Find

  • All tenders
All tenders: Switzerland/Sekundarschulgemeinde Weinfelden (MLR Baumanagement GmbH)/BKP 224.1 Waterproofing Membranes Flat Roof | Vertical Extension of TBS5 Gymnasiums, Weinfelden

BKP 224.1 Waterproofing Membranes Flat Roof | Vertical Extension of TBS5 Gymnasiums, Weinfelden

Awarded

The competition has ended and a winner has been selected.

Award
Procedure
OpenSingle stage
Agreement
Construction work

Brief

Sekundarschulgemeinde Weinfelden has awarded a works contract to Kämpfer + Co. AG for waterproofing membranes on the flat roof of a gymnasium extension in Thurgau, Switzerland, for CHF 414,464. The project adds two floors for secondary-school use, with construction taking place mainly while the school remains operational. Three bids were received.

Bygg og anlegg - Oppføring og konstruksjon av bygninger

Result

TED
  • EN_Kämpfer + Co. AG
    Winner
  • Number of tenders received
    3
  • Contract value
    CHF 414,464

Previous winners

  • Who are you up against?

    The suppliers who have won similar contracts at Sekundarschulgemeinde Weinfelden (MLR Baumanagement GmbH)

Will you bid?

The agent sets up the bid and writes the first draft. Free for 14 days.

Award Criteria

  • Description

    Award criteria

    Source

    No source found in the documents. Check the weight against the tender documents.

From the notice

  • Subject of the Contract: As part of the project, the existing gymnasium will be extended by adding two additional floors for use as a secondary school. The extension will be constructed using timber element construction. The new/extended staircases will be built as double-shell structures in exposed concrete. The two-story extension will include 12 classrooms (one of which will be equipped as a learning space), 7 group rooms, and two staff rooms with a terrace. At the heart of the school, a single-story atrium (open to the outside climate) is designed. Special Conditions: The renovation will take place predominantly during ongoing operations. A complete closure of the gymnasium is only planned for the duration of the timber construction work for the extension

  • Contact

    r.gubser@schuleweinfelden.ch
  • Type
    Result
  • Location
    Thurgau
  • Main code
    Construction work for buildings relating to education and research
    45214000
  • 45210000Building construction work45260000Roof works and other special trade construction works

Similar active competitions

  • Sekundarschulgemeinde Weinfelden (MLR Baumanagement GmbH)

    Bygg og anlegg - Oppføring og konstruksjon av bygninger

    Cost Code 273.3 – General Carpentry Work | Vertical Extension of Gymnasiums TBS5, Weinfelden

    Sekundarschulgemeinde Weinfelden, managed by MLR Baumanagement GmbH, needs general carpentry works for the vertical extension of the TBS5 gymnasium in Weinfelden, Thurgau. The works include cabinets, glazing for group rooms and handrails, as part of a timber-built, two-storey extension providing 12 classrooms, 7 group rooms and staff facilities. Renovation will take place mainly while the gymnasium remains in operation, with closure planned only during timber construction.

    Competition
    Dec 1, 2026(6 days)
  • Sekundarschulgemeinde Weinfelden (MLR Baumanagement GmbH)

    Bygg og anlegg - Oppføring og konstruksjon av bygninger

    BKP 281.5 Artificial Stone and Tile Flooring | Extension of the TBS5 Gymnasium Building, Weinfelden

    Sekundarschulgemeinde Weinfelden, managed by MLR Baumanagement GmbH, requires the supply and professional installation of artificial-stone flooring, including stair treads and landings, and wall tiling in the sanitary facilities of the TBS5 gymnasium extension in Weinfelden, Thurgau. The works include substrate preparation, cutting, fitting, edges, joints, transitions and finishing, and must comply with the tender documents, technical requirements and applicable standards. The extension adds two floors for secondary-school use, with 12 classrooms, 7 group rooms and staff rooms; work will largely take place while the facility remains in operation. The stated award criterion is quality.

    Competition
    Nov 29, 2026(4 days)
  • Politische Gemeinde Sargans

    Bygg og anlegg - Oppføring og konstruksjon av bygninger

    789 NB Schulhaus- & 3-fach Kindergarten Malerva Sargans - TO2 Schulhaus - BKP 224 Bedachungsarbeiten

    Die Politische Gemeinde Sargans benötigt Bauarbeiten für das Teilobjekt TO 2 – Schulhaus des Neubauprojekts Malerva in St. Gallen. Das Projekt umfasst ein Schulhaus mit Turnhalle, einem 3-fach Kindergarten und einem Aussensportplatz. Die Vergabe erfolgt nach Qualitätskriterien.

    Competition
    Nov 27, 2026(2 days)