All tenders: Ireland/Donegal County Council_1193/HCS 0319 - Construction of 30no. social housing units and all associated site development works at Cois Abhainn (Phase 3), St. Johnston, Co. Donegal

HCS 0319 - Construction of 30no. social housing units and all associated site development works at Cois Abhainn (Phase 3), St. Johnston, Co. Donegal

Awarded

The competition has ended and a winner has been selected.

Deadline
Jul 23Expired
Award
Price, weight 30
Procedure
OpenSingle stage
Agreement
Construction work
Estimated value
€7.8Mover 20 months

Brief

Donegal County Council has entered into an agreement with Lowry Construction Ltd for the construction of 30 social housing units and associated site development works at Cois Abhainn (Phase 3), St. Johnston, Co. Donegal. The project includes 4 one-bedroom apartments, 4 two-bedroom apartments, 8 two-bedroom houses, 12 three-bedroom houses, and 2 four-bedroom houses. The works also involve site clearance, ESB diversions, new access roads, resurfacing, retaining walls, footpaths, surface water attenuation, underground water storage, carparking, and new foul and surface water connections, including an upgrade to the existing wastewater pumping station and installation of a watermain booster pump. The contract has a duration of 20 months and a final value of 7,665,000 EUR.

Residential Buildings and Housing Projects

Result

TED
  • Lowry Construction Ltd
    Winner
  • Number of tenders received
    4
  • Contract value
    €7,665,000

Previous winners

  • Who are you up against?

    The suppliers who have won similar contracts at Donegal County Council_1193

Will you bid?

The agent sets up the bid and writes the first draft. Free for 14 days.

Award Criteria

  • Description

    70% Quality

    Source

    No source found in the documents. Check the weight against the tender documents.

  • Description

    30%

    Source

    No source found in the documents. Check the weight against the tender documents.

From the notice

  • The works comprise of the construction of 30no. two storey social housing units consisting of 4no. 1 bedroom apartments, 4no. 2 bedroom apartments, 8no. 2 bedroom houses, 12no. 3 bedroom houses, 2no. 4 bedroom houses. The associated site works and services consist of the following non exhaustive list: site clearance and excavation works, ESB diversions, new access roads, resurfacing of existing roads, retaining walls, footpaths, on site surface water attenuation, underground static water storage tanks, carparking, construction of new foul and surface water connections to include upgrade of existing foul wastewater pumping station with a new rising main and installation of watermain booster pump.

  • Contact

    procurement@donegalcoco.ie
  • Type
    Result
  • Location
    Border
  • Main code
    Construction work
    45000000
  • 45210000Building construction work45211000Construction work for multi-dwelling buildings and individual houses45211100Construction work for houses45211300Houses construction work45211340Multi-dwelling buildings construction work

Similar active competitions

  • Donegal County Council_1193

    Consulting Engineering Services for Construction and Civil Engineering

    DONEGAL COUNTY COUNCIL SEEKS EXPRESSIONS OF INTEREST FROM CONTRACTORS FOR THE DESIGN-AND-BUILD OF FIVE SOCIAL HOUSING UNITS AT COSAN NA INARLAI, RATHMULLAN COUNTY DONEGAL

    Donegal County Council needs a contractor to design and build five social housing units, including all associated site development works, at Cosán na hInarlaí, Rathmullan, County Donegal. The works contract is expected to last 15 months and has a maximum total value of €1.5 million. The procurement begins with an expression-of-interest and prequalification stage, followed by a restricted competition.

    Competition with qualification
    Dec 14, 2026(18 days)
    €1,500,000
  • Waterford City and County Council_103683

    Residential Buildings and Housing Projects

    WCCC26 651 Social Housing Apartment Development at The Glen, Waterford

    Waterford City and County Council needs construction works for a social-housing development at The Glen/Bridge Street and 6, 7 and 8 Anne Street in Waterford, with a 21-month duration and a maximum total value of €9 million. The project includes 17 new apartments—12 one-bedroom and five two-bedroom units—and refurbishment of the Anne Street properties to create three one-bedroom apartments and three two-bedroom duplex apartments, alongside demolition, bicycle parking, amenity areas, landscaping, boundary treatments and associated site works. The award criterion is quality (MEAT).

    Competition
    Dec 16, 2026(20 days)
    €9,000,000
  • Donegal County Council_1193

    Construction - Erection, Renovation and Maintenance of Buildings

    Establishment of a Multiparty Framework for the provision of Domestic Energy Efficiency Retrofitting services in County Donegal

    Donegal County Council needs domestic energy-efficiency retrofitting works in County Donegal through a multiparty framework agreement lasting 4 years, with a maximum total value of €4 million. The procurement concerns delivery of home energy-efficiency upgrades in the Border region.

    Framework agreement
    Jan 8, 2027(43 days)
    €4,000,000