Find

  • All tenders
All tenders: Spain/Aena. Presidencia. Consejero Delegado/Aumento De Ancho De Franja. Aeropuerto De A Coruña

Aumento De Ancho De Franja. Aeropuerto De A Coruña

Published deadline passed

The published deadline has passed. For multi-stage competitions a later tender deadline may still apply — check the notice or portal for the current phase.

Qualification deadline
Dec 23, 2025Expired
Award
Procedure
With negotiationTwo stages
Agreement
Construction work
Estimated value
€6.9Mover 20 months

Brief

Aumento De Ancho De Franja. Aeropuerto De A Coruña

Register interest

Previous winners

  • Who are you up against?

    The suppliers who have won similar contracts at Aena. Presidencia. Consejero Delegado

Will you bid?

The agent sets up the bid and writes the first draft. Free for 14 days.

Award Criteria

  • Description

    Precio.

    Source

    No source found in the documents. Check the weight against the tender documents.

From the notice

  • Aumento De Ancho De Franja. Aeropuerto De A Coruña

  • Contact

    Aena. Presidencia. Consejero DelegadoPLACSP.Aena.DirecciondeContratacion@aena.es
  • Type
    Competition · Prequalification
  • Location
    A Coruña
  • Main code
    Construction work for airfields, runways and manoeuvring surfaces
    45235000

Similar active competitions

  • Direção Regional das Obras Públicas

    Empreitada de conceção-construção da Ampliação e Remodelação da Aerogare e do Edifício para Serviço de Salvamento e Luta Contra Incêndios (SSLCI) do Aeródromo da Ilha do Corvo

    A Direção Regional das Obras Públicas pretende contratar, por empreitada de conceção-construção, a ampliação e remodelação da aerogare e do edifício do Serviço de Salvamento e Luta Contra Incêndios (SSLCI) do Aeródromo da Ilha do Corvo, na Região Autónoma dos Açores. O contrato terá duração de 900 dias e valor máximo total de 5,18 milhões de euros; a adjudicação será baseada exclusivamente no custo (100%).

    Competition
    Feb 8, 2027(72 days)
    €5,180,000
  • Aena. Presidencia. Consejero Delegado

    Building technical consultancy

    Servicio De Desarrollo E Implantación De La Metodología De Construcción Sostenible En Aena S.M.E, S.A.

    Aena S.M.E., S.A. necesita desarrollar e implantar una metodología de construcción sostenible durante un contrato de servicios de 5 años, con un valor máximo total de 6.993.930 euros. El trabajo se prestará en Madrid y la adjudicación se basará en la evaluación técnica (51 %) y el precio (49 %).

    Competition
    Dec 15, 2026(17 days)
    €6,993,930
  • Aena. Dirección del Aeropuerto Adolfo Suárez Madrid-Barajas

    Building technical consultancy

    A.T. Redacción De Proyectos De Actuaciones Descentralizadas - Aeropuerto Adolfo Suarez Madrid-Barajas

    Aena, a través de la Dirección del Aeropuerto Adolfo Suárez Madrid-Barajas, necesita servicios de asistencia técnica para redactar proyectos de actuaciones descentralizadas durante 2 años, con un valor máximo total de 1 millón de euros. El trabajo se realizará en el aeropuerto de Madrid-Barajas e incluye preparación y diseño de proyectos y estimación de costes. La adjudicación se basará exclusivamente en el precio (100 %).

    Competition
    Dec 21, 2026(23 days)
    €1,000,000