ENQEIR966 - DS3 System Services – Volume Uncapped – Gate 13

Awarded

The competition has ended and a winner has been selected.

Procedure
OpenSingle stage
Agreement
Buying services
Estimated value
€140.5Mover 10 months

Brief

EirGrid plc has entered into an agreement with PowerHouse Generation Ireland Ltd, EnerNOC Ireland Ltd, Statkraft Ireland Ltd., Sundew Solar Designated Activity Company, Derrinlough Wind Farm, Electricity Exchange, Grange Backup Power Limited, and Shannonbridge Power (B) Limited for the provision of DS3 System Services. The services, covering 12 different lots, will be delivered in Dublin for a duration of 10 months, starting from October 1, 2025, with an option for extension. The total estimated value of the contract is 140.5 million EUR. 21 bids were received for this contract.

Elektrisitetshandel og vannkraftproduksjon

Result

TED
  • Derrinlough Wind Farm
    Winner
  • Electricity Exchange
    Winner
  • EnerNOC Ireland Ltd
    Winner
  • Grange Backup Power Limited
    Winner
  • PowerHouse Generation Ireland Ltd
    Winner
  • Number of tenders received
    21
  • Contract value
    €140,500,000

Previous winners

  • Who are you up against?

    The suppliers who have won similar contracts at Coimisiún na Meán

Will you bid?

The agent sets up the bid and writes the first draft. Free for 14 days.

From the notice

  • This Qualification System refers to the system that is in place to enable interested parties to submit a response and subsequently qualify for award of Contract for provision of DS3 System Services. Gate 13 covers all 12 services outlined in the Qualification System Briefing Document. The services are split into a number of Lots for the TSO. Lots 1IE – 12IE relate to the System Services required by EirGrid. It is intended that the start date of each of the Contracts awarded under Gate 13 is 1st October 2025. It is intended that the term of each Contract will last until 30th April 2026, as per the decision of the Regulatory Authority set out in SEM-23-103 System Services Future Arrangements - Decision Paper 3, but with an option for TSO to extend the term of its Contract in respect of any or all of its applicable Lots in certain defined cases, at the discretion of the Contracting Entity. This option might apply where, for instance, there is a delay in completing the procurement for any subsequent phases envisaged under the DS3 Programme.

  • Contact

    tenders@eirgrid.com
  • Type
    Result
  • Location
    Dublin
  • Main code
    Energy and related services
    71314000

Similar active competitions

  • Electricity Supply Board

    Elektrisitet og energiforvaltning

    Distribution Flexibility Services (Locational Summer Flexibility)

    Qualification system
    Feb 8, 2027(78 days)
  • ESB Networks DAC

    CON 1092 Demand Flexibility

    ESB Networks intends to procure Demand Flexibility Services for the national electricity distribution system in Ireland. Services will take the form of a contracted remunerated service for altering consumption or generation in response to a pre-agreed schedule with ESB Networks. These services will be scheduled for delivery or to be available for delivery to meet the ESB Networks requirements during pre-agreed Service Windows and will be utilised to manage network conditions.

    Qualification system
    Dec 27, 2027(100+ days)
  • Clare Tourism Development DAC

    Elektrisitetshandel og vannkraftproduksjon

    24/018 A Qualification System for the Provision of Energy Services to Uisce Éireann

    This qualification system is introduced to be able to run call for competitions for Energy Services (including but not limited to) service areas detailed below

    Qualification system
    Jun 21, 2027(100+ days)