BKP 242 Heating Systems / 246 Refrigeration System | Vertical extension of Gymnasiums TBS5, Weinfelden
Awarded
The competition has ended and a winner has been selected.
- Deadline
- Feb 13,Expired
- Award
Brief
Die Sekundarschulgemeinde Weinfelden (MLR Baumanagement GmbH) hat einen Vertrag mit EN_Die Klimamacher AG über Bauarbeiten im Zusammenhang mit der vertikalen Erweiterung der Turnhallen TBS5 in Weinfelden abgeschlossen. Der Vertrag hat einen Wert von 305.251 CHF. Im Rahmen des Projekts wird die bestehende Turnhalle um zwei Stockwerke für die Nutzung als Sekundarschule erweitert, wobei die Renovierung hauptsächlich während des laufenden Betriebs stattfindet. Die Arbeiten umfassen die Installation von Heizungs- und Kühlsystemen, wobei die bestehende Hackschnitzelheizung der Schule genutzt und durch Unterflurheizung sowie Kühlanlagen ergänzt wird.
Bygg og anlegg - Oppføring og konstruksjon av bygninger
Result
- EN_Die Klimamacher AGWinner
- 7Number of tenders received
- CHF 305,251Contract value
Previous winners
Who are you up against?
The suppliers who have won similar contracts at Sekundarschulgemeinde Weinfelden (MLR Baumanagement GmbH)
Will you bid?
The agent sets up the bid and writes the first draft. Free for 14 days.
Award Criteria
Description
Award criteria
Source
No source found in the documents. Check the weight against the tender documents.
From the notice
Subject of the Contract: As part of the project, the existing gymnasium will be extended by adding two additional floors for use as a secondary school. The extension will be constructed using timber element construction. The new/extended staircases will be built as double-shell structures in exposed concrete. The two-story extension will include 12 classrooms (one of which will be equipped as a learning space), 7 group rooms, and two staff rooms with a terrace. At the heart of the school, a single-story atrium (open to the outside climate) is designed. Special Conditions: The renovation will take place predominantly during ongoing operations. A complete closure of the gymnasium is only planned for the duration of the timber construction work for the extension Heating: The existing woodchip heating system of the school has sufficient capacity to cover the extension as well. Heat distribution will be provided via underfloor heating. Through a changeover switch in the technical center, slight cooling can also be achieved via the underfloor heating. A heating/cooling coil in the ventilation unit allows the supply air to be heated in winter and slightly cooled in summer. The extension will include a substation on the 2nd floor, which will be connected to the main line in the technical center located in the basement of the gymnasium, requiring minor adjustment work. Cooling: Two chillers will be installed in cascade on the new flat roof, enabling the new rooms to be slightly cooled via the underfloor heating and the ventilation system.
Contact
r.gubser@schuleweinfelden.ch- ResultType
- ThurgauLocation
- 45214000Main codeConstruction work for buildings relating to education and research