Find

  • All tenders
Ireland: Tenders/Presentation Secondary School (Warrenmount)/Alterations and Extension to Presentation Secondary School, Warrenmount, Dublin 8,

Alterations and Extension to Presentation Secondary School, Warrenmount, Dublin 8,

Awarded

The competition has ended and a winner has been selected.

Deadline
Jun 15,Expired
Award
Procedure
OpenSingle stage
Agreement
Construction work
Estimated value
€1.8Mover 1 year

Brief

Presentation Secondary School (Warrenmount) has entered into an agreement with Presentation Secondary School Warrenmount for alterations and an extension to Presentation Secondary School, Warrenmount, Dublin 8. The works include the demolition of an existing boiler room, provision of a standalone single-storey Special Education Unit, an external glazed canopy, a new enclosed external soft play area, a standalone single-storey maintenance room, a new single-storey boiler room, and modifications to the existing vehicular and pedestrian entrances, along with associated site works. The contract has a duration of 12 months and a final value of 1,792,800 EUR. Five bids were received for this contract.

Bygg og anlegg - Oppføring og konstruksjon av bygninger

Result

TED
  • Presentation Secondary School Warrenmount
    Winner
  • Number of tenders received
    5
  • Contract value
    €1,792,800

Previous winners

  • Who are you up against?

    The suppliers who have won similar contracts at Presentation Secondary School (Warrenmount)

Will you bid?

The agent sets up the bid and writes the first draft. Free for 14 days.

Award Criteria

  • Description

    MEAT

    Source

    No source found in the documents. Check the weight against the tender documents.

From the notice

  • Proposed demolition of existing Boiler Room to rear yard and provision of a standalone single storey structure consisting of a Single Classroom Special Education Unit (proposed floor area = 223sqm) to the rear yard of the existing School (existing School overall floor area = 2623sqm), external glazed canopy connecting back to main school with new enclosed external soft play area and provision of a standalone single storey Maintenance Room to front yard (proposed floor area = 13sqm), provision of new single storey Boiler Room to the side of current school (proposed floor area = 12sqm), works to modify and widen the existing gated vehicular entrance and provide a new gated pedestrian entrance to existing public footpath, together with all associated site works.

  • Contact

    kris@mclarchitecture.ie
  • Type
    Result
  • Location
    Dublin
  • Main code
    Secondary school construction work
    45214220

Similar active competitions

  • Bunscoil Rís Edmund Rice Senior Primary School

    Oppføring av bygninger

    Bunscoil Ris, Castlemoyle, New Ross - Special Education Needs Unit Works

    Bunscoil Rís Edmund Rice Senior Primary School needs construction works for a 12-month project with a maximum total contract value of €1.95 million. The project involves a two-storey extension to the existing school building in Ireland’s South-East region, with a special education needs unit on the ground floor, four special education teaching rooms on the first floor, and associated site and ancillary works.

    Competition
    Dec 3, 2026(11 days)
    €1,950,000
  • St Edward's National School (Ballytivnan), Sligo

    Bygg og anlegg - Oppføring og konstruksjon av bygninger

    Construction of Single Storey Extension to St. Edwards NS, Clarion Rd, Sligo

    St Edward’s National School (Ballytivnan), Sligo, needs construction of a single-storey extension to the north side of its existing school building, with a 12-month project duration and a maximum total value of €775,000. The works include one new classroom, four special education teaching rooms, connections to existing site services, alterations to an Irish Water drop manhole, and associated site works at the school on Clarion Road, Ballytivnan, Sligo.

    Competition
    Nov 23, 2026(1 day)
    €775,000
  • Office of Public Works (OPW)

    Bygg og anlegg - Oppføring, renovering og vedlikehold av bygninger

    National Centre for Research and Remembrance | Phase 3-B Main Works | Main Contractor and Project Supervisor Construction Stage (PSCS)

    The Office of Public Works (OPW) seeks a main contractor and Project Supervisor Construction Stage (PSCS) to deliver the 24-month Phase 3B main works for the National Centre for Research and Remembrance in Dublin. The project includes converting and conserving the former convent and laundry into a research and remembrance centre with archival storage, exhibition and conservation spaces; constructing a new educational facility; and conserving and extending community family and parenting support facilities, including works to the protected Scots Church façade. Associated landscaping, access, bicycle parking, site infrastructure and related works are also included. The notice lists a maximum total contract value of €1, which appears to be a placeholder rather than a meaningful project estimate.

    Competition with qualification
    Dec 17, 2026(25 days)
    €1