Infrastructure Development at IDA Ballymahon Road, Athlone

Awarded

The competition has ended and a winner has been selected.

Qualification deadline
Mar 30,Expired
Award
Procedure
With prequalificationTwo stages
Agreement
Construction work
Estimated value
€3.5M

Brief

IDA Ireland has entered into an agreement with Fox Building and Engineering Ltd. for the construction of a new carriageway approximately 450m in length and 7.0m wide, including verges, footpaths, site services, and all associated site works for the IDA Ballymahon Development project. The services will be delivered in Athlone, Ireland, with a final contract value of 3,133,393 EUR. Six bids were received for this contract.

Vei- og gatearbeid

Result

TED
  • Fox Building and Engineering Ltd.
    Winner
  • Number of tenders received
    6
  • Contract value
    €3,133,393

Previous winners

  • Who are you up against?

    The suppliers who have won similar contracts at IDA Ireland

Will you bid?

The agent sets up the bid and writes the first draft. Free for 14 days.

Award Criteria

  • Description

    Most economically advantageous tender

    Source

    No source found in the documents. Check the weight against the tender documents.

From the notice

  • The proposed works consist of the construction of new carriageway circa 450m in length (approx.) and 7.0m wide together with verge, footpaths, site services and all associated siteworks to the IDA Ballymahon Development project.

  • Contact

    procurement.ida@ida.ie
  • Type
    Result · Prequalification
  • Main code
    Construction work
    45000000
  • 45233120Road construction works45233123Secondary road construction work45233124Trunk road construction work

Similar active competitions

  • IDA Ireland

    Vei- og gatearbeid

    Infrastructure Delivery at IDA Dundalk Science and Technology Park

    IDA Ireland seeks works to extend infrastructure at IDA Dundalk Science and Technology Park, including a 400-metre road extension and associated services to enable further business park expansion. The works are to be carried out in Dublin over 6 months, with a maximum total contract value of €4.1 million.

    Competition
    Dec 10, 2026(18 days)
    €4,100,000
  • IDA Ireland

    Vei- og gatearbeid

    Lighting and Road Upgrades Works, IDA Business Park, Finisklin Co. Sligo

    IDA Ireland requires lighting and road upgrade works at IDA Business Park, Finisklin, County Sligo, over a 1-month contract with a maximum total value of €350,000. The works include supplying and installing LED public lighting and associated columns, cabling, ducting and electrical servicing, alongside road planing and resurfacing, footpaths and dropped kerbs, tactile paving, road-marking and signage upgrades, gully repairs, and vegetation trimming.

    Competition
    Dec 1, 2026(9 days)
    €350,000
  • Clare County Council

    Oppføring av bygninger

    Claureen Link Road Phase 1

    Clare County Council needs construction of the approximately 650-metre Claureen Link Road in the Mid-West of Ireland, with a maximum total contract value of €5.5 million and a duration of 1 year. The works will connect a proposed roundabout on Drumcliffe Road/Claureen Drive to a new arm on the N85/Lahinch Road roundabout and include site clearance, fencing and boundary works, drainage and culverts, earthworks, pavements, kerbs and footways, traffic signs and road markings, public lighting, landscaping, utility ducts, watermain works and diversions, and cycle-track works.

    Competition
    Dec 9, 2026(17 days)
    €5,500,000