    EST_MW_UHL Block G – 72 Inpatient Bed Ward Expansion at University Hospital Limerick

    Health Service Executive (HSE)

    EST_MW_UHL Block G – 72 Inpatient Bed Ward Expansion at University Hospital Limerick

    1. Competition notice published

      Aug 6, 11:38 AMAugust 6, 2026 11:38 AM
    2. Questions deadline

      Aug 28, 1:00 PMAugust 28, 2026 1:00 PM
    3. Qualification deadline

      Sep 11, 1:00 PMSeptember 11, 2026 1:00 PM

    Brief

    Ireland: Tenders/Health Service Executive (HSE)/EST_MW_UHL Block G – 72 Inpatient Bed Ward Expansion at University Hospital Limerick

    Published deadline passed

    The published deadline has passed. For multi-stage competitions a later tender deadline may still apply — check the notice or portal for the current phase.

    Brief

    Bygg og anlegg - Helsevesen, tinghus og demning

    Health Service Executive (HSE) needs construction works for the vertical expansion of an existing 24-bed ward (Block G) building at University Hospital Limerick, providing 72 additional beds across three new ward levels, staff and ancillary accommodation, a plant room, and additional vertical circulation, with an overall floor area of approximately 6,617 m2. The project has a maximum total value of 91,288,760 EUR and a duration of 24 months. The works will take place within an operational campus adjacent to live 24/7 clinical departments.

    About the bid

      The project comprises the vertical expansion of an existing 24-bed ward (Block G) building, which was constructed under emergency legislation during the COVID-19 pandemic and is located on the University Hospital Limerick campus, which is an acute hospital. The vertical expansion will provide 72 additional beds across three new ward levels, together with staff and ancillary accommodation, plant room at the fourth floor and part of the fifth floor, and additional vertical circulation, including 2 new stair cores and lifts with an overall floor area of circa 6,617 m2 inclusive of the plantroom area and all ancillary site development above and below ground. The works will take place within an operational campus adjacent to live 24/7 clinical departments.

      Contact name
      John Flannery
      Contact phone
      0876021558
      Contact email
      john.flannery@hse.ie
      Address
      Oak House, Millennium Park Naas Co. Kildare, RE Kildare

    Custom Assessment Criteria

    Start a free trial to ask your own questions about the tender and get AI-generated answers.

    Award Criteria

      Found no award criteria in the contract notice.

    Qualification requirements

      Found no qualification requirements in the contract notice.

    Previous Contract Winners

    Start a free trial to see who has won similar tenders for this buyer.

    See the full notice

    Contracting authority
    Health Service Executive (HSE)
    Title
    EST_MW_UHL Block G – 72 Inpatient Bed Ward Expansion at University Hospital Limerick
    Type
    CompetitionPrequalification
    Main code
    45215100Construction work for buildings relating to health
    Supplemental codes
    45210000Building construction work45215130Clinic construction work45215140Hospital facilities construction work45310000Electrical installation work45350000Mechanical installations
    Estimated value
    €91,288,760.00
    Duration
    24 months

    Active similar competitions

    • Health Service Executive (HSE)

      Bygg og anlegg - Oppføring, renovering og vedlikehold av bygninger

      EST_MW - Maternity Emergency and Early Pregnancy Assessment Unit - University Maternity Hospital Limerick

      Health Service Executive (HSE) needs construction services for a new rapid build facility with a gross internal floor area of approximately 863m2, plus a rooftop plantroom area of approximately 150m2, and the refurbishment of the existing Main Entrance and Medical Emergency Unit (area approximately 263m2) at the University Maternity Hospital Limerick. The project, with a maximum total value of 12,000,000 EUR, will last for 18 months and includes a new main entrance draught lobby, entrance canopy, upgraded main entrance forecourt, associated landscape works, and a new car park.

      Competition with qualificationSep 28, 2026
      Oct 16, 2026(7 days)
      €12,000,000
    • Health Service Executive (HSE)

      Rådgivende ingeniørtjenester for bygg og anlegg

      Mini-Competition for M and E Services for the Decentralization of the Campus Central Heating System at University Hospital Galway.

      Health Service Executive (HSE) needs Building Services (M and E) Consultant services for the decentralization of the Campus Central Heating System at University Hospital Galway, located in the West region of Ireland. The contract has a duration of 42 months and a maximum total value of 160,000 EUR. J.V. Tierney and Co (2002) Ltd likely has a similar contract today.

      Competition with qualificationOct 5, 2026
      Nov 2, 2026(24 days)
      €160,000
    • Health Service Executive (HSE)

      Rådgivende ingeniørtjenester for bygg og anlegg

      Mini-Competition for Civil/Structural Engineering for the Decentralization of the Campus Central Heating System at University Hospital Galway

      Health Service Executive (HSE) needs civil/structural engineering consulting services for the decentralization of the Campus Central Heating System at University Hospital Galway, with a maximum total value of 160,000 EUR over 42 months. The services are to be delivered in the West region of Ireland. This is a mini-competition tendered from an existing framework.

      Competition with qualificationOct 5, 2026
      Nov 2, 2026(24 days)
      €160,000
    • Health Service Executive (HSE)

      Byggeteknisk konsulentvirksomhet

      HSE ESTATES SW - Ballyseedy Refurbishment and New Build Disability Respite Housing

      Health Service Executive (HSE) needs Architect Lead Integrated Design Team services for the Ballyseedy Refurbishment and New Build Disability Respite Housing project in the South-West region of Ireland. The contract duration is 3 years.

      CompetitionSep 25, 2026
      Oct 23, 2026(14 days)
      €0
    • CHU DUPUYTREN LIMOGES

      Rørlegger- og sanitærarbeid

      EXTENSION DU BATIMENT ADRIEN DANY 2 (Relance de la consultation) DU CENTRE HOSPITALIER ESQUIROL A LIMOGES

      Le CHU de Limoges, en tant qu'établissement support du GHT du Limousin, a besoin de travaux pour l'extension du bâtiment Adrien Dany du Centre Hospitalier Esquirol à Limoges, en Haute-Vienne. Le contrat a une durée de 20 mois et une valeur maximale totale de 6,86 millions d'euros. Les ouvrages et leurs composants techniques sont détaillés dans le Cahier des Clauses Techniques Particulières et les documents techniques du dossier de consultation.

      CompetitionAug 4, 2026
      Oct 16, 2026(7 days)
      €6,860,000