All tenders/Bursa Metropolitan Municipality, General Directorate of Bursa Water and Wastewater Administration (BUSKI)/Construction of Gölbaşı Wastewater Treatment Plant - Earthquake Reconstruction Framework Loan

Construction of Gölbaşı Wastewater Treatment Plant - Earthquake Reconstruction Framework Loan

Awarded

The competition has ended and a winner has been selected.

Deadline
Jan 25,Expired
Procedure
OpenSingle stage
Agreement
Construction workover 2 years

Brief

Gölbaşı Municipality has entered into an agreement with RSM Madencilik ve İnşaat for the design and construction of the Gölbaşı Wastewater Treatment Plant in the Eski village of Çataltepe neighbourhood, Gölbaşı District, Adıyaman City, Türkiye. The new plant will replace the earthquake-damaged facility, increasing its capacity from 3,040 m³/day to 11,000 m³/day. The contract has a duration of 24 months and a final value of 7,442,708 €. Two bids were received for this contract.

Result

TED
  • RSM Madencilik ve İnşaat
    Winner
  • Number of tenders received
    2
  • Contract value
    €7,442,708

Previous winners

  • Who are you up against?

    The suppliers who have won similar contracts at Bursa Metropolitan Municipality, General Directorate of Bursa Water and Wastewater Administration (BUSKI)

Will you bid?

The agent sets up the bid and writes the first draft. Free for 14 days.

From the notice

  • The works covered under this contract includes the design and construction of Gölbaşı Wastewater Treatment Plant which is planned to be built and operated by Gölbaşı Municipality in the Eski village of Çataltepe neighbourhood, Gölbaşı District, Adıyaman City. The new wastewater treatment plant will replace the earthquake-damaged facility with an existing capacity of 3,040 m³/day, increasing capacity to 11,000 m³/day.

  • Contact

    Ünal BAYRAMunalbayram@golbasi.bel.tr
  • Type
    Result
  • Main code
    Wastewater treatment plant construction work
    45252127

Similar active competitions

  • Water Services Corporation

    Kjemikalier og vannbehandling

    WSC/T/092/2026 - WORKS - DESIGN, BUILD, TEST AND COMMISSION AN UPGRADE OF THE GOZO WASTEWATER TREATMENT PLANT USING ENVIRONMENTALLY FRIENDLY MEASURES AND FIDIC CONDITIONS FOR THE WATER SERVICES CORPORATION

    Water Services Corporation needs the design, construction, testing and commissioning of an environmentally friendly upgrade to the Gozo Wastewater Treatment Plant, with a maximum total contract value of €25,795,000. The works will provide process and hydraulic resilience and ensure effective treatment of wastewater through at least 2040, upgrading capacity to treat an average of 14,000 cubic metres per day. The contract also includes designing, installing, testing and commissioning a new water reclamation plant to produce an additional 4,000 cubic metres of “New Water” per day. The project will be delivered in two phases under FIDIC conditions in Malta.

    Competition
    Feb 26, 2027(93 days)
    €25,795,000
  • VA SYD

    9977 Utbyggnad Södra Sandby Avloppsreningsverk

    VA SYD behöver en samverkansentreprenör för utbyggnaden av Södra Sandbys avloppsreningsverk i Skåne län. Entreprenadens maximala totalvärde är 400 miljoner kronor.

    Competition with qualification
    Dec 18, 2027(100+ days)
    SEK 400,000,000
  • State Unitary Enterprise Khojagii Manziliyu Kommunali of Fayzobod Region

    Bygg og anlegg - Grunnarbeid, vann og kloakk

    Rehabilitation of the Water Supply and Wastewater System in Fayzobod region, Tajikistan

    State Unitary Enterprise Khojagii Manziliyu Kommunali of Fayzobod Region needs works for the rehabilitation of the water supply and wastewater system in Fayzobod region, Tajikistan. The contract covers the design and construction of new wastewater treatment facilities on the site of the existing plant in Fayzobod, including the demolition of existing structures, connection to external networks, the treated effluent outfall, and bank protection works to the Loyak River. The mandatory works provide a treatment capacity of 1,500 m³/day, with optional works, priced separately, to increase capacity to 3,000 m³/day. The award criteria are based on quality.

    Competition
    Nov 27, 2026(2 days)