All tenders: Denmark/Udviklingsselskabet By & Havn I/S/CPH City & Port I/S' (Udviklingsselskabet By & Havn I/S') public procurement procedure concerning supply and installation of a 132/30 kV - 55 MVA - Power Transformer

CPH City & Port I/S' (Udviklingsselskabet By & Havn I/S') public procurement procedure concerning supply and installation of a 132/30 kV - 55 MVA - Power Transformer

Awarded

The competition has ended and a winner has been selected.

Deadline
Nov 4, 2025Expired
Award
Planning of Works, weight 30 and 1 more
Procedure
OpenSingle stage
Agreement
Buying goods
Estimated value
DKK 25Mover 32 months

Brief

CPH City & Port I/S (Udviklingsselskabet By & Havn I/S) har inngått en avtale med Elettromeccanica Tironi S.r.l om å levere og installere en 132/30 kV – 55 MVA – strømtransformator i København, for å koble CPH City and Ports nye landstrømsystem til det lokale nettet. Kontrakten har en varighet på 32 måneder og en verdi på 13 038 000 danske kroner. Prosjektet inkluderer design, levering og installasjon av transformatoren, samt designledelse og IKT-ledelse. Tre leverandører deltok i konkurransen.

Electrical equipment and lighting

Result

TED
  • Elettromeccanica Tironi S.r.l
    Winner
  • Number of tenders received
    3
  • Contract value
    DKK 13,038,000

Previous winners

  • Who are you up against?

    The suppliers who have won similar contracts at Udviklingsselskabet By & Havn I/S

Will you bid?

The agent sets up the bid and writes the first draft. Free for 14 days.

Qualification requirements

  • Description

    Leverandøren må ha en årlig omsetning på minst 40 000 000 DKK ekskl. MVA i hvert av de tre (3) siste fullførte og reviderte regnskapsårene.

    Documentation Requirement

    Leverandøren må dokumentere dette med årsregnskap for de tre (3) siste fullførte og reviderte regnskapsårene.

    Source

    No source found in the documents. Check the requirement against the tender documents.

  • Description

    Leverandøren må ha en egenkapital på minst 15 000 000 DKK i det sist fullførte og reviderte regnskapet.

    Documentation Requirement

    Leverandøren må dokumentere dette med årsregnskap for det sist fullførte og reviderte regnskapet.

    Source

    No source found in the documents. Check the requirement against the tender documents.

  • Description

    Leverandøren må fremlegge en liste over to (2) referanser som dokumenterer erfaring med design, produksjon, testing, levering og installasjon av primærspenningstransformatorer på minimum 132 kV.

    Documentation Requirement

    Referansene skal inneholde følgende informasjon: • Land hvor hver referanse ble levert • Kort beskrivelse av oppgavene utført av leverandøren, inkludert i) spenninger, ii) MVA-rating og iii) Type olje • Kundens navn og adresse • Leveringsår

    Source

    No source found in the documents. Check the requirement against the tender documents.

Award Criteria

  • Description

    As described in the Tender Conditions section 9.3.1.

    Source

    No source found in the documents. Check the weight against the tender documents.

  • Description

    As described in the Tender Conditions section 9.3.2.

    Source

    No source found in the documents. Check the weight against the tender documents.

  • Description

    As described in the Tender Conditions section 9.3.3.

    Source

    No source found in the documents. Check the weight against the tender documents.

From the notice

  • Supply and installation of a 132/30 kV – 55MVA – Power Transformer to connect CPH City and Port’s new shoreside power system to the local grid and thereby utilize the full capacity of the purchased shoreside power system. The project includes the design, supply, and installation of a 132/30 kV – 55 MVA – Power Transformer in accordance with the specifications provided by the customer. The Power Transformer will supply power from the local energy grid to the shore power system for cruise ships calling at both Oceankaj in Nordhavn and Langeliniekaj in Copenhagen Inner Harbour. The project includes finalizing of design into a complete execution project, including Design Management and ICT management in accordance with the requirements provided by the customer, and supply and install of all necessary parts of the finalization of a Power Transformer adhering to the functional requirements.Main features of the procedureThe Tender Procedure was implemented as an open procedure pursuant to Directive 2014/25/EU of the European Parliament and of the Council of 26 February 2014 (Utility Directive) as implemented by the Consolidation Act no. 1624 of 15 December 2015. The procurement procedure is carried out according to the Utility Directive. It follows from the Consolidation Act that several sections in the Danish Public Procurement Act (Act no. 10 of 6 January 2023) also apply to procurement procedures pursuant to the Utility Directive. When reference is made in the following to sections in the Danish Public Procurement Act, this is done in accordance with the Consolidation Act stated. The Contracting Authority will award the Contract on the terms and conditions set out in the draft Contract to the most economically advantageous tender based on the criteria ‘best price-quality ratio’.

  • Contact

    Cindy Thorhaugecth@bechbruun.com
  • Type
    Result
  • Location
    Byen København
  • Main code
    Electrical machinery, apparatus, equipment and consumables; lighting
    31000000
  • 31170000Transformers

Similar active competitions

  • HOFOR Fjernvarme P/S

    Electrical equipment and lighting

    SMC-6.2 Power Transformer and 132 kV Gas Insulated Switchgear

    HOFOR Fjernvarme P/S is procuring the design, manufacture, factory testing, delivery, site assembly, testing, commissioning and handover of power transformers and 132 kV SF₆-free gas-insulated switchgear for the Svanemøllen Energy Centre in Copenhagen. The procurement is divided into two lots: transformers, including cooling systems, accessories, documentation and training; and GIS, including local control cubicles, monitoring equipment, accessories, documentation and training. The maximum total contract value is EUR 10 million. The negotiated competition has prequalification followed by tendering and evaluation; up to four applicants per lot will be invited to tender, with negotiations expected. Lot 1 applicants must provide at least two completed references from the past five years for comparable or higher-rated power transformers, including factory acceptance testing and site commissioning support. Award criteria for each lot are price (45%), technical solution and project execution (15%), commercial and contractual terms (7.5%), and health and safety (5%).

    Competition with qualification
    Nov 27, 2026(0 days)
    €10,000,000
  • Electricity Authority of Cyprus

    Electrical equipment and lighting

    025/2026 Supply of Ground Mounted Distribution Transformers

    Electricity Authority of Cyprus needs Ground Mounted Distribution Transformers for a 4-year contract with a maximum total value of 28,260,500 EUR. The delivery location is Cyprus. The award criterion is the lowest price.

    Competition
    Dec 2, 2026(4 days)
    €28,260,500
  • Electricity Authority of Cyprus

    Electrical equipment and lighting

    568/2025 - Supply of Power, Auto and Earthing Transformers

    The Electricity Authority of Cyprus needs the supply of power, auto and earthing transformers across Cyprus under an 18-month contract with a maximum total value of €33.12 million. The contract covers transformer supplies and will be awarded on the basis of lowest price.

    Competition
    Dec 30, 2026(32 days)
    €33,120,000