• Search


    Construction of Two Accommodation Pod Buildings at Biddy’s Crossroads, Glencolmcille, Co. Donegal

    MECL Ireland Ltd

    Construction of Two Accommodation Pod Buildings at Biddy’s Crossroads, Glencolmcille, Co. Donegal

    1. Competition notice published

      Aug 30, 4:15 PMAugust 30, 2026 4:15 PM
    2. Questions deadline

      Sep 11, 4:00 PMSeptember 11, 2026 4:00 PM
    3. Tender submission deadline

      Oct 2, 4:00 PMOctober 2, 2026 4:00 PM
    4. Tender validity period

      Mar 31, 4:00 PMMarch 31, 2027 4:00 PM

    Brief

    Tender search/MECL Ireland Ltd/Construction of Two Accommodation Pod Buildings at Biddy’s Crossroads, Glencolmcille, Co. Donegal
    Brief

    Bygg og anlegg - Oppføring og konstruksjon av bygninger

    MECL Ireland Ltd needs construction services for two three-bedroom accommodation pod buildings at Biddy’s Crossroads, Glencolmcille, Co. Donegal, with a maximum total value of 200,000 EUR over 6 months. The works include construction and completion of the buildings, site clearance, foundations, drainage, foul and surface water services, utility connections, access roads, footpaths, circulation and parking areas, external works, landscaping, and all ancillary works. The successful contractor will also be required to undertake the role of Project Supervisor Construction Stage (PSCS).

    About the bid

      MECL Ireland Limited invites tenders from suitably qualified contractors for the construction of two three-bedroom accommodation pod buildings at Biddy’s Crossroads, Glencolmcille, Co. Donegal. The works include the construction and completion of the accommodation buildings together with associated site clearance, foundations, drainage infrastructure, foul and surface water services, utility connections, access roads, footpaths, circulation and parking areas, external works, landscaping and all ancillary works, as detailed in the tender and contract documents. The successful contractor will also be required to undertake the role of Project Supervisor Construction Stage (PSCS). Tenderers must examine the complete tender documentation and submit all required information through the eTenders platform by the stated deadline.

      Contact phone
      0863806653
      Contact email
      mbyrne@mecl-ltd.com
      Address
      Block 9 Airvista Office Park Swords road Santry, d09 C8X9 Dublin

    Custom Assessment Criteria

    Start a free trial to ask your own questions about the tender and get AI-generated answers.

    Award Criteria

      Found no award criteria in the contract notice.

    Qualification requirements

      Found no qualification requirements in the contract notice.

    Previous Contract Winners

    Start a free trial to see who has won similar tenders for this buyer.

    See the full notice

    Contracting authority
    MECL Ireland Ltd
    Title
    Construction of Two Accommodation Pod Buildings at Biddy’s Crossroads, Glencolmcille, Co. Donegal
    Type
    CompetitionPrequalification
    Main code
    45212410Construction work for lodging buildings
    Supplemental codes

    No supplemental codes from buyer…

    Location
    Border
    Estimated value
    €200,000.00
    Duration
    6 months

    Active similar competitions

    • Glamping at the Glebe

      Diverse konstruksjonsmateriell

      3 No. Glamping pods, (2no.1 bedroom pods and 1no.2 bedroom family pod) 1 no. sauna pod, on-site wastewater treatment system, and all associated ancillary works at The Glebe, St. Mullins, Co.Carlow.

      Glamping at the Glebe needs 3 glamping pods (2 one-bedroom and 1 two-bedroom family pod), 1 sauna pod, an on-site wastewater treatment system, and all associated ancillary works at The Glebe, St. Mullins, Co. Carlow, over 6 months, with a maximum total value of 400,000 EUR.

      CompetitionAug 25, 2026
      Sep 25, 2026(4 days)
      €400,000
    • Health and Social Care Professionals Council (CORU)

      Anleggs- og infrastrukturbygging

      Upgrade of Finner Camp Dining Hall to include Water Services Upgrade at Finner Camp, Ballyshannon, Co. Donegal

      The Department of Defence needs construction works/services for the upgrade of Finner Camp Dining Hall, including water services, in Ballyshannon, Co. Donegal. The project has a maximum total contract value of 1 EUR and a duration of 1 year.

      CompetitionSep 14, 2026
      Oct 21, 2026(30 days)
      €1
    • Inny View Self Catering

      Inny View Self Catering

      Inny View Self Catering needs renovation and extension services for an existing dwelling to include a change of use to guest accommodation, with subdivision of the existing dwelling and a new single-storey extension to the rear incorporating one one-bedroom and one two-bedroom self-contained unit. The project also involves the demolition of an existing shed, construction of a new storage shed/garage, and all ancillary site works at Creevagh Beg, Ballymahon, Co Longford. The maximum total contract value is 380,000 EUR, and the project duration is 8 months.

      CompetitionSep 3, 2026
      Sep 23, 2026(2 days)
      €380,000
    • European Dynamics S.A.

      Bygg og anlegg - Oppføring, renovering og vedlikehold av bygninger

      Retender - Restoration and Extension of Stone Cottage, Demolition of Two Stone Outbuildings, and Installation of New WWTS

      Η European Dynamics S.A. χρειάζεται εργασίες αποκατάστασης και επέκτασης μιας πέτρινης αγροικίας, κατεδάφισης δύο πέτρινων βοηθητικών κτισμάτων και εγκατάστασης νέου συστήματος επεξεργασίας λυμάτων (WWTS) στη Νοτιοδυτική περιοχή. Το έργο περιλαμβάνει την κατεδάφιση ενός πέτρινου υπόστεγου και μιας επέκτασης από τούβλα, την ανακαίνιση της παλιάς πέτρινης αγροικίας (νέα πλάκα δαπέδου, νέα στέγη, ανακατασκευή και αρμολόγηση εξωτερικών τοίχων, σοβάτισμα εσωτερικών τοίχων με μονωτικό ασβεστοκονίαμα, νέα παράθυρα και πόρτες, πλήρης εσωτερική διαμόρφωση), την κατασκευή μιας νέας μονώροφης επέκτασης 64 τ.μ., εξωτερικές εργασίες (αποχέτευση, κατασκευή αίθριου) και την κατασκευή ενός νέου συστήματος επεξεργασίας λυμάτων. Η μέγιστη συνολική αξία της σύμβασης ανέρχεται σε 390.000 ευρώ και η διάρκεια του έργου είναι 187 μήνες.

      CompetitionAug 27, 2026
      Sep 30, 2026(9 days)
      €390,000
    • Department of Housing Local Government and Heritage

      Repair of two bridges in Glenveagh National Park

      The Department of Housing Local Government and Heritage needs works for the demolition, repair, and refurbishment of two existing bridges in Glenveagh National Park, Ireland, over 2 months, with a maximum total value of 250,000 EUR. The project involves the replacement of timber bridge decks and balustrades.

      CompetitionSep 2, 2026
      Oct 7, 2026(16 days)
      €250,000