Find

  • All tenders
Ireland: Tenders/Dublin City Council/Dublin City Council Single Party Framework Agreement for an Integrated Design Team for the Clontarf Flood Defence and Public Realm Project

Dublin City Council Single Party Framework Agreement for an Integrated Design Team for the Clontarf Flood Defence and Public Realm Project

Cancelled

The competition has been cancelled.

Award
Procedure
OpenSingle stage
Agreement
Framework agreement
Estimated value
€7.5Mover 7 years

Brief

Dublin City Council has cancelled the tender for a Single Party Framework Agreement for an Integrated Design Team for the Clontarf Flood Defence and Public Realm Project, which was intended to deliver planning, engineering, environmental, stakeholder engagement, and other specialist consultancy services for the Clontarf waterfront in Dublin. The project aimed to address flood risks, enhance public realm, improve active travel, and provide environmental benefits. The framework agreement had an estimated maximum total value of 7.5 million EUR and a duration of 7 years. The cancellation was due to an incorrect procedure being used at the time of publication, and a new tender has been published under the Restricted Procedure.

Byggeteknisk konsulentvirksomhet

Result

TED
  • Reason for cancellation
    Other
  • Number of tenders received
    1

Previous winners

  • Who are you up against?

    The suppliers who have won similar contracts at Dublin City Council

Will you bid?

The agent sets up the bid and writes the first draft. Free for 14 days.

Award Criteria

  • Description

    Wrong procedure published. Please be advised that CFT-8969388 has been cancelled due to the incorrect procedure being used at the time of publication. A new CFT-9181107 has been published under the Restricted Procedure.

    Source

    No source found in the documents. Check the weight against the tender documents.

From the notice

  • The Contracting Authority, Dublin City Council, intends to establish a Single Party Framework Agreement with a Integrated Design Team to deliver planning, engineering, environmental, stakeholder engagement and other specialist consultancy services for the Clontarf Flood Defence and Public Realm Project (CFDPRP). The Project is located along the Clontarf waterfront in Dublin and encompasses a highly sensitive coastal environment adjoining designated European sites, including Special Areas of Conservation (SAC) and Special Protection Areas (SPA). The Project has been initiated to address existing and future coastal and surface water flood risks while delivering a coordinated programme of public realm enhancement, active travel improvements and environmental benefits. The scheme shall be developed through an integrated design approach that balances flood resilience, climate adaptation, biodiversity, heritage, placemaking, sustainable mobility, environmental protection and stakeholder aspirations. The initial call-off contract under the Framework will require the successful Applicant to undertake all services necessary to develop the Project from commencement through option identification, scheme development, environmental assessment, statutory consent processes and detailed design. This shall include the preparation of all technical studies, surveys, modelling, assessments, reports, designs and application documentation required to secure the necessary approvals and to progress the Project to a stage suitable for procurement and construction. The Framework Agreement may subsequently be utilised by the Contracting Authority to procure additional related services, including procurement support, construction-stage services, post-consent services and other specialist consultancy services associated with the delivery of the Project. The successful Applicant shall be required to develop a fully integrated and coordinated scheme that delivers flood protection, surface water management, active travel and public realm objectives within a single coherent design solution that is environmentally sensitive, climate resilient and appropriate to the strategic importance of the Clontarf waterfront. For further information please refer to documentation available to download from www.etenders.gov.ie Resource ID 8969388 – Input when notice created . Please note that this project is subject to funding.

  • Contact

    peter.ivers@dublincity.ie
  • Type
    Result · Framework agreement
  • Location
    Dublin
  • Main code
    Civil engineering consultancy services
    71311000
  • 71000000Architectural, construction, engineering and inspection services71240000Architectural, engineering and planning services71250000Architectural, engineering and surveying services71300000Engineering services71313000Environmental engineering consultancy services71320000Engineering design services71322000Engineering design services for the construction of civil engineering works71353100Hydrographic surveying services71410000Urban planning services71420000Landscape architectural services90712000Environmental planning

Similar active competitions

  • Dublin City Council

    Arkitekttjenester

    Contract for Integrated Spatial Framework and Delivery Plan for the Dublin City Taskforce Area

    Dublin City Council seeks a multidisciplinary team to develop an Integrated Spatial Framework and Delivery Plan for Dublin’s City Centre Taskforce Area, with a focus on the North Inner City. The 12-month services contract has a maximum total value of €550,000 and will establish a long-term vision and coordinated roadmap for regeneration, place-making and public and private investment, including support for flagship developments such as the GPO complex. The work is intended to enhance the area’s economic, social, environmental and cultural vitality, with delivery to be managed through a dedicated Special Purpose Vehicle being established. Offers will be evaluated on methodology and approach (40%), proposed team and contract management (25%), cost (25%), sustainability and ESG (5%), and value-add, innovation and continuous service improvement (5%).

    Competition
    Dec 11, 2026(17 days)
    €550,000
  • Cork County Council

    Arkitekttjenester

    Single Service Provider, Engineering Led Multi-Disciplinary Design Team - Stages (iic - v) for Cobh Public Realm Regeneration Phase 1

    Cork County Council seeks an engineering-led multidisciplinary design team, acting as PSDP and Employer’s Representative, to complete the design, procurement and construction stages (Stages iic–v) of the Cobh Public Realm Regeneration Phase 1 project in South-West Ireland. The services contract runs for 52 months and has a maximum total value of €700,000.

    Competition
    Dec 11, 2026(17 days)
    €700,000
  • Dublin City Council

    Anleggs- og infrastrukturbygging

    DCC - Multi-Party Framework Agreement for carrying out Roadworks in a City and Suburban Environment for Contracts greater than €1.0m and less than €8.0m

    Dublin City Council needs roadworks, public realm improvement works, cycle track works, and other engineering works in a live city and sub-urban environment in Dublin, Ireland, through a multi-party framework agreement over 4 years, with a maximum total value of 150,000,000 EUR. The contracts under the framework will be for values greater than 1,000,000 EUR and less than 8,000,000 EUR.

    Framework agreement with qualification
    Nov 25, 2026(1 day)
    €150,000,000