Construction of M3 Cimislia Bypass, km 18+700-km 26+138
Expired
The competition has expired without a winner being announced.
- Deadline
- Jun 5,Expired
- Procedure
- OpenSingle stage
- Agreement
- Construction workover 54 months
Brief
S.A. “Administratia Nationala a Drumurilor” (National Roads Administration) Republic of Moldova needs construction services for the M3 Cimislia Bypass, covering 7.4 km. The project involves building a new road, including side roads, minor intersections, retaining walls, underground drainage systems, slope protection, bridges, overpasses, culverts, and a new pavement structure. It also includes the arrangement of power lines (10kV – 110kV), underground communication cables, and gas lines. The contract duration is 54 months, with 30 months for works completion and a 24-month defects notification period.
Previous winners
Who are you up against?
The suppliers who have won similar contracts at S.A. “Administratia Nationala a Drumurilor” (National Roads Administration) Republic of Moldova
Will you bid?
The agent sets up the bid and writes the first draft. Free for 14 days.
From the notice
The project “Construction Works on M3 Cimislia bypass, 7.4 km” consists in the construction of a new road. Cimislia Bypass Road is an extension of the M3 road that bypasses Cimislia city to the northwest and reconnects with the M3 road south of Cimislia. The works to be carried out includes the new road construction including arrangement of side roads to the agricultural fields and arrangement of minor intersections. Construction of retaining wall and underground drainage system (manholes), slope protection, bridges and overpasses constructions. Arrangement of drainage facilities as construction of the culverts, consolidated lined side drains and outside interception ditches. The pavement structure consists of construction of the embankment, base course, stabilized base, and new asphalt layers. Project include the arrangement of power lines of 10kV – 110kV, arrangement of underground communication cables, and arrangement of gas lines. Time for Works’ Completion is 30 months, and 24 months of the Defects Notification Period.
Contact
Mrs. Natalia Capatinaprocurement@andsa.md- CompetitionType
- 45000000Main codeConstruction work
- 45233122Ring road construction work45233123Secondary road construction work45233124Trunk road construction work