Romania: Tenders/S.N. Aeroportul International Mihail Kogalniceanu - Constanta S.A./Dezvoltare terminal, turn de control si parcare la Aeroportul International Mihail Kogalniceanu Constanta

Dezvoltare terminal, turn de control si parcare la Aeroportul International Mihail Kogalniceanu Constanta

Published deadline passed

The published deadline has passed. For multi-stage competitions a later tender deadline may still apply — check the notice or portal for the current phase.

Deadline
Jun 4,Expired
Agreement
Construction work

Brief

S.N. Aeroportul Internațional Mihail Kogălniceanu - Constanța S.A. a modificat un contract cu SSAB-AG, Acer Proje İnșaăt A.Ș. și ATELIER UNBUILT S.R.L. pentru proiectarea și execuția lucrărilor de dezvoltare a terminalului, turnului de control și parcării la Aeroportul Internațional Mihail Kogălniceanu Constanța, cu o valoare finală a contractului de 260.231.895 RON.

Rådgivende ingeniørtjenester for bygg og anlegg

Result

TED
  • Acer Proje İnşaat A.Ş.
    Winner
  • SSAB-AG
    Winner
  • UNBUILT
    Winner
  • Number of tenders received
    0
  • Contract value
    RON 260,231,895

Previous winners

  • Who are you up against?

    The suppliers who have won similar contracts at S.N. Aeroportul International Mihail Kogalniceanu - Constanta S.A.

Will you bid?

The agent sets up the bid and writes the first draft. Free for 14 days.

From the notice

  • Proiectare si executie lucrari din cadrul obiectivului de investitii Dezvoltare terminal, turn de control si parcare la Aeroportul International Mihail Kogalniceanu Constanta. Descrierea lucrărilor și a serviciilor este disponibilă în Studiu de Fezabilitate si Caietul de sarcini din cadrul prezentei documentaţii de atribuire. Ofertantii vor putea solicita clarificari nu mai tarziu de 18 zile inainte de data stabilita pentru depunerea ofertelor. Autoritatea contractanta va raspunde numai solicitarilor de clarificari adresate de operatorii economici care au respectat termenul anterior precizat, astfel incat raspunsul la solicitarile de clarificari sa fie transmis de catre autoritatea contractanta in a 11 zi inainte de data limita de depunere a ofertelor.

  • Contact

    Gabriela Micadrian.teodorescu@mk-airport.ro
  • Type
    Result
  • Location
    Constanţa
  • Main code
    Construction work for airports
    45235100
  • 45262800Building extension work45300000Building installation work71220000Architectural design services71322000Engineering design services for the construction of civil engineering works71335000Engineering studies71356200Technical assistance services

Similar active competitions

  • Athens International Airport S.A.

    Design and Construction of the Main Terminal Building (MTB) South Pier Expansion, Satellite Terminal Building (STB) Western Extension and Aprons at Athens International Airport

    Athens International Airport S.A. needs a contractor for a 42-month design-and-build project at Athens International Airport “Eleftherios Venizelos” in Anatoliki Attiki. The works cover expansion of the Main Terminal Building’s South Pier and the Satellite Terminal Building’s western side, associated apron and airside works, and a permanent underground passenger, goods and waste link between the terminals. Deliverables include approximately 25,000 m² of new South Pier facilities, a 950 m² Satellite Terminal extension, reconfiguration within the existing terminal, additional aircraft stands, six new passenger boarding bridges and changes to an existing bridge, taxiway works, and realignment of a service road and replacement of a fixed-link bridge. The contractor is responsible for design, construction, testing, commissioning, supervision, operational readiness and handover, including the related building systems, utilities, interfaces, temporary works and logistics required to deliver the project safely within a live, operational airport.

    Competition
    Feb 26, 2027(95 days)
  • Avinor AS

    Anleggs- og infrastrukturbygging

    Forhåndskunngjøring Stavanger lufthavn K-193388 Anleggs- og asfaltentreprise 2027

    Avinor AS planlegger en anleggs- og asfaltentreprise ved Stavanger lufthavn i Rogaland. Arbeidene omfatter oppgradering av APRON 11 på cirka 8 100 m², utbedringer av TWY T, K og B 1–4 på cirka 137 500 m² samt flytting av TWY L4 og bygging av rundt 5 900 m² ny taksebane. Stangeland Maskin AS vant en tidligere asfalt- og anleggsentreprise ved Stavanger lufthavn, men det er ikke opplyst om selskapet har dagens kontrakt.

    Competition
    Nov 26, 2026(3 days)
  • Letiště Praha, a. s.

    Anleggs- og infrastrukturbygging

    PTK_Dostavba Terminálu 2

    Letiště Praha, a. s. plánuje zakázku na stavební práce související s dostavbou Terminálu 2, která zahrnuje výstavbu nové části a rekonstrukci stávajících prostor. Tento projekt je jednou z nejvýznamnějších stavebních investic v rámci modernizace Letiště Václava Havla Praha. Společnosti BAK stavební společnost, a.s. a Trigema Building a.s. mají dnes podobnou zakázku.

    Planning