Athy Rugby Football Club needs a suitably qualified Design and Build Contractor for the removal and lawful disposal of asbestos roof materials, replacement of the clubhouse roof with a new insulated composite roof system, and the design, supply, installation, commissioning and support of a Solar PV Array, Battery Energy Storage System (BESS) and Smart Energy Control System, with a maximum total value of 275,000 EUR over 3 months. The project involves removing approximately 830 m2 of asbestos-containing roof coverings and installing a new insulated roof system with a minimum 50-year design life. The Smart Energy Control System must optimize energy generation, storage, and consumption, integrate with the existing generator, manage battery charging and discharge, support floodlighting loads, and include a secure web-based monitoring platform and smartphone application. The project location is Dublin. Tenderers must attend a mandatory pre-tender site inspection and measurement survey.
Bygg og anlegg - Oppføring, renovering og vedlikehold av bygninger
Previous winners
Who are you up against?
The suppliers who have won similar contracts at Bord Bia (Irish Food Board)
Will you bid?
The agent sets up the bid and writes the first draft. Free for 14 days.
From the notice
Athy Rugby Club wishes to appoint a suitably qualified Design and Build Contractor for the removal and lawful disposal of asbestos roof materials, replacement of the clubhouse roof with a new insulated composite roof system, and the design, supply, installation, commissioning and support of a Solar PV Array, Battery Energy Storage System (BESS) and Smart Energy Control System. The works include the removal and disposal of approximately 830 m2 of asbestos-containing roof coverings and associated asbestos gutters and downpipes. A new insulated roof system with a minimum 50-year design life and new gutters and downpipes shall be installed. Tenderers shall attend a mandatory pre-tender site inspection and measurement survey. All dimensions and quantities are indicative only and tenderers shall rely on their own measurements. No adjustment to the Contract Sum will be permitted for quantity or measurement differences that could reasonably have been identified before tender submission. The successful contractor shall be responsible for all asbestos-related compliance, removal, transportation, disposal documentation and certification. The Smart Energy Control System shall optimise energy generation, storage and consumption, integrate with the existing generator, manage battery charging and discharge, support floodlighting loads and include a secure web-based monitoring platform and smart phone application. The project is part-funded through the LEADER Programme.
Contact
aidan@bepro.ie- CompetitionType
- DublinLocation
- 45260000Main codeRoof works and other special trade construction works
- 09330000Solar energy09332000Solar installation31210000Electrical apparatus for switching or protecting electrical circuits31230000Parts of electricity distribution or control apparatus31600000Electrical equipment and apparatus45261213Metal roof-covering work45261410Roof insulation work45310000Electrical installation work71314000Energy and related services72220000Systems and technical consultancy services90650000Asbestos removal services