All tenders/Kafr El-Sheikh Water Supply and Sanitation Company (KSWSSC), Project Implementation Unit (PIU)/Construction of Zaghloul El Bahary Wastewater Treatment Plant (WWTP), Design – Build, Defect Liability Year, and Optional One (1) Year of Operation and Maintenance

Construction of Zaghloul El Bahary Wastewater Treatment Plant (WWTP), Design – Build, Defect Liability Year, and Optional One (1) Year of Operation and Maintenance

Awarded

The competition has ended and a winner has been selected.

Procedure
OpenSingle stage
Agreement
Construction work
Estimated value
€23Mover 27 months

Brief

أبرمت شركة كفر الشيخ للمياه والصرف الصحي (KSWSSC)، وحدة تنفيذ المشروع (PIU)، اتفاقية مع شركة المقاولات والصناعات المتخصصة (مجموعة عثمان) وشركة فيوليا لتكنولوجيا المياه مصر لتصميم وبناء وتشغيل وصيانة محطة معالجة مياه الصرف الصحي الجديدة في زغلول البحري (WWTP) بسعة 15,000 متر مكعب/يوم، قابلة للتوسيع إلى 25,000 متر مكعب/يوم بحلول عام 2052. يشمل العقد أعمال البناء والتشغيل التجريبي، وفترة مسؤولية عن العيوب لمدة عام واحد، وخيار تشغيل وصيانة لمدة عام واحد، بالإضافة إلى توفير خدمات التدريب لموظفي الجهة المشترية. تبلغ القيمة النهائية للعقد 24,943,649 يورو، ومدة المشروع 27 شهرًا.

Construction of buildings

Result

TED
  • Specialized Contracting & Industries Co. (Osman Group) & Veolia Water Technologies Egypt
    Winner
  • Number of tenders received
    1
  • Contract value
    €24,943,649

Previous winners

  • Who are you up against?

    The suppliers who have won similar contracts at Kafr El-Sheikh Water Supply and Sanitation Company (KSWSSC), Project Implementation Unit (PIU)

Will you bid?

The agent sets up the bid and writes the first draft. Free for 14 days.

From the notice

  • The work to be carried out under this works contract comprises the permanent works (facilities and systems) related to the new Zaghoul El Bahary WWTP (15,000 m3/d, 2037 expanded to 25,000 m3/d, 2052) in Motobas District, Kafr El Sheikh Governorate, to be designed, constructed, and commissioned; the effective restoration of any defects during the 1-year Defects Liability Period; and the optional 1-year of normal operation and maintenance of the works for the WWTP. The contract comprises also the provision of training services to the Procuring Entity’s personnel duly completed within the Defects Liability Period or the Optional 1 year Operation and Maintenance Period as the case may be, and before the works hand-over. Some minor works of the Plant has been executed by another Contractor in a previous phase. Although not part of the Works, the Contractor shall be aware of its obligations toward these Existing Works as defined in the Contract Documents.

  • Contact

    Eng. Mohamed Hesham, Project Implementation Unit (PIU) Manager (Cell Phone, +20 100 292 2279kswep.piu@gmail.com
  • Type
    Result
  • Main code
    Works for complete or part construction and civil engineering work
    45200000

Similar active competitions

  • Water Services Corporation

    Chemicals and Water Treatment

    WSC/T/092/2026 - WORKS - DESIGN, BUILD, TEST AND COMMISSION AN UPGRADE OF THE GOZO WASTEWATER TREATMENT PLANT USING ENVIRONMENTALLY FRIENDLY MEASURES AND FIDIC CONDITIONS FOR THE WATER SERVICES CORPORATION

    Water Services Corporation needs the design, construction, testing and commissioning of an environmentally friendly upgrade to the Gozo Wastewater Treatment Plant, with a maximum total contract value of €25,795,000. The works will provide process and hydraulic resilience and ensure effective treatment of wastewater through at least 2040, upgrading capacity to treat an average of 14,000 cubic metres per day. The contract also includes designing, installing, testing and commissioning a new water reclamation plant to produce an additional 4,000 cubic metres of “New Water” per day. The project will be delivered in two phases under FIDIC conditions in Malta.

    Competition
    Feb 26, 2027(91 days)
    €25,795,000
  • State Unitary Enterprise Khojagii Manziliyu Kommunali of Fayzobod Region

    Construction - Groundwork, water and sewage

    Rehabilitation of the Water Supply and Wastewater System in Fayzobod region, Tajikistan

    State Unitary Enterprise Khojagii Manziliyu Kommunali of Fayzobod Region needs works for the rehabilitation of the water supply and wastewater system in Fayzobod region, Tajikistan. The contract covers the design and construction of new wastewater treatment facilities on the site of the existing plant in Fayzobod, including the demolition of existing structures, connection to external networks, the treated effluent outfall, and bank protection works to the Loyak River. The mandatory works provide a treatment capacity of 1,500 m³/day, with optional works, priced separately, to increase capacity to 3,000 m³/day. The award criteria are based on quality.

    Competition
    Nov 27, 2026(0 days)
  • Hjørring Vandselskab A/S

    Electrical equipment and lighting

    Ny forbehandling - Hjørring Renseanlæg - El-entreprise

    Hjørring Vandselskab A/S udbyder el-entreprisen i forbindelse med etablering af ny forbehandling på Hjørring Renseanlæg i Nordjylland. Arbejdet omfatter montage af bygherreleverancer, herunder hoved-, bygnings- og maskintavler, frekvensomformere og instrumentering, samt levering og udførelse af øvrige el-tekniske arbejder. Entreprisen skal gennemføres, mens renseanlægget fortsat er i drift, og koordineres med de øvrige entrepriser. Arbejdet varer 20 måneder og har en maksimal værdi på 4 millioner DKK. Udbuddet gennemføres i to faser med forventet prækvalifikation af tre ansøgere; kontrakten tildeles på laveste pris uden forhandling.

    Competition with qualification
    Nov 27, 2026(0 days)
    DKK 4,000,000