Find

  • All tenders
Ireland: Tenders/Údarás Na Gaeltachta_289/External Paving Works at Novelplast, Baile Ghib, Co. Na Mí, C15 Pf64 for Údarás na Gaeltachta

External Paving Works at Novelplast, Baile Ghib, Co. Na Mí, C15 Pf64 for Údarás na Gaeltachta

Cancelled

The competition has been cancelled.

Deadline
Jul 2,Expired
Award
Procedure
OpenSingle stage
Agreement
Construction work
Estimated value
€120Kover 1 year

Brief

Údarás Na Gaeltachta_289 has cancelled the competition for external paving and drainage works at Novelplast, Baile Ghib, Co. Na Mí, C15 Pf64, due to lack of funding. The contract was for works with an estimated maximum total value of 120,000 EUR and a duration of 12 months. One bid was received.

Veibygging og asfaltarbeid

Result

TED
  • Reason for cancellation
    Decision of the buyer because of insufficient funds
  • Number of tenders received
    1

Previous winners

  • Who are you up against?

    The suppliers who have won similar contracts at Údarás Na Gaeltachta_289

Will you bid?

The agent sets up the bid and writes the first draft. Free for 14 days.

Award Criteria

  • Description

    quality

    Source

    No source found in the documents. Check the weight against the tender documents.

From the notice

  • PROPOSED EXTERNAL PAVING AND DRAINAGE WORKS AT NOVELPLAST, BAILE GHIB, CO. NA MÍ, C15 PF64 FOR ÚDARÁS NA GAELTACHTA, NA FORBACHA, CO. NA GAILLIMHE

  • Contact

    ruairi@udaras.ie
  • Type
    Result
  • Location
    Mid-West
  • Main code
    Paving and asphalting works
    45233222
  • 45111200Site preparation and clearance work45111230Ground-stabilisation work45200000Works for complete or part construction and civil engineering work45232451Drainage and surface works45232452Drainage works45233120Road construction works45233221Road-surface painting work

Similar active competitions

  • Údarás Na Gaeltachta_289

    Anleggs- og infrastrukturbygging

    Bealach Seanadh Mhach- Phase 2

    Údarás na Gaeltachta needs construction works for Phase 2 of the Bealach Seanadh Mhach Trails Project in Ireland’s Mid-West, with a maximum total contract value of €450,000 and a duration of 1 year. The project comprises approximately 325 metres of recycled-plastic boardwalk, 140 metres of geogrid walkway and three bridge crossings, together with associated civil engineering, structural and ancillary works.

    Competition
    Dec 9, 2026(16 days)
    €450,000
  • Údarás Na Gaeltachta_289

    Erris Looped Walks, Corclough Village, Mullet Peninsula, Co. Mayo

    Údarás na Gaeltachta needs construction and upgrading works for walking trails at Corclough Village and the existing Erris Head Loop on the Mullet Peninsula in County Mayo, Ireland, over 18 months, with a maximum total contract value of €450,000. The works include new and improved paths, an extension to the existing boardwalk, an accessible eco-friendly public toilet, trail signage and waymarking, fencing, drainage and associated infrastructure. The procurement is an open procedure for suitably qualified and experienced contractors.

    Competition
    Jan 4, 2027(42 days)
    €450,000
  • Údarás Na Gaeltachta_289

    Bygg og anlegg - Grunnarbeid, vann og kloakk

    P20787 Civil and Associated Works Qualification System

    daa plc needs civil and associated works.

    Qualification system
    Jun 23, 2029(100+ days)