Find

  • All tenders
All tenders: Ireland/Waterford and Wexford Education and Training Board_110494/Bridgetown College Wexford - Heating Centre Upgrade

Bridgetown College Wexford - Heating Centre Upgrade

Awarded

The competition has ended and a winner has been selected.

Award
Procedure
OpenSingle stage
Agreement
Construction work
Estimated value
€290Kover 18 months

Brief

Waterford and Wexford Education and Training Board has awarded Emcor Engineering Ltd. works to upgrade the heating centre at Bridgetown College in the South-East of Ireland. The project involves removing the existing oil-fired boiler plant and redundant services, and installing new LPG-fired boilers and associated heating-centre equipment. The contract runs for 18 months and has a final value of €234,420, against a maximum value of €290,000; seven bids were received.

Anleggs- og infrastrukturbygging

Result

TED
  • Emcor Engineering Ltd
    Winner
  • Number of tenders received
    7
  • Contract value
    €234,420

Previous winners

  • Who are you up against?

    The suppliers who have won similar contracts at Waterford and Wexford Education and Training Board_110494

Will you bid?

The agent sets up the bid and writes the first draft. Free for 14 days.

Award Criteria

  • Description

    Per tender documents

    Source

    No source found in the documents. Check the weight against the tender documents.

From the notice

  • The projects involves the decommissioning and removal of existing oil-fired boiler plant and redundant services and installation of new LPG-fired boiler plant and associated heating centre equipment, with associated works.

  • Contact

    thereseennis@wwetb.ie
  • Type
    Result
  • Location
    South-East
  • Main code
    Construction work
    45000000
  • 45232141Heating works45259300Heating-plant repair and maintenance work45259900Plant upgrade work

Similar active competitions

  • Mount St. Michael Secondary School (Claremorris)

    Bygg og anlegg - Grunnarbeid, vann og kloakk

    Gas Boiler heating system

    Mount St. Michael Secondary School in Claremorris needs works to replace its existing oil boiler heating system with a gas boiler system, upgrade the LPG storage tanks and complete associated civil works. The project is located in Ireland’s West region, has a maximum total value of €275,000 and is expected to take 3 months.

    Competition
    Dec 17, 2026(22 days)
    €275,000
  • Salesian College (Celbridge)_1840

    Kjøle- og ventilasjonsteknologi

    Mechanical Works to Salesian College Celbridge, Co. Kildare (Heating Upgrade)

    Salesian College in Celbridge, County Kildare, requires mechanical works to decommission and replace the existing space-heating installation and heating centre in its main building. The works are to be carried out in Ireland’s Mid-East region over 8 months, with a maximum total contract value of €491,611.50.

    Competition
    Nov 24, 2026(0 days)
    €491,611
  • Midleton CBS Primary School

    Mekaniske installasjoner

    Midleton CBS Primary School, Rosary Place, Midleton, Co. Cork – EWS 2no. Boiler Plant Replacement

    Midleton CBS Primary School requires boiler plant replacement works at its Rosary Place site in Midleton, County Cork, over 1 year, with a maximum total contract value of €200,000. The works include removing the existing plant from both boiler houses and installing wall-mounted boilers, pipework, valves, pumps, headers, a heat exchanger, insulation and boiler-house controls.

    Competition
    Nov 24, 2026(0 days)
    €200,000