Bassin d'orage MO.AL.RB01 Altwies
Expired
The competition has expired without a winner being announced.
- Deadline
- Feb 22, 2024Expired
- Procedure
- OpenSingle stage
- Agreement
- Construction work
Brief
CONSTRUCTION DU BASSIN D’ORAGE MO.AL.RB01 A ALTWIES ET POSE D’UN COLLECTEUR VERS MONDORF-LES-BAINS Travaux de terrassement : 8.230 m3 Remblai en concassés, sable, grenaille : 6.750 m3 Travaux de blindage (paroi berlinoise) : 610m2 Travaux de béton / béton armé : 745 m3 Tuyaux en PP DA315 : 400 ml Tuyaux en b.a. DN400-1200 : 70 ml Section rectangulaire en b.a. : 1,50x1,05 m : 32 ml
Previous winners
Who are you up against?
The suppliers who have won similar contracts at SIDEST
Will you bid?
The agent sets up the bid and writes the first draft. Free for 14 days.
From the notice
CONSTRUCTION DU BASSIN D’ORAGE MO.AL.RB01 A ALTWIES ET POSE D’UN COLLECTEUR VERS MONDORF-LES-BAINS Travaux de terrassement : 8.230 m3 Remblai en concassés, sable, grenaille : 6.750 m3 Travaux de blindage (paroi berlinoise) : 610m2 Travaux de béton / béton armé : 745 m3 Tuyaux en PP DA315 : 400 ml Tuyaux en b.a. DN400-1200 : 70 ml Section rectangulaire en b.a. : 1,50x1,05 m : 32 ml
Contact
info@sidest.lu- CompetitionType
- 45232410Main codeSewerage work