Spain: Tenders/The European Joint Undertaking for ITER and the Development of Fusion Energy ('Fusion for Energy')/Final Design of the Monorail Crane System (MCS) for the Neutral Beam Remote Handling System

Final Design of the Monorail Crane System (MCS) for the Neutral Beam Remote Handling System

Published deadline passed

The published deadline has passed. For multi-stage competitions a later tender deadline may still apply — check the notice or portal for the current phase.

Deadline
Dec 15, 2025Expired
Agreement
Buying servicesover 26 months

Brief

La Empresa Común Europea para ITER y el Desarrollo de la Energía de Fusión ("Fusion for Energy") ha modificado un contrato con REEL S.A.S. para la entrega de servicios de diseño final del Sistema de Grúa Monorraíl (MCS) para el Sistema de Manipulación Remota de Haces Neutros. El contrato tiene una duración de 26 meses y un valor final de 7.283.441 €.

Prosjekteringstjenester

Result

TED
  • REEL S.A.S.
    Winner
  • Number of tenders received
    0
  • Contract value
    €7,283,441

Previous winners

  • Who are you up against?

    The suppliers who have won similar contracts at The European Joint Undertaking for ITER and the Development of Fusion Energy ('Fusion for Energy')

Will you bid?

The agent sets up the bid and writes the first draft. Free for 14 days.

From the notice

  • Final Design of the Monorail Crane System (MCS) for the Neutral Beam Remote Handling System

  • Contact

    niels.vandeven@f4e.europa.eu
  • Type
    Result
  • Location
    Rhône
  • Main code
    Engineering design services
    71320000

Similar active competitions

  • The European Joint Undertaking for ITER and the Development of Fusion Energy ('Fusion for Energy')

    Rådgivende ingeniørtjenester for bygg og anlegg

    Provision of Nuclear Safety I&C Consultancy, Design and Qualification Services

    Fusion for Energy is planning a framework contract for nuclear-safety instrumentation and control engineering services, including technical specifications, contract follow-up and system acceptance, I&C consultancy, safety-system design, and related tools or services. Suppliers with relevant I&C engineering expertise can contribute to the procurement’s planning phase; the notice does not specify a feedback method. Amentum Clean Energy France SAS (formerly Jacobs Clean Energy France SAS) has held the existing contract.

    Planning
    Dec 11, 2026(17 days)
  • The European Joint Undertaking for ITER and the Development of Fusion Energy ('Fusion for Energy')

    Brann- og sikkerhetstjenester

    Integration of the JT-60SA Actively Cooled Divertor

    The European Joint Undertaking for ITER and the Development of Fusion Energy (F4E) needs services and hardware to integrate the actively cooled divertor for the JT-60SA facility under a 43-month contract. Services include storage, assembly, welding, installation and inspection of divertor and diagnostic components; hardware includes Langmuir probes, Rogowski coils, thermocouples, gas injection pipes, electrical shunts, diagnostic connectors, fasteners, alignment components and main water pipe caps. The award criteria are technical quality (60%) and price (40%).

    Competition with qualification
    Nov 30, 2026(6 days)
  • Compagnie Nationale du Rhône

    Elektrisk infrastruktur og veibelysning

    Système de qualification européenne pour la fourniture et la rénovation de ponts roulants, portiques et dégrilleurs des usines de production de CNR.

    Les prestations consistent à concevoir, construire, réparer, améliorer, livrer, installer sur site et mettre en service des pont roulants, portiques et dégrilleurs dans ses aménagements hydroélectriques. Le système de qualification est divisé en lots comme suit: — lot 1: fourniture de ponts roulants, portiques et semi-portiques neufs de CMU inférieure à 70 t, — lot 2: fourniture de ponts roulants, portiques et semi-portiques neufs de CMU supérieure à 70 t, — lot 3: rénovation sur site et en atelier comprenant les études, la fabrication et l’installation (parties électrique, mécanique et protection), de ponts roulants, portiques et semi-portiques neufs de CMU inférieure à 70 t, — lot 4: rénovation sur site et en atelier comprenant les études, la fabrication et l’installation (parties électrique, mécanique et protection), de ponts roulants, portiques et semi-portiques neufs de CMU supérieure à 70 t, — lot 5: rénovation sur site et en atelier comprenant les études, la fabrication et l’installation (parties électrique, mécanique et protection) de dégrilleurs, - Lot 6 : fourniture de dégrilleurs neufs tous tonnages, - Lots 7 ; Maintenance tous nivaux des ponts roulants, des portiques et des dégrilleurs tous tonnages, - Lot 8 : Rénovation sur site et en Atelier comprenant les études, la fabrication et l'installation de chariots de manœuvre pour hausses Aubert.

    Qualification system
    Jul 21, 2028(100+ days)