Installation of New Biomass Heating System at Aura Leisure Centre, Letterkenny
Expired
The competition has expired without a winner being announced.
- Deadline
- Aug 17,Expired
- Procedure
- OpenSingle stage
Brief
Donegal County Council_1193 needs the installation of a 500kW Biomass Boiler at Aura Leisure Centre in Letterkenny, Ireland, including associated mechanical and electrical works, a flue pipe, and storage, loading, and thermal storage systems. The project, with a maximum total value of 400,000 EUR, will last for 5 months. The main contractor will be responsible for the design, with the option to propose either an alteration and refurbishment of the existing biomass system or a new standalone system. Alterations to the existing boiler house and a new pressurisation system are also included in the scope of works.
Previous winners
Who are you up against?
The suppliers who have won similar contracts at Donegal County Council_1193
Will you bid?
The agent sets up the bid and writes the first draft. Free for 14 days.
From the notice
Installation of 500kW Biomass Boiler at Aura Leisure Centre including associated mechanical and electrical works to operate and connect to existing heating system and construction of a flue pipe. Storage, loading and thermal storage systems to be installed as part of the works. DCC are novating the design responsibility of the Contract to the main contractor who can propose either an alteration and refurbishment of the existing Biomass system which has been out of use since 2014 due to a basement system which was flooded or a new stand alone system. Alterations to the existing boiler house for the main building is also to be included in the scope of works and this is outlined in the technical specification including a new pressurisation system to be installed.
Contact
procurement@donegalcoco.ie- CompetitionType
- BorderLocation
- 45000000Main codeConstruction work
- 45331110Boiler installation work