All tenders: Ireland/EirGrid plc/Green Electricity Supply for EirGrid Interconnector Designated Activity  Company

Green Electricity Supply for EirGrid Interconnector Designated Activity  Company

Awarded

The competition has ended and a winner has been selected.

Qualification deadline
Nov 5, 2025Expired
Procedure
Without prior noticeTwo stages
Agreement
Framework agreement
Estimated value
€1M

Brief

EirGrid plc has entered into a framework agreement with LCC Power Ltd t/a GO Power for the provision of Green Electricity for EirGrid Interconnector Designated Activity Company. The services are to be delivered in Dublin, specifically at the Portan Converter Station in Woodland Co. Meath. The contract is for an initial period of 2 years, with a potential total duration of 8 years, and has an estimated total value of 1 million EUR. No tender responses were received, leading to a direct appointment.

Electricity and energy management

Result

TED
  • LCC Power Ltd t/a GO Power
    Winner
  • Number of tenders received
    0
  • Contract value
    Not stated
  • Maximum framework agreement valueUp to €1,000,000

Previous winners

  • Who are you up against?

    The suppliers who have won similar contracts at EirGrid plc

Will you bid?

The agent sets up the bid and writes the first draft. Free for 14 days.

From the notice

  • A single party Framework for the provision of Green Electricity for EirGrid Interconnector Designated Activity Company. Please note the meter is located at Portan Converter Station in Woodland Co. Meath and the MPRN is 21305588106. The MIC for the meter is 3,684 kVA and the metering data for the previous 24 months is attached in supporting document. Please note EWIC was not operated in SVC mode in the last 2 years therefore there was no energy usage. For the purpose of evaluation, we have included previous usage data from 2021 and 2022 for you to base your response on. The future requirement for SVC operation is unpredictable as it only occurs under certain conditions. No tender responses were received, hence a direct appointment is being made. Contract is for 2 years initially and potentially for 8 years in total. The €1M value represents the estimated total spend over the potential 8 year period. Original tender reference for this was ENQEIR953

  • Contact

    tenders@eirgrid.com
  • Type
    Result · Framework agreement · Prequalification
  • Location
    Dublin
  • Main code
    Electricity
    09310000

Similar active competitions

  • Transport Infrastructure Ireland (TII)

    Electricity and energy management

    Transport Infrastructure Ireland Corporate Power Purchase Agreement (CPPA) for the MetroLink Programme

    Transport Infrastructure Ireland (TII), as sponsoring agency for the MetroLink Programme, is planning a Corporate Power Purchase Agreement to secure 100% renewable electricity for the programme’s construction phase. TII seeks input from renewable generators, utilities, licensed suppliers, aggregators, renewable asset managers and independent power traders on market capability, procurement and contract models, commercial structures, risk allocation, pricing, and related services such as forecasting, balancing, settlement and renewable certification, to inform its future procurement strategy and documentation.

    Planning€500,000,000
  • ESB Networks DAC

    CON 1092 Demand Flexibility

    ESB Networks intends to procure Demand Flexibility Services for the national electricity distribution system in Ireland. Services will take the form of a contracted remunerated service for altering consumption or generation in response to a pre-agreed schedule with ESB Networks. These services will be scheduled for delivery or to be available for delivery to meet the ESB Networks requirements during pre-agreed Service Windows and will be utilised to manage network conditions.

    Qualification system
    Dec 27, 2027(100+ days)
  • Gas Networks Ireland

    Electricity and energy management

    26/008 - Qualification System for The Provision of Electricity to GNI ROI and NI

    Gas Networks Ireland needs electricity for a 10-year period. The procurement is divided into two lots: Lot 1 for the Republic of Ireland (ROI) and Lot 2 for Northern Ireland (NI). Applicants can qualify for one or both lots. Offers will be evaluated based on price and quality.

    Qualification system
    Feb 25, 2036(100+ days)