EWS-Upgrade of Existing Gas Proving Systems and replacement of Oil-Fired Boilers in Coláiste Eoin, Hacketsown, Co Carlow
Awarded
The competition has ended and a winner has been selected.
- Award
- Procedure
- OpenSingle stage
Brief
Kilkenny and Carlow ETB has entered into an agreement with Murphy and Kelly (Thomastown) Ltd. for emergency works involving the replacement of existing gas proving systems in science, home economics, and engineering rooms, replacement of flexible gas hoses, and the replacement of two oil-fired boilers with new LPG gas boilers and heating controls, and the current oil tank with a gas tank, in Coláiste Eoin, Hacketsown, Co Carlow. The contract has a duration of 12 months and a final value of 272,252 EUR.
Mechanical installations
Result
- Murphy and Kelly (Thomastown) Ltd.Winner
- 3Number of tenders received
- €272,252Contract value
Previous winners
Who are you up against?
The suppliers who have won similar contracts at Kilkenny and Carlow ETB
Will you bid?
The agent sets up the bid and writes the first draft. Free for 14 days.
Award Criteria
Description
Cost at 100%
Source
No source found in the documents. Check the weight against the tender documents.
From the notice
The emergency works project involves replacing the existing gas proving systems in two science rooms, a home economics room, an engineering and prep room, as well as replacement of flexible gas hoses in the engineering room. The emergency also includes replacement of the 2 existing oil-fired boilers with new LPG gas boilers and heating controls, and replacing current oil tank with a gas tank.
Contact
tdelaney@kcetb.ie- ResultType
- South-EastLocation
- 45350000Main codeMechanical installations
- 42160000Boiler installations44621200Boilers45331110Boiler installation work45351000Mechanical engineering installation works51100000Installation services of electrical and mechanical equipment51120000Installation services of mechanical equipment