Find

  • All tenders
Netherlands: Tenders/KIC Innoenergy SE/Environmental Impact Assessment Study Finland for company builder Volaghy

Environmental Impact Assessment Study Finland for company builder Volaghy

Expired

The competition has expired without a winner being announced.

Deadline
15. jan. 2025Expired
Procedure
OpenSingle stage
Agreement
Framework agreementuntil feb. 2026

Brief

The scope is related to managing the complete EIA (Environmental Impact Assessment) process on behalf of the company builder VolagHy. VolagHy will establish several production facilities for the production of synthetic aviation fuel (eSAF). The project location is situated somewhere in Finland. On high-level, the first VolagHy site will have the following characteristics: •Intake o 200 – 250 kton/y captured CO2 from flue gases o 220 – 250 MW of electrical energy o 300 – 400 kton/y of water •Intermediates o130 – 150 kton/y methanol (Alternative 1) • Products o 40 – 60 kton/y Kerosene (eSAF) o 1 – 4 kton/y Naphtha (eNaphtha) o 1 – 2 kton/y diesel • Other emissions o Flue gas from flare and fired heaters o Treated wastewater •Storage facilities (capacity: tbd) for: o CO2 o Raw MeOH o MeOH, grade AA o eSAF o Naphtha o Diesel •Land o 10 – 20 ha with T/Kem zoning approved in Finland Deliverables (for one site) 1. EIA planning and permitting schedule (First step) o A detailed time plan for the EIA process from start to approval, including an assessment of key risks and necessary process steps. o A time plan incorporating all the other necessary permits and their timing from application to approval 2.EIA Programme and report (Second step) o Alternatives ▪ 1. The plant is not built ▪ 2. Production capacity of 50 kton/y ▪3. Production capacity of 100 kton/y o The work shall include the compiling of the EIA programme and the EIA report for the project and its alternatives as regulated in the Finnish Act on the Environmental Impact Assessment Procedure 252/2017 and the Decree of the Government on the environmental impact assessment procedure 277/2017. o Other ▪ The EIA shall include the necessary piping needed to integrate process streams between the CO2 source and our site. This distance is foreseen to be 0 – 3 km. ▪The EIA shall include the integration work from our plant to the existing district heating network. The point of interface shall be 0 – 3 km from our site. Options The following options shall be provided within the tender: 1.The complete process and deliverables (1. and 2. In Deliverables above) for a second site with the same characteristics 2.A site-specific Natura assessment (One site) 3.Air quality modelling (One site) 4.Noise modelling (One site) 5.Questionnaire to key stakeholders (Drafting, analyzing and summarizing the survey) (One site) 6.Interviews with key stakeholders (One site)

Miljørådgivning og klimatiltak

Register interest

Previous winners

  • Who are you up against?

    The suppliers who have won similar contracts at KIC Innoenergy SE

Will you bid?

The agent sets up the bid and writes the first draft. Free for 14 days.

From the notice

  • The scope is related to managing the complete EIA (Environmental Impact Assessment) process on behalf of the company builder VolagHy. VolagHy will establish several production facilities for the production of synthetic aviation fuel (eSAF). The project location is situated somewhere in Finland. On high-level, the first VolagHy site will have the following characteristics: •Intake o 200 – 250 kton/y captured CO2 from flue gases o 220 – 250 MW of electrical energy o 300 – 400 kton/y of water •Intermediates o130 – 150 kton/y methanol (Alternative 1) • Products o 40 – 60 kton/y Kerosene (eSAF) o 1 – 4 kton/y Naphtha (eNaphtha) o 1 – 2 kton/y diesel • Other emissions o Flue gas from flare and fired heaters o Treated wastewater •Storage facilities (capacity: tbd) for: o CO2 o Raw MeOH o MeOH, grade AA o eSAF o Naphtha o Diesel •Land o 10 – 20 ha with T/Kem zoning approved in Finland Deliverables (for one site) 1. EIA planning and permitting schedule (First step) o A detailed time plan for the EIA process from start to approval, including an assessment of key risks and necessary process steps. o A time plan incorporating all the other necessary permits and their timing from application to approval 2.EIA Programme and report (Second step) o Alternatives ▪ 1. The plant is not built ▪ 2. Production capacity of 50 kton/y ▪3. Production capacity of 100 kton/y o The work shall include the compiling of the EIA programme and the EIA report for the project and its alternatives as regulated in the Finnish Act on the Environmental Impact Assessment Procedure 252/2017 and the Decree of the Government on the environmental impact assessment procedure 277/2017. o Other ▪ The EIA shall include the necessary piping needed to integrate process streams between the CO2 source and our site. This distance is foreseen to be 0 – 3 km. ▪The EIA shall include the integration work from our plant to the existing district heating network. The point of interface shall be 0 – 3 km from our site. Options The following options shall be provided within the tender: 1.The complete process and deliverables (1. and 2. In Deliverables above) for a second site with the same characteristics 2.A site-specific Natura assessment (One site) 3.Air quality modelling (One site) 4.Noise modelling (One site) 5.Questionnaire to key stakeholders (Drafting, analyzing and summarizing the survey) (One site) 6.Interviews with key stakeholders (One site)

  • Contact

    Innoenergychristof.breda@innoenergy.com
  • Type
    Competition · Framework agreement
  • Location
    Zuidoost-Noord-Brabant, Noordoost-Noord-Brabant
  • Main code
    Environmental Impact Assessment (EIA) services for construction
    71313440

Similar active competitions

  • Lounais-Suomen Jätehuolto Oy

    Miljø- og avfallskonsulent

    Topinojan jätekeskuksen YVA-menettely

    Lounais-Suomen Jätehuolto Oy tarvitsee palveluita Topinojan jätekeskuksen muutoshankkeen ympäristövaikutusten arviointimenettelyn (YVA) toteuttamiseen sekä hankkeeseen liittyvään yleissuunnitelmatasoiseen toimintojen sijoitteluun Varsinais-Suomessa. Sopimuksen kesto on 1 vuosi. Hankkeeseen sisältyy muun muassa vastaanotettavien ja käsiteltävien jätemäärien kasvattaminen, jätteiden käsittelytoimintojen muutokset, sako- ja umpikaivolietteiden vastaanoton ja esikäsittelyn aloittaminen, kohonneita haitta-ainepitoisuuksia sisältävien maa-ainesten vastaanotto, välivarastointi, esikäsittely ja hyödyntäminen sekä suljetun kaatopaikka-alueen tulevien käyttövaihtoehtojen tarkastelu. Tarjoukset arvioidaan hinnan (60%) ja laadun (40%) perusteella. Tarjoajalla tulee olla ammatinharjoittajan vastuuvakuutus, jonka vakuutussumma on vähintään 1 000 000 euroa.

    Competition
    25. nov. 2026(3 days)
  • Väylävirasto

    Miljørådgivning og klimatiltak

    Väylänpidon ympäristöasiantuntijapalvelut, puitesopimus 2027-2029 (2030)

    Väylävirasto tarvitsee väylänpidon ympäristöasiantuntijapalveluja 4 vuoden puitesopimukseen, joka kattaa vuodet 2027–2029 ja mahdollisen optiovuoden 2030. Työhön sisältyy ympäristöselvityksiä ja ympäristöohjeiden laatimista viraston ympäristötyön, myös lakisääteisten tehtävien, tukemiseksi ja kehittämiseksi. Puitejärjestelyyn valitaan kuusi toimittajaa, ja tarjoukset vertaillaan hinnan perusteella (100 %). Sitowise Oy, Ramboll Finland Oy, AFRY Finland Oy, WSP Finland Oy, Welado Oy ja Destia Oy ovat toimittaneet vastaavia palveluja Väylävirastolle aiemmassa puitesopimuksessa.

    Framework agreement
    18. des. 2026(26 days)
  • Senaatti-kiinteistöt

    and 1 other
    Byggeteknisk konsulentvirksomhet

    Vastuullisuuskonsultointi

    Senaatti-kiinteistöt hakee kiinteistö- ja rakennusalan vastuullisuustyötä tukevaa konsultointia puitesopimuksella konsernin toimijoille. Palvelun tulee kattaa vastuullisuustyön tukeminen, ja konsultilta edellytetään laajaa alan tuntemusta; sopimuksen kestoa ja arvoa ei ole ilmoitettu. Tarjoukset arvioidaan hinnan (40 %) sekä laadun (60 %), johon kuuluvat henkilöstön osaaminen ja referenssit, perusteella.

    Framework agreement
    7. des. 2026(15 days)