Find

  • All tenders
Ireland: Tenders/Horse Racing Ireland (HRI)/Engineer Led Integrated Design Team Consultancy Services for the Proposed Reconfiguration and Upgrade of HRI HQ Building and Associated Outbuildings, Ballymany, The Curragh

Engineer Led Integrated Design Team Consultancy Services for the Proposed Reconfiguration and Upgrade of HRI HQ Building and Associated Outbuildings, Ballymany, The Curragh

Awarded

The competition has ended and a winner has been selected.

Award
Quality, weight 65
Procedure
OpenSingle stage
Agreement
Buying services
Estimated value
€300Kover 3 years

Brief

Horse Racing Ireland (HRI) has entered into an agreement with MPA Consulting Engineers for Engineer-Led Integrated Design Team Consultancy Services for the proposed reconfiguration and upgrade of the HRI HQ Building and associated outbuildings in Ballymany, The Curragh, Mid-East, for a duration of 3 years and a final contract value of 300,000 EUR. The services require a multi-disciplined, competent, and suitably experienced Architect-Led Design Team. The award was based on a 35% weighting for price and a 65% weighting for quality, which included opportunities for sustainable design innovation, proposed program, service delivery approach and methodology, technical merit and balance of human resources, and managing time and quality. Four bids were received.

Brann- og sikkerhetstjenester

Result

TED
  • MPA Consulting Engineers
    Winner
  • Number of tenders received
    4
  • Contract value
    €300,000

Previous winners

  • Who are you up against?

    The suppliers who have won similar contracts at Horse Racing Ireland (HRI)

Will you bid?

The agent sets up the bid and writes the first draft. Free for 14 days.

Award Criteria

  • Description

    Price Score

    Source

    No source found in the documents. Check the weight against the tender documents.

  • Description

    A – Opportunities for Sustainable Design Innovation (15%) B – Proposed Programme (15%) C – Service Delivery Approach and Methodology (15%) D – Technical merit and balance of the human resources committed to the project (10%) E – Managing Time & Quality (10%)

    Sub-criteria

    • Sustainable Design InnovationWeight 15

      Opportunities for Sustainable Design Innovation

    • Proposed ProgrammeWeight 15

      Proposed Programme

    • Service Delivery Approach and MethodologyWeight 15

      Service Delivery Approach and Methodology

    • Technical merit and balance of human resourcesWeight 10

      Technical merit and balance of the human resources committed to the project

    • Managing Time & QualityWeight 10

      Managing Time & Quality

    Source

    No source found in the documents. Check the weight against the tender documents.

From the notice

  • Horse Racing Ireland is seeking to establish a contract for Engineer-Led Integrated Design Team Services to progress a project to deliver a proposed Reconfiguration and Upgrade of HRI HQ Building and Associated Outbuildings. The successful integrated design team or single point design team (SPDT) will be composed of a multi-disciplined competent and suitably experienced Architect – Led Design Team to provide relevant consultancy services in respect of the project.

  • Contact

    procure@hri.ie
  • Type
    Result
  • Location
    Mid-East
  • Main code
    Health and safety consultancy services
    71317210
  • 71220000Architectural design services71250000Architectural, engineering and surveying services71311000Civil engineering consultancy services71320000Engineering design services71322000Engineering design services for the construction of civil engineering works71324000Quantity surveying services71334000Mechanical and electrical engineering services71530000Construction consultancy services71540000Construction management services

Similar active competitions

  • University College Cork

    Appointment of Integrated Design Team for Cork University Business School New Building

    University College Cork needs an architect-led integrated design team to provide consultancy services for the new Cork University Business School building on Perrott’s Avenue, in Ireland’s South-West region. The 60-month contract has a maximum total value of €2.5 million and covers architectural, civil and structural engineering, mechanical and electrical engineering, Project Supervisor Design Process, and energy-efficient design coordination; quantity surveying services will be procured separately. The competition uses a two-stage restricted procedure.

    Competition with qualification
    Dec 21, 2026(29 days)
    €2,500,000
  • Waterford City and County Council_103683

    Digital design og brukeropplevelse

    WCCC26 496 Integrated Design Team for the Development of 22 Lady Lane

    Waterford City and County Council needs an architect-led multidisciplinary design team for the redevelopment of 22 Lady Lane in Ireland’s South-East, over 3 years, with a maximum total contract value of €6 million. The team must include a Conservation Architect, civil, structural, mechanical and electrical engineers, quantity surveyors, and a building energy consultant.

    Competition
    Nov 23, 2026(1 day)
    €6,000,000
  • Cork County Council

    Arkitekttjenester

    Single Service Provider, Engineering Led Multi-Disciplinary Design Team - Stages (iic - v) for Cobh Public Realm Regeneration Phase 1

    Cork County Council seeks an engineering-led multidisciplinary design team, acting as PSDP and Employer’s Representative, to complete the design, procurement and construction stages (Stages iic–v) of the Cobh Public Realm Regeneration Phase 1 project in South-West Ireland. The services contract runs for 52 months and has a maximum total value of €700,000.

    Competition
    Dec 11, 2026(19 days)
    €700,000