Ireland: Tenders/The Irish Equine Foundation CLG/Integrated Design Team for Proposed Laboratory Development at the Irish Equine Centre

Integrated Design Team for Proposed Laboratory Development at the Irish Equine Centre

Awarded

The competition has ended and a winner has been selected.

Qualification deadline
Jan 26,Expired
Procedure
OpenTwo stages
Agreement
Buying services

Brief

The Irish Equine Foundation CLG has entered into an agreement with C.J. Falconer & Associates for Architect Led Integrated Design Team Consultancy Services for a proposed new laboratory development at Johnstown, Naas, Co. Kildare. The services include the construction of a new three-storey building of 1,690m² and a separate necropsy building of 400m², along with general re-design of car parking areas, a secondary access road, and reorganisation of below-ground services.

Laboratorietjenester

Result

TED
  • C.J. Falconer & Associates
    Winner
  • Number of tenders received
    5
  • Contract value
    Not stated

Previous winners

  • Who are you up against?

    The suppliers who have won similar contracts at The Irish Equine Foundation CLG

Will you bid?

The agent sets up the bid and writes the first draft. Free for 14 days.

From the notice

  • The services contract is to provide an Architect Led Integrated Design Team Consultancy Services for The Proposed New Laboratory Development at Johnstown, Naas, Co.Kildare. Scope of Services The purpose of this tender competition is to procure an Architect Led Integrated Design Team [AIDT] for: The existing microbiology building (to be retained functioning in its current format), to include a new dedicated boiler servicing the building), retention of administration and general staff services in the current building, with minimal internal refurbishment works, then the construction of a new separate Three-Storey building of 1,690m² and with a separate necropsy building of 400m² (located adjacent to the existing sewage treatment plant and similar to Scheme No. 2). General localised re-design of car parking areas on site, as the new building will occupy the centralised existing car park area, the construction of a secondary access road to the public road and the reorganisation of localised below ground services and pumping stations.

  • Contact

    pkelly@irishequinecentre.ie
  • Type
    Result · Prequalification
  • Location
    Mid-East
  • Main code
    Laboratory services
    71900000

Similar active competitions

  • University College Cork

    Appointment of Integrated Design Team for Cork University Business School New Building

    University College Cork needs an architect-led integrated design team to provide consultancy services for the new Cork University Business School building on Perrott’s Avenue, in Ireland’s South-West region. The 60-month contract has a maximum total value of €2.5 million and covers architectural, civil and structural engineering, mechanical and electrical engineering, Project Supervisor Design Process, and energy-efficient design coordination; quantity surveying services will be procured separately. The competition uses a two-stage restricted procedure.

    Competition with qualification
    Dec 21, 2026(29 days)
    €2,500,000
  • Kildare County Council_385

    Landskapsarkitektur

    Single Party Framework Agreement for Landscape Architect led Integrated Design team Services for the Development of Public Park in Newbridge for Kildare County Council

    Kildare County Council needs landscape architect-led integrated design team services for a framework agreement over 4 years, with a maximum total value of 1,000,000 EUR. The services include the preparation of a masterplan, Part 8 Planning Approval, detailed design, tender documentation, and construction stage services for the phased development of a public open space at Lakeside - Highfield, Dara Park, Newbridge, Co. Kildare, covering approximately 18 acres. Murray and Associates likely has a similar contract today.

    Framework agreement
    Dec 2, 2026(10 days)
    €1,000,000
  • Waterford City and County Council_103683

    Digital design og brukeropplevelse

    WCCC26 496 Integrated Design Team for the Development of 22 Lady Lane

    Waterford City and County Council needs an architect-led multidisciplinary design team for the redevelopment of 22 Lady Lane in Ireland’s South-East, over 3 years, with a maximum total contract value of €6 million. The team must include a Conservation Architect, civil, structural, mechanical and electrical engineers, quantity surveyors, and a building energy consultant.

    Competition
    Nov 23, 2026(1 day)
    €6,000,000