EST Constr - Sligo University Hospital, Sligo, HSE NW - Medical Beds Development
Expired
The competition has expired without a winner being announced.
- Deadline
- Dec 20, 2024Expired
- Procedure
- OpenSingle stage
Brief
The proposed site is near the Out-Patient Department entrance of the hospital on the East side and is accessible from the main circulation concourse of the hospital at all levels. The proposed design creates two 21 bed wards on the first two storeys at Level 3 and Level 4. The beds spaces are all provided in single rooms with two isolation rooms per floor as per Strategy for the control of Antimicrobial Resistance in Ireland (SARI) guidelines with all necessary ancillary accommodation self-contained on each level. The upper storeys at Level 5 and 6 keep the established building line to create a design that will integrate with the surrounding environs. The accommodation requirements for Levels 5 and 6 have yet to be fully established and these areas shall be shell and core only. A new covered ramped approach to the Level 3 entrance and improved public access as well as site works and roads infrastructure are also included. The Undercroft at level 2 shall accommodate parking visitors and Ambulance and provide accommodation for staff and plant. The floor area at each level can be summarised as follow: Level 2 = 524.91m2 Level 3= 1172.15m2 Level 4= 1209.75m2 Level 5= 620.97m2 Level 6= 527.74m2 Level 7= 190.89m2 Total floor area= 4246.41m2 The Works will be completed in Multiple Phases with Sectional handovers.
Building and construction - Healthcare, courthouses, and dams
Previous winners
Who are you up against?
The suppliers who have won similar contracts at Health Service Executive (HSE)
Will you bid?
The agent sets up the bid and writes the first draft. Free for 14 days.
From the notice
The proposed site is near the Out-Patient Department entrance of the hospital on the East side and is accessible from the main circulation concourse of the hospital at all levels. The proposed design creates two 21 bed wards on the first two storeys at Level 3 and Level 4. The beds spaces are all provided in single rooms with two isolation rooms per floor as per Strategy for the control of Antimicrobial Resistance in Ireland (SARI) guidelines with all necessary ancillary accommodation self-contained on each level. The upper storeys at Level 5 and 6 keep the established building line to create a design that will integrate with the surrounding environs. The accommodation requirements for Levels 5 and 6 have yet to be fully established and these areas shall be shell and core only. A new covered ramped approach to the Level 3 entrance and improved public access as well as site works and roads infrastructure are also included. The Undercroft at level 2 shall accommodate parking visitors and Ambulance and provide accommodation for staff and plant. The floor area at each level can be summarised as follow: Level 2 = 524.91m2 Level 3= 1172.15m2 Level 4= 1209.75m2 Level 5= 620.97m2 Level 6= 527.74m2 Level 7= 190.89m2 Total floor area= 4246.41m2 The Works will be completed in Multiple Phases with Sectional handovers.
Contact
procurement.helpdesk@hse.ie- CompetitionType
- BorderLocation
- 45000000Main codeConstruction work
- 45215100Construction work for buildings relating to health