Ionad Oideachas agus Oige Údarás na Gaeltachta
Expired
The competition has expired without a winner being announced.
- Deadline
- Mar 18Expired
- Procedure
- OpenSingle stage
Brief
Údarás Na Gaeltachta_289 needs construction services for the "Ionad Oideachas agus Oige Údarás na Gaeltachta" project, with a maximum total value of 9,000,000 EUR over 36 months. The project involves the demolition of existing summer college buildings, covered outdoor spaces, a workshop building, and a pedestrian bridge. It also includes the construction of a new multi-functional building (2,543 m²) with classrooms, an assembly hall, and a lecture room, a new workshop building (199 m²), a new pedestrian bridge (26 m²) across the River Ruibhe, a new street-level car park and bus drop-off point (1,527 m²), relocation and upgrading works to the junction at Tearmann Ainnín, relocation of a pedestrian crossing (Road: R336), a new car park entrance junction from Road L52030, and all associated hard landscaping, landscaping, and above-ground and underground services.
Construction of buildings
Previous winners
Who are you up against?
The suppliers who have won similar contracts at St James's Hospital
Will you bid?
The agent sets up the bid and writes the first draft. Free for 14 days.
From the notice
1. Foirgnimh na gcoláistí samhraidh (968 m²), spásanna clúdaithe amuigh faoin aer (122 m²), foirgneamh forthí (170 m²) agus droichead coisithe reatha (9 m²) atá ann faoi láthair a leagan. 2. Coimeádán lasta a choinneáil le haghaidh stórála (15 m²). 3. Foirgneamh ilfheidhmeach nua a thógáil lena n-áirítear seomraí ranga, halla tionóil agus seomra léachta (2543 m²), foirgneamh forthí ceardlainne nua (199 m²), droichead coisithe nua trasna na hAbhann Ruibhe (26 m²), carrchlós nua ar leibhéal na sráide agus pointe seachadta bus nua (1527 m²), oibreacha athlonnaithe agus uasghrádaithe acomhail ar rochtain Thearmann Ainnín agus oibreacha athlonnaithe trasrian coisithe (Bóthar: R336) agus acomhal iontrála nua carrchlóis ó Bhóthar L52030 agus na seirbhísí cruadhreachtaithe, tírdhreachtaithe agus seirbhísí gaolmhara os cionn talún agus faoi thalamh atá ag teastáil. Demolition of the existing summer college buildings (968 m²), covered outdoor spaces (122 m²), existing workshop building (170 m²), and existing pedestrian bridge (9 m²). Retention of a shipping container for storage purposes (15 m²). Construction of a new multi-functional building including classrooms, an assembly hall and a lecture room (2,543 m²); a new workshop building (199 m²); a new pedestrian bridge across the River Ruibhe (26 m²); a new street-level car park and new bus drop-off point (1,527 m²); relocation and upgrading works to the junction at the access to Tearmann Ainnín and relocation works to a pedestrian crossing (Road: R336); a new car park entrance junction from Road L52030; and all associated hard landscaping, landscaping, and above-ground and underground services required.
Contact
ruairi@udaras.ie- CompetitionType
- Mid-WestLocation
- 45000000Main codeConstruction work
- 45200000Works for complete or part construction and civil engineering work45210000Building construction work45220000Engineering works and construction works