Ireland: Tenders/Limerick City and County Council_103432/Foynes to Limerick Road (including Adare Bypass)

Foynes to Limerick Road (including Adare Bypass)

Planned

The competition has not been announced yet.

Deadline
Nov 25,1 day left
Agreement
Construction work
Estimated value
€380Mover 4 years

Brief

Limerick City and County Council is planning construction works to complete the Foynes to Limerick Road, including the Adare Bypass, with contracts covering the Croagh–Rathkeale and Rathkeale–Foynes sections; the project includes new road links, junctions, bridges, a HGV rest area and associated infrastructure. Interested suppliers are encouraged to register their interest in tendering by emailing procurement@midwestroads.ie; this prior information notice is for information only, and registering is not required to submit a tender.

Vei- og gatearbeid

Previous winners

  • Who are you up against?

    The suppliers who have won similar contracts at Limerick City and County Council_103432

Will you bid?

The agent sets up the bid and writes the first draft. Free for 14 days.

From the notice

  • The Contracting Authority intends to seek tenders to complete the remaining sections of the Foynes to Limerick Road (including Adare Bypass) (the Project). The Project is being procured under multiple contracts with the Adare Bypass and the Adare to Attyflin sections currently under construction. It is the intention to advertise a tender for the construction of the section of the Project between the Croagh Junction, which is currently under construction as part of the Adare Bypass Contract, and the Rathkeale Junction (where the Project ties back into the existing N21) in late November 2026. It is planned that a tender to construct the remaining section of the Project between the Rathkeale Junction and Foynes will be advertised in the second half of 2027. The completion of this section will mark the completion of all road infrastructure associated with the Project. The proposed Project is 35km in length and will provide a motorway upgrade from Attyflin to Rathkeale in addition to connecting the port of Foynes to the motorway network. The Design and Construction of the proposed Foynes to Limerick Road (including Adare Bypass) will comprise approx. 15.6km of Type 2 Divided Protected Road connecting from Foynes to Rathkeale (Section A & C), approx. 1.9km of Type 1 Single Carriageway connecting from Askeaton to Ballyclogh (Section B), approx. 17.5km of Motorway connecting from Rathkeale to the existing motorway network at Attyflin (Section D) as well as a HGV Rest Area adjacent to Foynes Port. The project also involves the construction of new junctions, realignment of existing roads (National, Regional & Local) and all associated works including but not limited to; multiple new river bridges, sideroad overbridges/underbridges, farm underpasses, culverts, extensive earthworks, drainage, attenuation ponds and wetlands, accommodation works and private accesses, utility diversions including diversion of electricity, gas, communications and water, ITS provision and traffic management. Various enabling works contracts have been completed or are ongoing including the construction of 3 railway bridges, utility diversions including 2 no. high-pressure gas main diversions at Rinculla and Croagh, ESB network alterations (HV/MV/LV), Uisce Éireann & Eir diversions, site clearance, fencing, surveys & investigations including archaeological slit trenching, Ground Investigations, Topographical Surveys and Underground Utility Surveys. Construction of the 7km Adare Bypass (part of Section D) commenced in January 2025 and construction of the 3.5km Adare to Attyflin section (also part of Section D) commenced in June 2026. The Environmental Impact Assessment Report and other planning documents associated with the Project can be found at the following link: https://www.foyneslimerick.ie Anticipated Procedure Type: Open Tender Procedure. Anticipated Award Criteria: Pass in respect of all criteria in the Suitability Assessment Questionnaires; Most Economically Advantageous Tender (MEAT). The assessment of the MEAT will be made on the basis of quality and price. Anticipated Key Dates: *** Estimated period for publication of Contract Notice(s) - Late November 2026 for the Croagh to Rathkeale section and September 2027 for the Rathkeale to Foynes section of the Project. *** Full Project Completion - 2030. Please note that these works cannot proceed to Tender and Construction until they pass through Gate 3 of the Dept. of Public Expenditure, Infrastructure, Public Services Reform and Digitalisation. Link: https://www.gov.ie/en/department-of-public-expenditure-infrastructure-public-service-reform-and-digitalisation/collections/infrastructure-guidelines/ This Procurement Prior Information Notice (PIN) is for information only. Economic Operators are encouraged to register their interest in tendering for the Contract(s) by email to procurement@midwestroads.ie. Economic Operators who have not registered their interest will not be precluded from submitting a tender.

  • Contact

    procurement@midwestroads.ie
  • Type
    Planning
  • Location
    Mid-West, South-West
  • Main code
    Road construction works
    45233120
  • 45221111Road bridge construction work45221211Underpass45221220Culverts45233110Motorway construction works45233121Main road construction works45233124Trunk road construction work45233125Road junction construction work45233128Roundabout construction work45233130Construction work for highways45233320Foundation work for roads71322000Engineering design services for the construction of civil engineering works

Similar active competitions

  • Limerick City and County Council_103432

    Rådgivende ingeniørtjenester for bygg og anlegg

    Multidisciplinary Services for the Castletroy Link, Limerick - Stages 5-7

    Limerick City and County Council needs multidisciplinary services for the Castletroy Link, Limerick, for a new distributor road approximately 680m in length, including a 9.7m wide carriageway with two traffic lanes and a 3.5m wide bus lane, footpaths, segregated cycle track, and planted verges with 1 in 2 road embankment side slopes. The contract has a maximum total value of 1,500,000 EUR and a duration of 40 months. The project location is South-West.

    Competition
    Nov 23, 2026(0 days)
    €1,500,000
  • Limerick City and County Council_103432

    Rådgivende ingeniørtjenester for bygg og anlegg

    Limerick City and County Council Consultancy Services for the inspection, design, procurement, construction and handover phases of Bridge Rehabilitation Works in County Limerick 2027 - 2031

    Limerick City and County Council needs consultancy services for bridge rehabilitation projects throughout County Limerick, covering inspection, planning, design, tender evaluation and procurement, construction, and handover. The contract is for 1 year, with three optional 1-year extensions (1+1+1+1), subject to funding and satisfactory performance, and has a maximum total value of €400,000. PUNCH Consulting Engineers holds the previous similar consultancy contract.

    Competition
    Dec 7, 2026(13 days)
    €400,000
  • Clare County Council

    Oppføring av bygninger

    Claureen Link Road Phase 1

    Clare County Council requires construction of the approximately 650-metre Claureen Link Road in Ireland’s Mid-West over 12 months, with a maximum contract value of €5.5 million. The works will connect a proposed roundabout on Drumcliffe Road/Claureen Drive with a new arm on the N85/Lahinch Road roundabout, and include site clearance, fencing and boundary works, drainage and culverts, earthworks, pavements, kerbs, footways and paved areas, signs and road markings, public lighting, landscaping, utility ducts, watermain works and diversions, and footpath and cycle-track works.

    Competition
    Dec 11, 2026(17 days)
    €5,500,000