Construction of Koh Khsach Tonlea Bridge and Approach Roads (KTB Project)
Planned
The competition has not been announced yet.
- Deadline
- Mar 4, 202799 days left
- Agreement
- Construction work
- Estimated value
- $22.5M
Brief
Cambodia’s Ministry of Public Works and Transport (MPWT) is planning works to construct the Koh Khsach Tonlea Bridge over the Bassac River and its approach roads, including a 330-metre prestressed concrete bridge, deep bored piles, approach embankments, navigation-channel dredging and bank protection. The notice does not specify a process for suppliers to provide feedback or input during the planning phase.
Anleggs- og infrastrukturbygging
Previous winners
Who are you up against?
The suppliers who have won similar contracts at Ministry of Public Works and Transport (MPWT)
Will you bid?
The agent sets up the bid and writes the first draft. Free for 14 days.
From the notice
Construction of the Koh Khsach Tonlea Bridge over the Bassac River connecting Koh Khsach Tonlea island (Sa'ang District, Kandal Province) with National Road 21 (NR21). The works include a 330 m continuous prestressed concrete box girder bridge (span arrangement 40m+75m+100m+75m+40m) built via balanced cantilever method, monolithic reinforced concrete piers, reverse T-abutments, cast-in-place large-diameter bored piles (~50m depth), a multi-cell RC box culvert (2.5mx2.0m), approach embankments, navigation fairway capital dredging, and rock rip-rap bank protection.
Contact
NAY Chamnangktbpmu.eib@gmail.com- PlanningType
- 45221111Main codeRoad bridge construction work