Construction of Rize Wastewater Collection System (Lot 2) - Completion Works
Expired
The competition has expired without a winner being announced.
- Deadline
- May 12,Expired
- Award
Brief
The Department of Project Implementation (DoPI), General Directorate of European Union and Foreign Relations (DGEUFR), Ministry of Environment, Urbanization and Climate Change (MoEUCC) in Türkiye needs construction services for the Rize Wastewater Collection System (Lot 2) - Completion Works, with a contract duration of 365 days. The project involves the construction of approximately 3.039 km of wastewater collector pipeline, including ground improvement works, a 30m special river crossing, three prefabricated GRP package type wastewater pumping stations, approximately 12m of forced mains, and 87 manholes. It also includes the installation of a complementary SCADA system, preparation of as-built plans, CCTV inspection, leakage tests, completion of non-completed bridge crossing works, correction of non-conformities, provision of a Certificate of Origin, and preparation of as-built plans for completed works. The contractor must carefully plan works to maintain wastewater collection services during the replacement of existing pipelines. The award criterion is price, weighted at 100%.
Vei- og kabeltrekking
Previous winners
Who are you up against?
The suppliers who have won similar contracts at Department of Project Implementation (DoPI), General Directorate of European Union and Foreign Relations (DGEUFR), Ministry of Environment, Urbanization and Climate Change (MoEUCC)
Will you bid?
The agent sets up the bid and writes the first draft. Free for 14 days.
Award Criteria
Description
Please consult the procurement documents.
Source
No source found in the documents. Check the weight against the tender documents.
From the notice
The scope of work is summarized as bellow: a) Construction of approximately 3.039 km wastewater collector pipeline, including ground improvement works, b) Construction of approximately 30 m Special Crossing of river by pipejacking and/or horizontal drilling wastewater collector pipeline, c) Construction of 3 prefabricated GRP (Glass Reinforced Plastic) Package Type Wastewater Pumping Station (Bağdatlı, Çiftekavak and Hal) d) Approximately 12 m forced mains and associated structures, e) Construction of approximately 87 manholes, including relevant ground improvement works f) Installation of complementary SCADA System which is composed of operator workstation system, SCADA software and licences, other relevant software and licences, and system accessories g) Preparation of wastewater collection system network as-built plans for constructed sewer mains, h) Complementary works and documentation, including: 1. CCTV inspection for approximately 6,920 m installed pipes, 2. Leakage test for approximately 963 m installed pipes, 3. Leakage test for approximately 44 manholes, 4. Completion of non-completed bridge crossing works, 5. Correction of non-conformities, 6. Provision of Certificate of Origin in accordance with Sub-Clause 7.9, 7. Preparation and submission of as-built plans for completed works. The design for the wastewater collection system involves, in most cases, the complete replacement of the existing pipelines. As these existing pipelines are “live” the Contractor shall need to carefully plan the works to maintain wastewater collection services to customers as much as possible. This issue shall be valid for all “live” wastewater pumping stations. During this planning, the service continuity should be in the first priority. System temporary rearrangements to be done for service continuity shall be taking into consideration during pricing. In wastewater collection system, package wastewater pumping station shall be supplied and installed during the construction of new one. These facilities shall be in operation until the final acceptance.
Contact
abyd.ihale@csb.gov.tr- CompetitionType
- 45232400Main codeSewer construction work
- 42961200Scada or equivalent system45232423Sewage pumping stations construction work