Find

  • All tenders
All tenders: Denmark/Metroselskabet I/S/Agreement for the Supply of Spare Parts, Technical Support and Engineering Services

Agreement for the Supply of Spare Parts, Technical Support and Engineering Services

Awarded

The competition has ended and a winner has been selected.

Qualification deadline
Nov 25, 2025Expired
Procedure
Without prior noticeTwo stages
Agreement
Buying goodsuntil Mar 2045

Brief

Metroselskabet I/S har inngått en avtale med Hitachi Rail STS S.p.A. om levering av reservedeler, teknisk support og ingeniørydelser til Københavns Metro M1-M4 linjene, inkludert fremtidige utvidelser, med en varighet frem til 29. september 2032, og mulighet for forlengelse i opptil 144 måneder (til senest 29. september 2044), til en verdi av 500 millioner DKK. Leveransene omfatter reservedeler, reparasjoner av reservedeler, teknisk support (on-site med strenge responstider) og ingeniørydelser (remote) relatert til spesifikke delsystemer av passasjerkjøretøyer og automatisk togkontroll.

Specialized Railway Equipment

Result

TED
  • HITACHI RAIL STS S.p.A.
    Winner
  • Number of tenders received
    1
  • Contract value
    DKK 500,000,000

Previous winners

  • Who are you up against?

    The suppliers who have won similar contracts at Metroselskabet I/S

Will you bid?

The agent sets up the bid and writes the first draft. Free for 14 days.

From the notice

  • Previously, Metroselskabet I/S (hereafter “Metroselskabet”) tendered out the transportation system contracts for the M1-M4 lines of the Copenhagen Metro. The contracts were awarded to Hitachi Rail STS S.p.A. (hereafter “the Supplier”). Under the contracts, the Supplier has provided a number of systems / assets. These systems / assets include, in particular, passenger vehicles and automatic train control (ATC) (and are hereafter collectively referred to as “the Systems”). The Systems are essential for the operation and functionality of the Copenhagen Metro and are generally characterized by a very high degree of technical complexity and by their reliance on specialized knowledge and insight into the Systems, their coherence, software, etc. on a deeper level. Due to technical reasons and exclusive rights, the Supplier is the only economic operator who is able to supply certain specific spare parts, repairs of spare parts, technical support (on-site and subject to strict response times) and engineering services (remote) related to certain subsystems of the Systems (hereafter “the Deliverables”). Metroselskabet therefore intends to conclude a new agreement with the Supplier covering supply of the Deliverables (hereafter “the Agreement”). The scope of the Agreement encompasses Deliverables for all existing lines (M1-M4), including future extensions to these lines to the extent that the Systems will also be used for such extensions. Further, the scope of the Agreement also includes Deliverables for interfaces from the passenger vehicles and the ATC to other elements of the transportation system. The Agreement shall supplement the contract regarding operation and maintenance of the Copenhagen Metro M1-M4 (hereafter “the O&M Contract”) which has been put out to tender by Metroselskabet, see Contract Notice No. 471641-2025 (and potentially also later O&M contracts). The O&M Contract will include the vast majority of services, parts, etc. required for the metro. As an example, the operator under the O&M Contract will be responsible for the greater part of the fault finding, corrective and preventive maintenance, etc., whereas the Supplier will only be engaged when an issue cannot be resolved by the operator / requires support on higher and more complex maintenance levels. The Agreement is expected to be concluded in the fall of 2025 after which a mobilization period shall commence. The actual commencement of the Agreement will, with certain exceptions, occur when the O&M Contract becomes effective (expected in September 2026). The duration of the Agreement shall be until the 29 September 2032. However, Metroselskabet may extend the Agreement for a total of up to 144 months (that is, until 29 September 2044, at the latest). Further, the Supplier shall be available for providing assistance for a period of up to 6 months after the expiry or termination of the Agreement in order to facilitate the transition to a future scenario where the Deliverables, in whole or in part, are no longer required (due to e.g. the end of life of the Systems).

  • Contact

    KET@m.dk
  • Type
    Result · Prequalification
  • Location
    Københavns omegn
  • Main code
    Parts of railway or tramway locomotives or rolling stock; railways traffic-control equipment
    34630000
  • 34631000Parts of locomotives or rolling stock34632000Railways traffic-control equipment50220000Repair, maintenance and associated services related to railways and other equipment71311230Railway engineering services71356300Technical support services

Similar active competitions

  • DSB SOV

    Specialized Railway Equipment

    Tender regarding S-train Spare Parts and Maintenance agreement

    DSB needs a supplier for a 15-year framework agreement covering spare parts and related services for its S-train fleet, with an estimated total value of DKK 125–175 million and a maximum value of DKK 250 million. Deliverables include OEM or equivalent S-train parts, including SIBAS and traction parts; repairs; replacement parts and software, including re-engineered parts and new products; and obsolescence management. The procurement is focused on Østsjælland, and the parts and components must meet OEM-equivalent standards to avoid lengthy safety processes. The competition includes prequalification followed by tenders and individual negotiations, although DSB may award based on initial tenders. Suppliers must provide up to four references demonstrating experience repairing specified critical components in operational use and delivering SIBAS32 software and components communicating with a CBTC system, as well as evidence of a robust supply chain for selected parts throughout the contract. Offers are evaluated on price (50%), security of supply (40%) and delivery time for OEM parts (10%).

    Framework agreement with qualification
    Jan 8, 2027(42 days)
    DKK 250,000,000
  • Øresundsbro Konsortiet I/S

    Railway Technical Services

    Järnvägsunderhåll

    Øresundsbro Konsortiet I/S behöver järnvägsunderhållstjänster för Øresundsbron genom ett ramavtal med ett maximalt värde på 250 miljoner danska kronor; den angivna takvolymen är 350 miljoner danska kronor. Uppdraget avser reparation, underhåll och tillhörande tjänster för järnvägar och utrustning, med leverans i Köpenhamnsområdet.

    Framework agreement
    Jan 31, 2027(65 days)
    DKK 250,000,000
  • Københavns Kommune

    Aircraft maintenance and flight services

    Reparation og vedligeholdelse af Københavns Kommunes driftsmateriel

    Københavns Kommune – Klima-, Miljø- og Teknikforvaltningen søger leverandører til reparation og vedligeholdelse af kommunens køretøjer og driftsmateriel gennem delaftaler som rammeaftaler med én leverandør pr. delaftale. Aftalerne løber i 2 år og har en samlet maksimal værdi på 80 millioner kroner. Opgaven omfatter som udgangspunkt alt driftsmateriel, men enkelte køretøjer eller materiel kan være dækket af særskilte aftaler; materieloversigten ændres løbende, når materiel udgår eller anskaffes. Arbejdet udføres i København. Delaftalerne har hver deres materielafgrænsning.

    Framework agreement
    Dec 3, 2026(6 days)
    DKK 80,000,000