HSE DML, HSE Pathfinder Decarbonisation Programme; Decarbonisation and Energy Upgrade of Regional Hospital Mullingar Mechanical Reserved Specialist.
Published deadline passed
The published deadline has passed. For multi-stage competitions a later tender deadline may still apply — check the notice or portal for the current phase.
- Qualification deadline
- Dec 12, 2025Expired
- Procedure
- With prequalificationTwo stages
Brief
Health Service Executive (HSE) needs mechanical installation work for the decarbonisation and energy upgrade of Regional Hospital Mullingar, with a maximum total value of 20,000,000 EUR over 24 months. The project involves service and fabric upgrades to the main hospital buildings, a new Energy Centre, and associated infrastructure site works, all to be carried out within a live hospital environment in Dublin. This includes replacement of flat roof finishes, installation of photovoltaic arrays, edge protection systems, large plant, and new cabling and electrical boards, as well as the construction of a new energy centre with heat pumps, ESB substation, transformer rooms, and a client switch room, along with a new MV ring main.
Mekaniske installasjoner
Previous winners
Who are you up against?
The suppliers who have won similar contracts at Health Service Executive (HSE)
Will you bid?
The agent sets up the bid and writes the first draft. Free for 14 days.
From the notice
The project involves service and fabric upgrades to the main hospital buildings at Regional Hospital, Mullingar, a new Energy Centre and associated infrastructure site works. Works will be carried out within a live hospital environment which must remain operational throughout. Works include replacement of existing flat roof finishes. Installation of roof level Photovoltaic arrays over new and existing roof finishes. Installation of edge protection systems. Installation of large plant and replacement of existing plant. Works within existing plantrooms and hospital building including installation of new cabling and electrical boards. Construction of a new energy centre including new heat pumps, ESB substation, transformer rooms and client switch room, with associated plant and equipment install and connection to new ESB incoming mains. Site works including installation of a new MV ring main including civil engineering/trench works.
Contact
procurement.helpdesk@hse.ie- Competition · PrequalificationType
- DublinLocation
- 45351000Main codeMechanical engineering installation works
- 71333000Mechanical engineering services