Find

  • All tenders
All tenders: Denmark/Metroselskabet I/S/Copenhagen - New Metroline, M5 Civil Works South

Copenhagen - New Metroline, M5 Civil Works South

Published deadline passed

The published deadline has passed. For multi-stage competitions a later tender deadline may still apply — check the notice or portal for the current phase.

Qualification deadline
Oct 13Expired
Award
Quality, weight 50
Procedure
Competitive dialogueTwo stages
Agreement
Construction workover 9 years

Brief

Metroselskabet I/S needs civil works for the M5 Metroline South package in Copenhagen, Denmark, over a period of 9 years. This design & build contract, under ABT18 terms, involves the construction of approximately 6.5 km of twin bored TBM tunnels, 5 underground stations, 2 underground crossovers, 1 shaft, 5 cross passages, 1 ramp, approximately 2.0 km of viaduct, 1 elevated station, 1 viaduct cross-over, 1 elevated bifurcation, and short embankment sections. The M5 line is a fully automated driverless metro system designed to enhance passenger service and extend connectivity to emerging urban development areas. The contract will be awarded based on Price (50%) and Quality (50%), with Quality sub-criteria including Technical solution and planning (16%), Management and collaboration (16%), Organization and key personnel (10%), and Carbon (8%). To qualify, applicants must have completed one project demonstrating experience with design, construction, and project management of an underground metro project in the EEA and/or the UK, and one project demonstrating experience with design, construction, and project management of an above-ground metro project in the EEA and/or the UK, both within the last 15 years. Additionally, applicants must have an equity of no less than EUR 100,000,000.00 and a total annual turnover of at least EUR 1,700,000,000.00 in each of the last three completed financial years.

Railway and Infrastructure Construction

Register interest

Previous winners

  • Who are you up against?

    The suppliers who have won similar contracts at Metroselskabet I/S

Will you bid?

The agent sets up the bid and writes the first draft. Free for 14 days.

Qualification requirements

  • Description

    Søkeren må ha fullført ett (1) prosjekt som demonstrerer erfaring med design, konstruksjon og prosjektledelse av et underjordisk metroprosjekt i EØS og/eller Storbritannia innen de siste femten (15) årene før fristen for å sende inn forespørsler om deltakelse. 'Fullført' betyr at prosjektet er formelt overlevert og akseptert av oppdragsgiver. 'Design' betyr den endelige prosjektplanleggingen av detaljert design. 'Prosjektledelse' betyr den overordnede ledelsen og koordineringen av design- og byggeprosessen. 'Metroprosjekt' betyr et urbant jernbanebasert massetransportsystem, unntatt tung jernbane og konvensjonell intercity-jernbane. 'Underjordisk metroprosjekt' betyr en metro bygget primært under bakken (f.eks. tunneler).

    Documentation Requirement

    Søkeren må i del IV, seksjon C i ESPD, oppgi referanser for prosjekter som oppfyller minimumskravene. Referansene skal som et minimum inkludere informasjon om: navnet på oppdragsgiver (arbeidsgiver) og kontaktperson, inkludert telefonnummer og e-postadresse; en kort beskrivelse av prosjektet, inkludert søkerens rolle i prosjektet; kontraktsperioden, forstått som perioden fra kontraktsinngåelse (signering) til overlevering; kontraktsverdien i DKK eller EUR. Hvis søkeren fullførte prosjektet som referansen gjelder som en del av et konsortium og/eller er avhengig av støttende enheter, skal søkeren, med hensyn til sin rolle i prosjektet, oppgi dette med en tydelig indikasjon på hvilke oppgaver/funksjoner hver deltaker i konsortiet har utført (hvis noen).

    Source

    No source found in the documents. Check the requirement against the tender documents.

  • Description

    Søkeren må ha fullført ett (1) prosjekt som demonstrerer erfaring med design, konstruksjon og prosjektledelse av et metroprosjekt over bakken i EØS og/eller Storbritannia innen de siste femten (15) årene før fristen for å sende inn forespørsler om deltakelse. 'Fullført' betyr at prosjektet er formelt overlevert og akseptert av oppdragsgiver. 'Design' betyr den endelige prosjektplanleggingen av detaljert design. 'Prosjektledelse' betyr den overordnede ledelsen og koordineringen av design- og byggeprosessen. 'Metroprosjekt' betyr et urbant jernbanebasert massetransportsystem, unntatt tung jernbane og konvensjonell intercity-jernbane. 'Metroprosjekt over bakken' betyr en metro bygget primært over bakken (f.eks. viadukter og/eller broer).

    Documentation Requirement

    Søkeren må i del IV, seksjon C i ESPD, oppgi referanser for prosjekter som oppfyller minimumskravene. Referansene skal som et minimum inkludere informasjon om: navnet på oppdragsgiver (arbeidsgiver) og kontaktperson, inkludert telefonnummer og e-postadresse; en kort beskrivelse av prosjektet, inkludert søkerens rolle i prosjektet; kontraktsperioden, forstått som perioden fra kontraktsinngåelse (signering) til overlevering; kontraktsverdien i DKK eller EUR. Hvis søkeren fullførte prosjektet som referansen gjelder som en del av et konsortium og/eller er avhengig av støttende enheter, skal søkeren, med hensyn til sin rolle i prosjektet, oppgi dette med en tydelig indikasjon på hvilke oppgaver/funksjoner hver deltaker i konsortiet har utført (hvis noen).

    Source

    No source found in the documents. Check the requirement against the tender documents.

  • Description

    En egenkapital på ikke mindre enn EUR 100 000 000,00 (eks. mva.) kreves i det senest avsluttede regnskapsåret for hvilket en årsrapport er tilgjengelig ved fristen for å sende inn forespørsler om deltakelse.

    Documentation Requirement

    Som foreløpig dokumentasjon av søkerens oppfyllelse av minimumskravene for økonomisk og finansiell kapasitet, må søkeren oppgi informasjon om nøkkeltallene angitt ovenfor i del IV, seksjon B i ESPD. Med mindre informasjonen er offentlig tilgjengelig, må oppfyllelse av minimumskravene, på forespørsel fra Metroselskabet, endelig dokumenteres ved innsending av: (i) for søkere etablert i Danmark, en revidert årsrapport; (ii) for søkere etablert i en annen EU/EØS-medlemsstat, en årsrapport ledsaget av en tilsvarende revisjonserklæring fra landet der søkeren er etablert, eller tilsvarende dokumentasjon som angitt i eCertis; og (iii) for søkere etablert utenfor EU/EØS, sammenlignbar dokumentasjon. Hvis søkeren ennå ikke har fullført et regnskapsår for hvilket en årsrapport er tilgjengelig, kan søkeren dokumentere sin økonomiske og finansielle kapasitet med annen passende dokumentasjon. Informasjonen må sendes inn for søkeren selv eller – hvis søkeren er et konsortium og/eller er avhengig av støttende enheter – for alle deltakere i konsortiet og/eller søkeren og alle støttende enheter.

    Source

    No source found in the documents. Check the requirement against the tender documents.

  • Description

    En total årlig omsetning på minst EUR 1 700 000 000,00 (eks. mva.) kreves i hvert av de siste tre (3) avsluttede regnskapsårene for hvilket årsrapporter er tilgjengelige ved fristen for å sende inn forespørsler om deltakelse.

    Documentation Requirement

    Som foreløpig dokumentasjon av søkerens oppfyllelse av minimumskravene for økonomisk og finansiell kapasitet, må søkeren oppgi informasjon om nøkkeltallene angitt ovenfor i del IV, seksjon B i ESPD. Med mindre informasjonen er offentlig tilgjengelig, må oppfyllelse av minimumskravene, på forespørsel fra Metroselskabet, endelig dokumenteres ved innsending av: (i) for søkere etablert i Danmark, en revidert årsrapport; (ii) for søkere etablert i en annen EU/EØS-medlemsstat, en årsrapport ledsaget av en tilsvarende revisjonserklæring fra landet der søkeren er etablert, eller tilsvarende dokumentasjon som angitt i eCertis; og (iii) for søkere etablert utenfor EU/EØS, sammenlignbar dokumentasjon. Hvis søkeren ennå ikke har fullført et regnskapsår for hvilket en årsrapport er tilgjengelig, kan søkeren dokumentere sin økonomiske og finansielle kapasitet med annen passende dokumentasjon. Informasjonen må sendes inn for søkeren selv eller – hvis søkeren er et konsortium og/eller er avhengig av støttende enheter – for alle deltakere i konsortiet og/eller søkeren og alle støttende enheter.

    Source

    No source found in the documents. Check the requirement against the tender documents.

Award Criteria

  • Description

    Schedule of Prices

    Source

    No source found in the documents. Check the weight against the tender documents.

  • Description

    The sub-criterion Quality comprises of: Technical solution and planning, 16% Management and collaboration, 16% Organization and key personnel, 10% Carbon, 8%

    Sub-criteria

    • Technical solution and planningWeight 16

      Technical solution and planning

    • Management and collaborationWeight 16

      Management and collaboration

    • Organization and key personnelWeight 10

      Organization and key personnel

    • CarbonWeight 8

      Carbon

    Source

    No source found in the documents. Check the weight against the tender documents.

From the notice

  • This tender presents a substantial opportunity for prospective contractors to bid for the M5 Civil Works South (CWS) package, an important component of the Copenhagen metro system's expansion. This project is of significant strategic importance, as the M5 line is a fully automated driverless metro system that will not only enhance passenger service on existing metro corridors but also extend connectivity to emerging urban development areas, including Kløverparken, Refshaleøen, and Lynetteholm in the East Harbour. The M5 is designed to operate as an independent system, ensuring that its construction and subsequent operation do not disrupt the existing M1-M4 metro lines. MAIN COMPONENTS OF THE M5 CIVIL WORK The M5 south consists of approx 6.5 km twin bored TBM tunnels, 5 underground stations (incl. 3 transfer stations), 2 underground crossovers, 1 shaft, 5 cross passages, 1 ramp, approx 2.0 km viaduct, 1 elevated station, 1 viaduct cross-over, 1 elevated bifurcation, short embankment sections. For further details on scope ref. is made to M5-2.1-CMBS-SW and M5-2.2-CWS-SW PHASES: The current tender, Phase 1, encompasses the southern section of the line, from north-west of København H to north of v/Prags Boulevard, with an anticipated operational commencement in 2036. The broader vision includes phase 2 north of v/Prags Boulevard to Lynetteholm opening in 2045 and a potential future extension to form a ring line, signifying a long-term commitment to urban mobility. Phase 2 is not included in this tender. CONTRACT SPLIT OF M5: The M5 project as a whole consists of several contracts: • M5 Civil Works South (this contract) • M5 Transportation System South contract (tendered out as a separate contract in June 2026) • Operation and Maintenance contract (will be tendered out at a later stage) • Enabling Works contracts, e.g. relocation of utilities, relocation works at Kh etc. (enabling works will be tendered out in separate contracts) • Station and Shaft areas (will be tendered out at a later stage) • Canopy contracts (will be tendered out at a later stage). CONTRACT The contract is structured as a design & build contract under ABT18 terms, placing comprehensive responsibility for both design and execution upon the Contractor. This two-phase approach—design followed by execution—is a standard framework for complex infrastructure projects. A market dialogue has been carried out before issuing the tender. The purpose of the market dialogue was to ensure that the project is attractive to the market, and to ensure competitive and compliant final tenders to be used as basis for the award of contract. Metroselskabet I/S is grateful for the potential tenderers who took their time to participate in the dialogue and provided input. INDICATIVE TIMESCHEDULE FOR THE PROCUREMENT Publication of contract notice September 10th 2026. Publication of tender documentation September 11th 2026. Deadline for submission of application for prequalification October 13th 2026, ref. made to section 5.1.12. Dialogue phase November 2026-October 2027. Final tender November 2027. Award of contract December 2027. The time-schedule may be subject to change.Main features of the procedureThe dialogue is structured in the following 3 rounds: Dialogue Round 1: Project Discovery, Dialogue Round 22: Dialogue, Dialogue Round 3: Closing the dialogue. After the Employer concludes the dialogue, the Final tender phase commences. It is anticipated that three rounds of dialogue, ref. made to diagram above, will be conducted. A dialogue round may consist of several individual meetings with each Tenderer. The Employer may extend the dialogue rounds if deemed necessary. . The Employer will determine when the dialogue phase is concluded. The themes for the dialogue meetings may be further elaborated and amended during the course of the procedure. Between dialogue rounds, the Employer may issue fully or partially revised tender documents and/or revised dialogue themes. The Employer may also continuously adjust the requirements regarding the content of the material to be submitted by the Tenderers prior to each dialogue meeting. Written dialogue materials shall be prepared in English. Discussions during the dialogue meetings will be conducted in English. Following each dialogue meeting, the Employer will prepare minutes, which will be distributed to the relevant Tenderer. The minutes will not be published and will therefore only be provided to the Tenderer that participated in the meeting. However, if questions of a general nature are discussed during a dialogue meeting, the responses to such questions will be distributed to all Tenderers. In order to avoid unnecessary expenditure of resources by the Tenderers, the Employer will endeavor, through the dialogue meetings or the minutes, to inform a Tenderer if aspects of its proposed solutions or contractual terms fail to comply with the minimum requirements set out in the procurement documents. However, the absence of such notification may not be relied upon by a Tenderer as confirmation that no such non-compliance exists. During the dialogue aspects of the tender such as cost, risk, contractual terms and conditions, technical solutions, time schedule, management processes and carbon may be discussed. STRUCTURE FOR DIALOGUE the dialogue has been structured around 6 workstreams. Workstream 1: Contract term and conditions. Workstream 2: Technical Solution and Construction Methodology. Workstream 3: Management and Collaboration. Workstream 4: Risk. Workstream 5: Cost. Workstream 6: Carbon. Contractual Target and Methodology. MEETING STRUCTURE For dialogue round 1: Project Discovery the Employer have allocated dialogue meetings every second week from November 10th to November 30th 2026. For dialogue round 2: Dialogue. A specific day of the week is set a side per Tenderer, ref. is made to Meeting and Submission Schedule, doc. Id M5-0-CWS-ITT-ATT01. For dialogue round 3: Closing the dialogue, the Employer have scheduled 2 dialogue meetings for each Tenderer.. The schedule allows for breaks throughout the day to provide opportunity for the parties to confer internally. Sessions may run in parallel with up to 8 sessions during one day. The Employer may choose to have less and longer sessions in some workstreams. The overall purpose of the dialogue meetings is to obtain the Tenderer's assessments, comments and feedback in relation to the Employer's dialogue topics for the relevant dialogue meeting and for the Tenderer to obtain the necessary knowledge of the Project to be able to price and assess the risks of the Project. The dialogue meetings do not form any part of the tender evaluation, nor any of the material submitted during the dialogue process. The tenderers are not expected to submit ‘final’ solutions during meetings. Tenderers are encouraged to ensure that the participants attending the dialogue meetings include individuals with the necessary expertise in the relevant subject areas and who, where applicable, are expected to be involved in the execution of the project. All dialogue meetings will be held at Metroselskabet, Metrovej 5, 2300 Copenhagen S. Participation via TEAMS will be possible. For further details on the dialogue and the topics, which the Employer intends to discuss during the dialogue, reference is made to M5-0-CWS-ITT-ATT01

  • Contact

    Vibeke Jessenvij@m.dk
  • Type
    Competition · Prequalification
  • Location
    Byen København
  • Main code
    Construction work
    45000000
  • 45221000Construction work for bridges and tunnels, shafts and subways45234111City railway construction work45234116Track construction works45234120Urban railway works45234122Underground railway works45234125Underground railway station45234129Urban railway track construction works71311100Civil engineering support services71311230Railway engineering services

Similar active competitions

  • Metroselskabet I/S

    Market dialogue - Copenhagen - New Metroline M5 Civil Works

    Metroselskabet I/S is planning the procurement of civil works for the Copenhagen New Metroline M5 and encourages potential tenderers to register for a market dialogue to provide input. The market dialogue will run until the end of August, and information will be shared via the Byggeprojekt platform.

    Planning
  • Udviklingsselskabet By & Havn I/S

    Construction and Civil Engineering - Bridges and Tunnels

    Udbud af Bro 23 - anlæggelse af Bro 23 mellem Svanemølleholm og det kommende Skudehavnskvarter

    Udviklingsselskabet By & Havn I/S udbyder en hovedentreprise på anlæg af Bro 23 i København med en maksimal samlet kontraktværdi på 55 mio. DKK og en udførelsesperiode på 13 måneder. Projektet omfatter en betonvejbro og to stibroer i stål mellem Svanemølleholm og det kommende Skudehavnskvarter samt ramper, spuns, pæle, vederlag, underbygning og tilhørende arbejder. Konkurrencen gennemføres i to faser: op til fem ansøgere prækvalificeres til at afgive tilbud. Udvælgelsen vægter sammenlignelige referencer fra de seneste 10 år; der skal indsendes 1–5 referencer, og erfaring med broer og anlægsarbejder, jord- og funderingsarbejder, tilslutning til eksisterende konstruktioner samt tilsvarende logistiske og stedbundne forhold prioriteres. Tilbuddene vurderes på pris (60 %), projektorganisation inklusive nøglepersoner (20 %) og proces med fokus på tid, økonomi og samarbejde (20 %).

    Competition with qualification
    Dec 17, 2026(19 days)
    DKK 55,000,000
  • Vejdirektoratet

    Construction and Civil Engineering - Bridges and Tunnels

    0390.201 - Udbygning af Amagermotorvejen Vest Broer Nord

    Vejdirektoratet skal have udført vejarbejder på en ca. 1,7 km lang strækning af Amagermotorvejen i Københavns omegn, herunder udvidelse af vejen i den ene side, udvidelse af en jernbanebro og forlængelse af fire bygværker. Entreprisen varer 3 år og har en maksimal samlet værdi på 290 mio. danske kroner. Tildelingskriteriet er udelukkende pris. Tilbudsgiver skal dokumentere en nettoomsætning på mindst 580 mio. danske kroner i seneste regnskabsår samt med højst fem referencer opfylde krav om erfaring fra de seneste fem år med vejanlæg til mindst 100 mio. danske kroner, trafikafvikling på en motorvej eller motortrafikvej i drift, en ny eller udvidet in-situ-støbt bro og anlægsarbejde udført under hel eller delvis spærring af jernbane eller S-bane.

    Competition
    Jan 20, 2027(53 days)
    DKK 290,000,000