    Early Contractor Involvement, extension of Cityringen to Nordhavn

    METROSELSKABET I/S

    Early Contractor Involvement, extension of Cityringen to Nordhavn

    1. Planning notice published

      Nov 28, 11:46 AMNovember 28, 2024 11:46 AM
    2. Questions deadline

      Jan 27, 11:00 AMJanuary 27, 2026 11:00 AM
    3. Tender submission deadline

      Feb 3, 11:00 AMFebruary 3, 2026 11:00 AM
    4. Contract start date

      Mar 2, 11:00 PMMarch 2, 2026 11:00 PM
    5. Tender validity period

      May 3, 10:00 AMMay 3, 2026 10:00 AM

    Brief

    Denmark: Tenders/METROSELSKABET I/S/Early Contractor Involvement, extension of Cityringen to Nordhavn

    Published deadline passed

    The published deadline has passed. For multi-stage competitions a later tender deadline may still apply — check the notice or portal for the current phase.

    Brief

    Nordhavn is currently Copenhagen’s fastest growing locality. The Nordhavn area is planned to grow to approximately 35.000 residents and 28.000 working places by 2050. Well-functioning public transportation is a crucial part of the growth of Nordhavn, and the M4 Cityringen metroline is therfore planned to be extended from the existing Orientkaj Station to outer Nordhavn with 2 new stations. The customers of the Copenhagen Metro expect a high level of service with functional and attractive infrastructure. The extension will be an integrated part of the existing M4 line called Cityringen Nordhavn Extension (CRNHE). The Nordhavn Extension shall be a fully elevated line of approximately 1,6 km with two stations; until further called v./Levantkaj and v./Nordhavn C. Metroselskabet have high ambitions for the extension to Nordhavn and to accommodate the need for lowered CO2-emissions see a need to rethink design processes and constructions. On that background Metroselskabet is aiming to sign a contract with a contractor who have a team of capable and experienced consultants, able to challenge our current understanding of the architecture of the stations and viaducts as well as methods of designing and constructing a metro. Metroselskabet is committed to delivering world-class sustainable transportation and aims to achieve this through the adoption of new ideas and innovative solutions. Metroselskabet have identified the following areas that will be of high priority during the CRNHE project: • Collaboration To accommodate the need for renewing the processes surrounding the project, Metroselskabet plans to work very closely with the contractor and the team to develop the project (see below). • Passengers The existing Copenhagen metro is a high-quality public transport service that provides robust and resilient operation in addition to a good, efficient and intuitive experience for all passengers. The extension is to provide the best possible passenger experience by making use of lessons from the existing metro in operation, which shall be an integrated part of the design process from the beginning. • Carbon footprint In terms of carbon footprint, Metroselskabet has an ambition to halve the carbon footprint from the construction phase of new Metro projects compared to the existing Metro at Orientkaj. The ambition shall be obtained mainly via design optimizations, new construction methods and material choices. • Emission free non-road machinery Metroselskabet has together with other partners defined and signed a declaration of intent, to integrate emission free non-road machinery on projects, please refer to this article describing the declaration of intent (in Danish): "Public construction clients sign declaration of intent". • Circular resource use Metroselskabet has a focus on applying the principles of circular economy in the way resources are being consumed. Metroselskabet will focus on reducing the consumption of natural resources and increase recirculation and recycling of materials and waste in constructing new Metro. • Metroselskabet is part of the City of Copenhagen’s partnership agreement for biodiversity together with 18 other landowners working to preserve and create new urban nature in the city. • Digital The goal of our digital ambition is to ensure that the project use digital solutions for innovation, sustainability, and to support efficient infrastructure solution that meets requirements for high quality, environmental considerations and advanced operations throughout the entire project lifecycle. Currently, Metroselskabet is finalizing documentation for the tender. The project will be tendered out as a design and build contract (ABT18) with an in-built close collaboration phase, where Metroselskabet together with the contractor and the contractor´s consultants will develop the design for the viaducts and the architecture of the stations. The tender documentation will have a very strong focus on the collaboration between the parties to achieve our ambitious goals for the project. Metroselskabet expects the contractor to bring consultants which are capable of executing the project but also consultants & architects to challenge the current perception of the architecture of the stations without compromising the passenger experience. Metroselskabet intends to use competitive dialogue as the procurement procedure as Metroselskabet intends to develop the final tender documentation with inputs from the tenderers. The tender is expected to be released early 2025. Metroselskabet would like to invite all interested parties to an information meeting on 2024.12.16 at 14:30-16:30 (local Danish time). The information meeting will be held at: Metroselskabet, Metrovej 5, 2300 Copenhagen S. Please, register for the meeting by emailing cafr@m.dk and let us know the number of participants. In order to ease the registration of the participants at the information meeting please indicate the names of the participants in your registration for the meeting. Due to the size of the venue for the meeting, Metroselskabet need to limit the number of participants per interested party to a maximum of 3. The information meeting is for physical attendees only. If you prefer a digital meeting, please let us know that as well. If there is sufficient interest for a digital meeting (via TEAMS) Metroselskabet will repeat the information meeting digitally.

    About the bid

      Nordhavn is currently Copenhagen’s fastest growing locality. The Nordhavn area is planned to grow to approximately 35.000 residents and 28.000 working places by 2050. Well-functioning public transportation is a crucial part of the growth of Nordhavn, and the M4 Cityringen metroline is therfore planned to be extended from the existing Orientkaj Station to outer Nordhavn with 2 new stations. The customers of the Copenhagen Metro expect a high level of service with functional and attractive infrastructure. The extension will be an integrated part of the existing M4 line called Cityringen Nordhavn Extension (CRNHE). The Nordhavn Extension shall be a fully elevated line of approximately 1,6 km with two stations; until further called v./Levantkaj and v./Nordhavn C. Metroselskabet have high ambitions for the extension to Nordhavn and to accommodate the need for lowered CO2-emissions see a need to rethink design processes and constructions. On that background Metroselskabet is aiming to sign a contract with a contractor who have a team of capable and experienced consultants, able to challenge our current understanding of the architecture of the stations and viaducts as well as methods of designing and constructing a metro. Metroselskabet is committed to delivering world-class sustainable transportation and aims to achieve this through the adoption of new ideas and innovative solutions. Metroselskabet have identified the following areas that will be of high priority during the CRNHE project: • Collaboration To accommodate the need for renewing the processes surrounding the project, Metroselskabet plans to work very closely with the contractor and the team to develop the project (see below). • Passengers The existing Copenhagen metro is a high-quality public transport service that provides robust and resilient operation in addition to a good, efficient and intuitive experience for all passengers. The extension is to provide the best possible passenger experience by making use of lessons from the existing metro in operation, which shall be an integrated part of the design process from the beginning. • Carbon footprint In terms of carbon footprint, Metroselskabet has an ambition to halve the carbon footprint from the construction phase of new Metro projects compared to the existing Metro at Orientkaj. The ambition shall be obtained mainly via design optimizations, new construction methods and material choices. • Emission free non-road machinery Metroselskabet has together with other partners defined and signed a declaration of intent, to integrate emission free non-road machinery on projects, please refer to this article describing the declaration of intent (in Danish): "Public construction clients sign declaration of intent". • Circular resource use Metroselskabet has a focus on applying the principles of circular economy in the way resources are being consumed. Metroselskabet will focus on reducing the consumption of natural resources and increase recirculation and recycling of materials and waste in constructing new Metro. • Metroselskabet is part of the City of Copenhagen’s partnership agreement for biodiversity together with 18 other landowners working to preserve and create new urban nature in the city. • Digital The goal of our digital ambition is to ensure that the project use digital solutions for innovation, sustainability, and to support efficient infrastructure solution that meets requirements for high quality, environmental considerations and advanced operations throughout the entire project lifecycle. Currently, Metroselskabet is finalizing documentation for the tender. The project will be tendered out as a design and build contract (ABT18) with an in-built close collaboration phase, where Metroselskabet together with the contractor and the contractor´s consultants will develop the design for the viaducts and the architecture of the stations. The tender documentation will have a very strong focus on the collaboration between the parties to achieve our ambitious goals for the project. Metroselskabet expects the contractor to bring consultants which are capable of executing the project but also consultants & architects to challenge the current perception of the architecture of the stations without compromising the passenger experience. Metroselskabet intends to use competitive dialogue as the procurement procedure as Metroselskabet intends to develop the final tender documentation with inputs from the tenderers. The tender is expected to be released early 2025. Metroselskabet would like to invite all interested parties to an information meeting on 2024.12.16 at 14:30-16:30 (local Danish time). The information meeting will be held at: Metroselskabet, Metrovej 5, 2300 Copenhagen S. Please, register for the meeting by emailing cafr@m.dk and let us know the number of participants. In order to ease the registration of the participants at the information meeting please indicate the names of the participants in your registration for the meeting. Due to the size of the venue for the meeting, Metroselskabet need to limit the number of participants per interested party to a maximum of 3. The information meeting is for physical attendees only. If you prefer a digital meeting, please let us know that as well. If there is sufficient interest for a digital meeting (via TEAMS) Metroselskabet will repeat the information meeting digitally.

      Contact name
      Camilla Frost Janns
      Contact phone
      72424573
      Contact email
      cafr@m.dk
      Address
      Metrovej 5, 2300 København S

    Custom Assessment Criteria

    Start a free trial to ask your own questions about the tender and get AI-generated answers.

    Award Criteria

      Found no award criteria in the contract notice.

    Qualification requirements

      Found no qualification requirements in the contract notice.

    Previous Contract Winners

    Start a free trial to see who has won similar tenders for this buyer.

    See the full notice

    Contracting authority
    METROSELSKABET I/S
    Title
    Early Contractor Involvement, extension of Cityringen to Nordhavn
    Type
    Planning
    Main code
    45000000Construction work
    Supplemental codes
    71000000Architectural, construction, engineering and inspection services
    Location
    Byen København

    Active similar competitions

    • METROSELSKABET I/S

      Bygg og anlegg - Bruer og tunneler

      Copenhagen - New Metroline M5 Civil Works South – Invitation to Information Meeting

      Metroselskabet I/S planlægger anskaffelsen af anlægsarbejder til den nye metrolinje M5 Syd i København. Interesserede leverandører inviteres til et digitalt informationsmøde via Microsoft Teams den 23. juni 2026 kl. 10:00-11:00 CET, hvor Metroselskabet vil præsentere udbudsprocessen, projektet og udbudsdokumentationen. Der er ingen krav om registrering for at deltage i mødet.

      PlanningJun 11, 2026
    • METROSELSKABET I/S

      Bygg og anlegg - Bruer og tunneler

      M5 – New Metro Line – Invitation to Information Meeting on Prequalification and Tender for Transportation Systems

      Metroselskabet I/S planlægger anskaffelsen af transportsystemer til den nye metrolinje M5 i København. Interesserede leverandører inviteres til et digitalt informationsmøde for at få præsenteret udbudsprocessen, herunder prækvalifikations- og udbudsfasen samt tidsplanen, og for at få et overblik over udbudsdokumentationen. Mødet afholdes via Microsoft Teams.

      PlanningJun 11, 2026
    • METROSELSKABET I/S

      Market dialogue - Copenhagen - New Metroline M5 Civil Works

      Metroselskabet I/S is planning the procurement of civil works for the Copenhagen New Metroline M5 and encourages potential tenderers to register for a market dialogue to provide input. The market dialogue will run until the end of August, and information will be shared via the Byggeprojekt platform.

      PlanningAug 13, 2026
    • Vejdirektoratet

      Byggeteknisk konsulentvirksomhet

      11120.R01 Totalrådgivning Udvidelse af Ring 4 Nord

      Vejdirektoratet søger totalrådgivning til udvidelsen af Ring 4 Nord, som omfatter anlæg af en ekstra vognbane i begge retninger på den ca. 5 km lange strækning mellem Ballerup Byvej og Hillerødmotorvejen, samt etablering af støjskærme, vejadgange, stiunderføringer og signalteknisk optimering. Kontrakten har en maksimal totalværdi på 60 millioner DKK og en varighed på 6 år, og dækker rådgivning i fase 3 (Projekt til besigtigelse), fase 4 (Projekt til anlæg) og fase 5 (Projektopfølgning). Tilbud evalueres på pris og projektorganisation og kompetencer. Der kræves en nettoomsætning på mindst 50 millioner DKK i seneste regnskabsår, samt erfaring inden for de seneste 3 år med detailprojektering af større vejanlæg i bynære områder, afvandingssystemer, støjskærme og tunneller i beton (inkl. statiske beregninger), geotekniske undersøgelser og projektering, naturrådgivning vedr. §3 erstatningsnatur og bilag 4 arter, vurderinger og myndighedsbehandling i henhold til vandrammedirektivets artikel 4 og indsatsbekendtgørelsens § 8, samt miljørådgivning vedr. forurenet jord og bygningsmaterialer.

      CompetitionSep 30, 2026
      Nov 5, 2026(25 days)
      DKK 60,000,000
    • Vejdirektoratet

      Bygg og anlegg - Bruer og tunneler

      9095.100 (Høring) - The Third Limfjord Link - Fjord Crossing (Hearing)

      Vejdirektoratet is planning the procurement of construction works for the Third Limfjord Link, which includes an immersed tunnel, cut-and-cover transition tunnel, tunnel ramp structure, land reclamation, and two parallel low-level bridges. Suppliers are invited to provide feedback on the draft minimum selection criteria to ensure they are market-compliant and well-balanced by sending their responses to Saleebaan Yusuf at samy@vd.dk, with inbd@vd.dk in copy.

      PlanningJun 29, 2026