Find

  • All tenders
Switzerland: Tenders/Stadt Illnau-Effretikon, Abteilung Hochbau/Extension of the Eselriet School Complex, BKP 221.1 – Timber/Metal Windows

Extension of the Eselriet School Complex, BKP 221.1 – Timber/Metal Windows

Awarded

The competition has ended and a winner has been selected.

Deadline
Mar 30,Expired
Award
Procedure
OpenSingle stage
Agreement
Construction workuntil Dec 2027

Brief

Stadt Illnau-Effretikon, Abteilung Hochbau has entered into an agreement with EN_4B AG for the delivery of timber/metal windows for the extension of the Eselriet School Complex in Effretikon, Switzerland, with a final contract value of 405,270 CHF. Six bids were received for this contract.

Bygg og anlegg - Oppføring, renovering og vedlikehold av bygninger

Result

TED
  • EN_4B AG
    Winner
  • Number of tenders received
    6
  • Contract value
    CHF 405,270

Previous winners

  • Who are you up against?

    The suppliers who have won similar contracts at Stadt Illnau-Effretikon, Abteilung Hochbau

Will you bid?

The agent sets up the bid and writes the first draft. Free for 14 days.

Award Criteria

  • Description

    Award criteria

    Source

    No source found in the documents. Check the weight against the tender documents.

From the notice

  • The Eselriet school complex is located on the south-western edge of the settlement of Effretikon, at the transition to the surrounding landscape with adjacent forested slopes and agricultural areas. The building ensemble dating from 1974 features a consistent architectural language typical of its time. Oriented diagonally to the south, the complex integrates clearly into the natural surroundings through its precise building footprint. Functionally differentiated building wings are arranged around a central playground, forming a coherent overall structure. The construction project provides for the structural extension of the school complex with a compact new building directly attached to the existing sports hall. The existing building and the extension are combined to form a coherent overall facility. From Sportplatzstrasse, a wide and clearly arranged access area is created. The new building accommodates the extensive spatial program, including facilities for school use, daytime childcare, and sports clubs, all under one roof. The access and vertical circulation concept allows both shared use and independent operation of the different user groups. Two building entrances open up the structure and clearly separate the various functions. A main staircase with lift provides access to all floors and connects the different parts of the building. The second and third upper floors follow a uniform floor plan concept. On the second floor, four classrooms with adjoining group rooms form a learning cluster around a central common and cloakroom area. The third floor accommodates therapy and speech therapy rooms as well as the facilities of the support centre. The basement level houses the multipurpose room with direct access to the sports hall. A staircase and lift connect this area with the kitchen and the common areas on the ground floor.

  • Contact

    hochbau@ilef.ch
  • Type
    Result
  • Location
    Zürich
  • Main code
    Building construction work
    45210000

Similar active competitions

  • Stadt Schlieren, Bereich Liegenschaften

    Bygg og anlegg - Oppføring, renovering og vedlikehold av bygninger

    Schulanlage Zelgli, Neubau, BKP 214 Montagebau in Holz

    Die Stadt Schlieren, Bereich Liegenschaften, benötigt Planungs- und Bauleistungen für den Montagebau in Holz beim Neubau der Schulanlage Zelgli im Kanton Zürich. Das Projekt erweitert die Schulräume und Tagesstrukturen und umfasst die dafür erforderlichen Arbeiten nach den Vorgaben des Auftraggebers; der Neubau wird nach den Standards Minergie A-Eco und SNBS Gold realisiert.

    Competition
    Dec 14, 2026(20 days)
  • Stadt Schlieren, Bereich Liegenschaften

    Glassmestertjenester

    Schulhaus Kalktarren, Sanierung Schulanlage: BKP 221.1 Holz Metall Fenster

    Die Stadt Schlieren, Bereich Liegenschaften, benötigt im Rahmen der Sanierung der Schulanlage Kalktarren Holz-Metall-Fenster einschließlich deren Montage. Es handelt sich um einen Bauauftrag am Standort Zürich.

    Competition
    Dec 17, 2026(23 days)
  • Stadt Schlieren, Bereich Liegenschaften

    Bygg og anlegg - Oppføring, renovering og vedlikehold av bygninger

    Schulhaus Kalktarren, Sanierung Schulanlage: BKP 221.2 Metall Fenster Türen

    Die Stadt Schlieren, Bereich Liegenschaften, benötigt im Rahmen der Sanierung der Schulanlage Schulhaus Kalktarren Metallfenster und -türen einschließlich ihrer Montage. Die Bauarbeiten werden in Zürich ausgeführt; Angaben zu Vertragsdauer, Auftragswert und Gewichtung der Zuschlagskriterien sind nicht ausgewiesen.

    Competition
    Dec 17, 2026(23 days)