ALFAGEN – ALUMINIUM ALLOY FURNACE FOR VERTICAL DIRECT CHILL ROLLING SLAB INGOT CASTING FACILITY
Cancelled
The competition has been cancelled.
- Deadline
- Apr 19,Expired
- Award
- Technical parameters, weight 40 and 1 more
Brief
AL INVEST Břidličná, a.s. has cancelled the competition for the supply of melting equipment for casting of ingots of aluminium semi-products, including supervision of assembly, due to lack of funding. The procurement was for machinery for the metal industry and related parts, with award criteria focusing on tender price (55%), technical parameters (40%), and warranty period (5%). Two bids were received.
Prosjekteringstjenester
Result
- Reason for cancellationDecision of the buyer because of insufficient funds
- 2Number of tenders received
Previous winners
Who are you up against?
The suppliers who have won similar contracts at AL INVEST Břidličná, a.s.
Will you bid?
The agent sets up the bid and writes the first draft. Free for 14 days.
Award Criteria
Description
Tender price in EUR exclusive of VAT
Source
No source found in the documents. Check the weight against the tender documents.
Description
The total number of points out of the scored criteria as per the data specified in Annex No. 5 shall be evaluated. Under this evaluation criterion, the Contracting Authority shall assess the following sub-criteria: Annex 5 Technical conditions: 1. The deadline for providing the documentation of construction readiness from the contract conclusion 2. The manufacturer will use for combustion of VOC in furnaces The total score for the evaluation sub-criterion “Technical parameters” is given by the sum of the points obtained under the individual sub-criteria no. 1 and 2 in Annex No. 5 to the Tender Documentation – Technical Conditions. The max. total score that can be achieved by a Participant under the evaluation sub-criterion “Technical Parameters” is 100. The Participant shall fill out the offered values of the aforementioned sub-criteria no. 1 and 2 in Annex No. 5 to the Tender Documentation – Technical Conditions. Detailed information is available in Tender Documentation on the Contracting Authority’s profile.
Source
No source found in the documents. Check the weight against the tender documents.
Description
Warranty period in months The warranty period expressed in months from the date of the Public Contract handover and acceptance shall be evaluated. The minimum acceptable warranty period shall be 24 months. The maximum acceptable warranty period shall be 60 months.
Source
No source found in the documents. Check the weight against the tender documents.
From the notice
The subject of the public contract is the supply of melting equipment for casting of ingots of aluminium semi products, including supervision of assembly. The subject of the Public Contract shall also include all tasks connected with the work completion. Detailed technical specifications of the subject of the Public Contract are provided in Annex No. 3 to the Tender Documentation – Technical Specification.
Contact
Ing. Helena Struškováhelena.struskova@alinvest.cz- ResultType
- Moravskoslezský krajLocation
- 43700000Main codeMachinery for metallurgy and associated parts
- 42330000Smelting furnaces43720000Casting machines71320000Engineering design services