Galway City Council Bridge Remediation Salmon Weir Bridge
Expired
The competition has expired without a winner being announced.
Bygg og anlegg - Bruer og tunneler
Galway City Council needs works for bridge remediation at Salmon Weir Bridge over 4 years, with an estimated total spend of €2.5 million. The project involves site setup, water quality protection, traffic management, site clearance, vegetation and algae removal, graffiti removal, specialist stonework cleaning, masonry repairs and repointing, repair of concrete scour aprons, parapet baluster repairs and repainting, replacement of heritage lamp standards and lantern heads, associated electrical works, footpath construction, road pavement works, provision of new parapet architectural striplighting, and surface preparation and maintenance painting of the existing watermain.
About the bid
- Contact phone
- 091536400
- Contact email
- James.murphy@galwaycity.ie
- Address
- Galway City Council, H91 X4K8 Galway
The scope of the proposed remedial works is summarised briefly as follows: • Site set-up; • Installation of water quality protection measures; • Traffic management; • Site clearance including vegetation clearance from embankments adjacent to the bridge; • Removal of all vegetation and algae from stonework faces; • Graffiti removal; • Cleaning of stonework (specialist mild abrasive blast system appropriate to protected structures); • Masonry Repairs (high quality sympathetic repairs by historic structure specialist mason); • Masonry Repointing of Joints (by historic structures specialist); • Repair of existing concrete scour aprons; • Parapet Balusters (in-situ repairs, surface prep and repainting); • Replacement of Heritage Lamp Standards and Lantern Heads; • Electrical works associated with Heritage Lighting; • Breakout of existing footpaths and construction of new footpaths; • Planing out existing road pavement and undertaking road pavement inlay; • Provision of new parapet architectural striplighting and associated electrical works; • Surface preparation and maintenance painting of existing watermain running along the southern elevation of the bridge. Galway City Council reserves the right to add additional contracts to this competition over the next few years 4 years with the an estimate spend of €2.5m.
Custom Assessment Criteria
Start a free trial to ask your own questions about the tender and get AI-generated answers.
Award Criteria
Found no award criteria in the contract notice.
Qualification requirements
Found no qualification requirements in the contract notice.
Previous Contract Winners
Start a free trial to see who has won similar tenders for this buyer.
See the full notice
- Contracting authority
- Galway City Council
- Title
- Galway City Council Bridge Remediation Salmon Weir Bridge
- Type
- Main code
- Supplemental codes
- Location
- West
- Estimated value
- €2,500,000.00
- Duration
- 4 years