Find

  • All tenders
All tenders: Switzerland/erzo ARA (Hunziker Betatech)/erzo ARA, Klärschlammtrocknung Oftringen - Krananlage Bunker

erzo ARA, Klärschlammtrocknung Oftringen - Krananlage Bunker

Awarded

The competition has ended and a winner has been selected.

Deadline
May 22,Expired
Award
Procedure
OpenSingle stage
Agreement
Buying goods

Brief

erzo ARA has entered into an agreement with EN_Gersag Krantechnik AG for the delivery of a crane system for a new sewage sludge drying installation in Oftringen, Switzerland. The system, consisting of two redundant sludge-grab bridge cranes and a fully automated control system, is designed to handle 34,000 tonnes of sewage sludge per year, with the active crane achieving a conveying capacity of 32 m³/h from the reception bunker. The contract has a value of 1,163,405 CHF.

Result

TED
  • EN_Gersag Krantechnik AG
    Winner
  • Number of tenders received
    3
  • Contract value
    CHF 1,163,405

Previous winners

  • Who are you up against?

    The suppliers who have won similar contracts at erzo ARA (Hunziker Betatech)

Will you bid?

The agent sets up the bid and writes the first draft. Free for 14 days.

Award Criteria

  • Description

    Award criteria

    Source

    No source found in the documents. Check the weight against the tender documents.

From the notice

  • As part of the project “Replacement Facility for Sewage Sludge Treatment”, the existing sewage sludge incineration plant located on the premises of the waste‑to‑energy facility (KVA) will be replaced by a new drying installation. This installation is designed to dry 34,000 tonnes of sewage sludge per year, increasing the dry solids content from an average of 28.5% to approximately 90% TS. The sewage sludge consists of sludge produced at the ARA itself as well as sludge delivered from other wastewater treatment plants (ARAs) in Switzerland, with an average density of 1.2 t/m³. The installation consists of several components: a sludge reception hall, a logistics system with bunker, crane and conveying equipment, dryers with exhaust‑air treatment, and a dried‑sludge storage area including a loading station for onward transport. Dewatered sewage sludge is delivered by truck to the reception hall and tipped into the reception bunker. From there, it is transported by a crane system either into the storage bunker or directly into the sludge feed unit. From the sludge feed unit, the dewatered sludge is pumped via a pumping system into the feed chamber of the drying installation. The dryers dry the sewage sludge, and the exhaust air generated during the drying process is routed through an exhaust‑air cleaning system. The dried sewage sludge (referred to as dried product) is conveyed via hydraulic conveying systems into the dried‑sludge silos. Beneath the dried‑sludge silos is the loading station for removal of the dried product. The dried product is used as an alternative fuel in the cement industry. The crane system, consisting of two redundant sludge‑grab bridge cranes and their fully automated control system, is part of this tender. The power supply up to the interface located at the centre of the crane runway will be provided by the client. The active crane must achieve a conveying capacity of 32 m³/h from the reception bunker. The erzo ARA site already hosts a wastewater treatment plant (ARA) and a waste‑to‑energy plant (KVA). The KVA will be replaced by a new facility in the near future. The resulting logistics flows must be taken into account in the project.

  • Contact

    adrian.burkart@erzo.ch
  • Type
    Result
  • Location
    Aargau
  • Main code
    Travelling crane
    42414210

Similar active competitions

  • Abwasserverband Thurau

    Bygg og anlegg - Grunnarbeid, vann og kloakk

    ARA Thurau, Muldenverladestation inkl. Mulden und Führungsschienen

    Der Abwasserverband Thurau benötigt die verfahrenstechnische Auslegung, Fabrikation, Lieferung, Montage und Inbetriebnahme der schlammberührten Fördertechnik und mechanischen Ausrüstung für die Muldenverladestation der neuen ARA Thurau, Etappe West, am Standort der bestehenden ARA Uzwil in Niederuzwil, Kanton St. Gallen. Der Auftrag umfasst die Haupt- und Verteilförderschnecken, pneumatische Absperrorgane, Abdeckhauben mit integrierter Durchzugslüftung, pneumatisch betriebene Kippvorrichtungen für Mulden sowie Bodenführungsschienen; eingeschlossen sind Korrosionsschutz sowie Trocken- und Nassabnahme aller Komponenten.

    Competition
    Jan 29, 2027(64 days)
  • Abwasserverband Thurau

    Bygg og anlegg - Grunnarbeid, vann og kloakk

    ARA Thurau, Ausrüstung Gasproduktion

    Der Abwasserverband Thurau benötigt die Lieferung von drei zentralen Rührwerken für die Faulräume und den Schlammstapel der neuen ARA Thurau. Zum Auftrag gehören außerdem Gashauben, Schikanen, Schaumfallen sowie Rohrleitungen und Armaturen für die Etappe West. Die neue Kläranlage entsteht am Standort der bestehenden ARA Uzwil in Niederuzwil im Kanton St. Gallen und ist auf 130.000 Einwohner ausgelegt.

    Competition
    Jan 29, 2027(64 days)
  • Abwasserverband Thurau

    Anleggs- og infrastrukturbygging

    ARA Thurau, Ausrüstung Biologie

    Der Abwasserverband Thurau benötigt die Planung, Lieferung, Montage und Inbetriebnahme der Ausrüstung für sechs SBR-Reaktoren in zwei Bauetappen der neuen Abwasserreinigungsanlage Thurau in Niederuzwil, Kanton St. Gallen. Die neue Anlage ist für 130.000 Einwohner ausgelegt und umfasst gesetzlich vorgeschrieben eine vierte Reinigungsstufe zur Entfernung von Mikroverunreinigungen.

    Competition
    Jan 29, 2027(64 days)