract will be subcontracted and provide the identification data of the proposed subcontractors. If the bidder uses subcontractors' capacities to meet qualification criteria, a separate DUAE form must be submitted for each subcontractor, properly completed and signed. The subcontract agreement/contract must specify the physical, monetary and percentage involvement of the subcontractor in contract execution.
Documentation Requirement
For each subcontractor, a separate DUAE form must be submitted completed and signed by that subcontractor. The subcontractor specifies in the DUAE the information related to qualification criteria it meets, mentioning the number and date of the subcontracting contract/agreement. The subcontracting agreement/contract must be submitted along with the DUAE. The bidder ranked first after application of the award criterion must provide justifying documents from subcontractors upon request by the contracting authority.
Source
No source found in the documents. Check the requirement against the tender documents.
Award Criteria
Description
Punctajul se acorda astfel: a) Pentru cel mai scazut dintre preturi se acorda punctajul maxim alocat; b) Pentru celelalte preturi ofertate punctajul P(n) se calculeaza proportional, astfel: P(n) = (Pret minim ofertat / Pret n) x punctaj maxim alocat.
Source
No source found in the documents. Check the weight against the tender documents.
Description
Pentru oferta cu valoarea cea mai ridicată a puterii electrice a modulului ORC, se acordă punctajul maxim alocat factorului de evaluare, respectiv: P (putere ORC) (max.) = 30 puncte. Pentru o altă ofertă decât cea cu puterea electrica maxima a modulului ORC se acordă punctajul astfel: P (putere ORC) (n) = putere ORC (n)/ putere ORC (max.) ) x 30. Cerințe minime: Ofertantul va prezenta în cadrul propunerii tehnice documentul justificativ din partea producătorului modulului ORC privind puterea electrica nominala. Valoarea minimă admisibilă pentru puterea electrica nominala a modulului ORC este: putere ORC (min.) = 500 kW. Oferta care prezintă valoarea sub valoarea minimă admisibilă nu va fi luată în considerare, fiind stabilită ca „ofertă neconformă”.
Source
No source found in the documents. Check the weight against the tender documents.
Description
Pentru oferta cu valoarea cea mai mica a emisiilor NOx, se acordă punctajul maxim alocat factorului de evaluare, respectiv: P (emisii NOx) (min.) = 30 puncte. Pentru o altă ofertă decât cea cu valoarea cea mai mica a emisiilor NOx se acordă punctajul astfel: P (emisii NOx) (n) = emisii NOx (min.) / emisii NOx (n) ) x 30. Cerințe minime: Valoarea medie zilnica maxima admisibilă pentru emisiile NOx este: emisii NOx (max.) = 200 mg/Nmc. Oferta care prezintă valoarea sub valoarea maxima admisibilă nu va fi luată în considerare, fiind stabilită ca „ofertă neconformă”.
Source
No source found in the documents. Check the weight against the tender documents.
From the notice
Contractul vizeaza urmatoarele componente si activitati: - Organizare de santier - Constructii si instalatii - Montaj utilaje tehnologice, echipamente tehnologice si functionale - Utilaje, echipamente tehnologice si functionale care necesita montaj - Pregatirea personalului de exploatare - Probe tehnologice si teste. Lucrarile constau in realizarea unei capacităţi de producere de energie electrică şi termică în cogenerare de înaltă eficienţă din biomasă, cu o putere instalată de 2,6 MWh termic si 0,5 MWh electric, în comuna Telciu. Prin proiectul de investiţii se propune construirea unei centrale de cogenerare, din biomasă, reţea de termoficare, conexiune reţea electrică de medie tensiune, în comuna Telciu, judeţul Bistriţa-Năsăud. Această investiţie va permite autorităţii publice locale să-şi reducă costurile cu energia termică şi electrică consumată la nivelul clădirilor publice aflate în administrare prin producerea energiei într-o centrală de cogenerare pe bază de biomasă în paralel cu reducerea emisiilor de gaze cu efect de seră. În cazul investiţiei propuse spre realizare, biocombustibilul folosit pentru instalaţia de producere a energiei va fi exclusiv biomasa de origine vegetală, prin aceasta înţelegându-se toate materialele produse prin procesul de fotosinteză a clorofilei, cu ajutorul energiei solare, al apei şi al diferitelor substanţe nutritive. Spre deosebire de situaţia actuală, în care se utilizează lemn de foc pentru încălzirea clădirilor publice, care trebuie să aibă anumite calităţi, în cazul implementării proiectului se vor putea valorifica energetic toate resturile, ramurile, lemnul depreciat, lemn din curăţiri de parchete, etc. Proiectul presupune construirea spaţiilor necesare centralei de cogenerare, a depozitelor de combustibil (biomasă), a reţelei de distribuţie a energiei termice, a conexiunii la reţeaua de distribuţie a energiei electrice şi a altor anexe necesare pentru exploatarea investiţiei. De asemenea, prin proiect vor fi achiziţionate utilaje/maşini/echipamente/dotări specifice procesului de producere a energiei în cogenerare, de ultimă generaţie, respectând astfel principiile privind dezvoltarea durabilă. Investiţia propusă are un caracter inovativ care se concretizează prin inovare de procese şi utilizarea unor tehnologii moderne de producere a energiei în cogenerare din biomasă. Aceasta va permite autorităţii publice locale creşterea gradului de confort şi siguranţă în clădirile publice aflate în administrarea acesteia. Operarea si întreţinerea investiţiei se va realiza cu personal propriu care va fi instruit şi specializat în utilizarea maşinilor/utilajelor /echipamentelor/reţelelor care constituie investiţia. Infrastructura creată va fi utilizată pentru a asigura necesarul de energie termică pentru clădirile aflate în administrarea UAT Telciu şi va funcţiona aprox. 2000 ore/an. Instalaţia are elasticitatea funcţională de a se adapta utilizării sezoniere (pornire uşoară fără costuri energetice speciale).
Contact
MARIUS DANCIUprimariatelciu_bn@yahoo.com- CompetitionType
- Bistriţa-NăsăudLocation
- 31161000Main codeParts for electrical motors and generators
- 42417310Conveyor belts43328000Hydraulic installations44162200Distribution piping45210000Building construction work45251220Cogeneration plant construction work45255400Fabrication work