Germany: Tenders/BEW Berliner Energie und Wärme GmbH/Klingenberg Backbone - Electrical Scope (KLBB)

Klingenberg Backbone - Electrical Scope (KLBB)

Awarded

The competition has ended and a winner has been selected.

Award
Evaluation of performance, weight 60
Procedure
With negotiationTwo stages
Agreement
Construction work
Estimated value
€1until Jan 2031

Brief

BEW Berliner Energie und Wärme GmbH has entered into an agreement with Paralos Energy PC for the refurbishment of the combined heat and power plant at the Klingenberg site in Berlin, Germany. This involves the construction of a new high-voltage (110 kV) and medium voltage connection, installation of new high-voltage transformers and stands, SF6-free switchgear, and a new grid connection building with technical equipment. The contract has a final value of 79,958,226 €.

Oppføring av bygninger

Result

TED
  • Paralos Energy PC
    Winner
  • Number of tenders received
    1
  • Contract value
    €79,958,226

Previous winners

  • Who are you up against?

    The suppliers who have won similar contracts at BEW Berliner Energie und Wärme GmbH

Will you bid?

The agent sets up the bid and writes the first draft. Free for 14 days.

Qualification requirements

  • Description

    The applicant must submit a covering letter presenting the company and its complete group structure (including ownership).

    Documentation Requirement

    A covering letter presenting the company and its complete group structure (including ownership). Mention of the main contact person for this tender with name, function, mail address, mobile phone number.

    Source

    No source found in the documents. Check the requirement against the tender documents.

  • Description

    The applicant must declare mandatory and optional exclusion criteria within the meaning of Sections 123 and 124 of the Act against Restraints on Competition (GWB), Section 21 of the Act on Posting of Workers (AentG), Section 98c of the Residence Act (AufenthG), Section 21 of the Undeclared Employment Act (SchwarzArbG) and Section 19 of the Minimum Wage Act (MiLoG).

    Documentation Requirement

    Declaration of mandatory and optional exclusion criteria within the meaning of Sections 123 and 124 of the Act against Restraints on Competition (GWB), Section 21 of the Act on Posting of Workers (AentG), Section 98c of the Residence Act (AufenthG), Section 21 of the Undeclared Employment Act (SchwarzArbG) and Section 19 of the Minimum Wage Act (MiLoG). The applicant must use the form provided at the contact point (see Section I.1) notice).

    Source

    No source found in the documents. Check the requirement against the tender documents.

  • Description

    The applicant must declare that they have read and understood the Code of Conduct for Suppliers and Partners and Vattenfall GmbH´s policy statement in accordance with the Supply Chain Sourcing Obligation Act (LkSG). The applicant further declares that they will perform their services in accordance with the UN Global Compact principles and the principles of the policy statement, and commits themselves to monitor both themselves and their suppliers/subcontractors constantly to ensure that performance is maintained and complies with these principles. The applicant states that none of the deviations from the UN Global Compact is valid for them or any suppliers/subcontractors used by them for the service provision.

    Documentation Requirement

    Declaration by the applicant that they have read and understood the Code of Conduct for Suppliers and Partners and Vattenfall GmbH´s policy statement in accordance with the Supply Chain Sourcing Obligation Act (LkSG). The Code can be found under "Code of Conduct for Suppliers and Partners" https://group.vattenfall.com/who-we-are/suppliers The policy statement can be found at: www.vattenfall.de/lieferkettensorgfaltspflichtengesetz The applicant further declares that they will perform their services in accordance with the UN Global Compact principles and the principles of the policy statement, and commits themselves to monitor both themselves and their suppliers/subcontractors constantly to ensure that performance is maintained and complies with these principles. The applicant states that none of the deviations from the UN Global Compact is valid for them or any suppliers/subcontractors used by them for the service provision. The applicant must use the form provided at the contact point (see Section I.1) notice).

    Source

    No source found in the documents. Check the requirement against the tender documents.

  • Description

    The applicant must provide a self-declaration regarding Russia sanctions.

    Documentation Requirement

    Self-declaration Russia sanctions. The applicant must use the form provided at the contact point (see Section I.1) notice).

    Source

    No source found in the documents. Check the requirement against the tender documents.

  • Description

    The candidate must meet an average annual turnover requirement over the three most recent years of a minimum of 40 MEUR.

    Documentation Requirement

    Proof that the candidate meets an average annual turnover requirement over the three most recent years of a minimum of 40 MEUR.

    Source

    No source found in the documents. Check the requirement against the tender documents.

  • Description

    The awarding authority will carry out a credit check to determine the financial and economic capacity of the applicant based on the submitted annual reports. The applicant is considered to be financially suitable if the credit check shows that the applicant company is financially sound and large enough in relation to the value and term of the contract to fulfil all contractual obligations. For this purpose, the applicant must have adequate profit margins and sufficient operating cash flows as well as an appropriate capital base with a generally acceptable (low) level of debt. The size and financial profile of the applicant must also be proportionate to the value of the contract and there must be a positive outlook that the applicant will be able to maintain its financial fitness during the term of the contract.

    Documentation Requirement

    Submission of the complete consolidated Annual Reports (or similar) with an unqualified auditor’s report including the management report, appendices, auditor’s approvals and comments from the last 3 financial years with information on the profit and loss account, the balance sheet and the cash flow statement.

    Source

    No source found in the documents. Check the requirement against the tender documents.

  • Description

    The applicant must provide reference information for comparable services to the tendered service. A minimum of two references are required that demonstrate experience with a comparable range of services as defined in Section 5.1. This includes having executed engineered, procured, constructed scopes of work on a turnkey basis for a high-voltage connection (≥ 110 kV and ≥ 50 MVA) or equivalent, including switchgear, transformers and grid connection building. The references shall not be commissioned earlier than 1st January, 2017.

    Documentation Requirement

    For each reference, please utilize the provided form located at the contact point of the announcement (AnnexReference_Form).

    Source

    No source found in the documents. Check the requirement against the tender documents.

  • Description

    The applicant must fill in an H&S questionnaire and comply with the H&S exclusion criteria in full as minimum conditions. The contracting entity will also evaluate the answers in the HSE questionnaire and the applicant must achieve a minimum score of 10 points (= 30 percent) in order to be allowed to continue with the tendering process. The specific conditions for awarding the points available are set out in the questionnaire.

    Documentation Requirement

    The applicant shall fill in an H&S questionnaire. The list of questions is provided by the contact point (cf. Section I.1)). Applicants who do not meet the minimum requirements are requested to submit a separate document in which they describe the reasons for not meeting the minimum requirements and also state which improvement measures have already been initiated and which additional measures are planned for the future.

    Source

    No source found in the documents. Check the requirement against the tender documents.

  • Description

    The applicant must provide information on the expected delivery time for transformers and high voltage SF6-free switchgear to comply with the expected completion date as per section 5.1.3.

    Documentation Requirement

    Information on the expected delivery time for transformers and high voltage SF6-free switchgear.

    Source

    No source found in the documents. Check the requirement against the tender documents.

Award Criteria

  • Description

    Price

    Source

    No source found in the documents. Check the weight against the tender documents.

  • Description

    The performance criteria are defined in the tender phase.

    Source

    No source found in the documents. Check the weight against the tender documents.

From the notice

  • The central procurement body is undertaking a refurbishment project for the combined heat and power plant located at the Klingenberg site in Berlin, Germany. As part of this initiative, there are plans to construct a new high-voltage (110 kV) and medium voltage connection adjacent to the current grid connection. The scope of work encompasses the installation of new high-voltage transformers and stands, SF6-free switchgear, and the construction of a new grid connection building including technical building equipment and auxiliaries.

  • Contact

    einkauf@bew.berlin
  • Type
    Result · Prequalification
  • Location
    Berlin
  • Main code
    Construction work for power plant
    45251100
  • 31170000Transformers31682540Substation equipment45200000Works for complete or part construction and civil engineering work45210000Building construction work45213200Construction work for warehouses and industrial buildings45213250Construction work for industrial buildings45232220Substation construction work45232221Transformer substation45315700Switching station installation work

Similar active competitions

  • DB Energie GmbH (Bukr 31)

    Kraftforsyning og reservestrøm

    GUw-Retrofitprojekte Frohnau, Pankow-Heinersdorf, Friedrichstr., Schöneberg und Oranienburg

    DB Energie GmbH benötigt Bauleistungen für Retrofitprojekte an fünf Umspannwerksstandorten in Berlin: Frohnau, Pankow-Heinersdorf, Friedrichstraße, Schöneberg und Oranienburg. Der Auftrag umfasst den Austausch der Stationsleittechnik und ist in fünf Raumlose aufgeteilt. Der Zuschlag erfolgt ausschließlich nach dem Preis (100 %).

    Competition with qualification
    Dec 14, 2026(22 days)
  • Stromnetz Berlin GmbH

    Elektrisk infrastruktur og veibelysning

    Qualifizierungssystem Projektspezifische, betriebsfertige, elektrotechnische Ausrüstung von Umspannwerken und Netzknoten der Stromnetz Berlin GmbH

    Die Stromnetz Berlin GmbH beabsichtigt im Rahmen der Energiewende die Realisierung diverser Erweiterungs- und Ertüchtigungsmaßnahmen des Verteilnetzes im Land Berlin. Hierzu gehören sowohl der Neubau, Teilersatz und Ertüchtigung von Umspannwerken und Netzknoten vor dem Hintergrund des Netzausbaus bzw. der alters- und zustandsbedingten Ablösung von Betriebsmitteln, die ihre technisch-wirtschaftliche Nutzungsdauer erreicht haben. Zweck dieses Qualifizierungssystems ist die Auswahl qualifizierter und zuverlässiger Unternehmen für die Vergabe und Durchführung von Generalunternehmer- oder Generalübernehmerleistungen im Bereich des Elektrobaus zur projektspezifischen, betriebsfertigen, elektrotechnischen Ausrüstung von Umspannwerken und Netzknoten im Berliner Stromnetz. Die dafür benötigten Leistungsumfänge sind u.a. Folgende: Projektspezifische, betriebsfertige elektrotechnische Ausrüstung von 110/10-kV Umspannwerken insbesondere der Errichtung oder dem Anschluss einer in der Regel 7-feldrigen 110-kV-SF6-freien-Schaltanlage unter Berücksichtigung der Novellierung der F-Gase Verordnung EU 2024/573 vom 7. Februar 2024 einschließlich zugehöriger Bedienungsschränke und Feldverkabelung, einer 10-kV-Schaltanlage (2500A Bemessungsstrom mit durchschnittlich 80 Schaltfeldern), Errichtung der Leittechnik, Schutztechnik, Eigenbedarf, Nebenanlagen und primärtechnische und sekundärtechnische Anbindung der Transformatoren und Sternpunktbildner und Projektspezifische, Betriebsfertige elektrotechnische Ausrüstung von 110-kV Netzknoten insbesondere der Errichtung oder dem Anschluss einer in der Regel 23 bis 31-feldrigen 110-kV-SF6-freien-Schaltanlage unter Berücksichtigung der Novellierung der F-Gase Verordnung EU 2024/573 vom 7. Februar 2024 einschließlich zugehöriger Bedienungsschränke und Feldverkabelung, Errichtung von Schutztechnik-, Leittechnik-, Eigenbedarfs- und Nebenanlagen, die Einbindung des beigestellten Sammelschienenschutzes sowie etwaig vorgesehener Kompensationsspulen sowie Projektspezifische, betriebsfertige elektrotechnische Ertüchtigung von 110/10-kV Umspannwerken insbesondere der sekundärtechnischen Ertüchtigung einer in der Regel 3-feldrigen 110-kV-SF6-Schaltanlage einschließlich zugehöriger Bedienungsschränke und Feldverkabelung, einer 10-kV-Schaltanlage (2500A Bemessungsstrom mit durchschnittlich 60 Schaltfeldern), Ersatz der Leittechnik, Schutztechnik, Eigenbedarf, Nebenanlagen und primärtechnische und sekundärtechnische Anbindung der Transformatoren und Sternpunktbildner. Zum Leistungsumfang gehören ferner die betriebsfertige Herstellung der Verbindungen aller sekundären und primären Schnittstellen im Umspannwerk bzw. im Netzknoten sowie die Prüfung, die Inbetriebnahme und die Dokumentation, sowie die Anpassung der Schutz - und Leittechnik in den Gegenwerken, die Gesamtprojektsteuerung, Planung, Konstruktion, Fertigung, Werksprüfung, Systemtest Stationsleittechnik, Lieferung, Montage, Prüfung, Inbetriebnahme, Probebetrieb Gesamtsystem, Abnahme und Dokumentation. Die ingenieurtechnische Bearbeitung der Schaltungstechnik hat in Engineering Base mit EVU- und QS- Modul entsprechend EB-Handlungsvorschrift und EB-Prozess des Auftraggebers zu erfolgen. Darüber hinaus plant, koordiniert und erstellt bzw. beschafft der Auftragnehmer alle zur Erfüllung des Auftrages notwendigen technischen Einrichtungen und Softwareleistungen. Beistellungen des Auftraggebers: Als auftraggeberseitige Beistellungen sind bei Umspannwerken i. d. R. die 110-kV-Schaltanlage einschließlich Wandler, Gasraumüberwachung, Feldverkabelung, Bedienschränke, die Transformatoren, die Sternpunktbildner und alle Schutzrelais vorgesehen. Bei Netzknoten ist i. d. R. die auftraggeberseitige Beistellung für die 110-kV-Schaltanlage einschließlich Wandler, Gasraumüberwachung, Feldverkabelung, Bedienschränke, die Kompensationsspulen und der Sammelschienenschutz vorgesehen.

    Qualification system
    Sep 25, 2028(100+ days)
  • 50Hertz Transmission GmbH

    Oppføring av bygninger

    Ersatzneubau Umspannwerk UW Reuter

    50Hertz Transmission GmbH benötigt in Berlin den Ersatzneubau des Umspannwerks UW Reuter. Der Bauauftrag umfasst eine Schaltanlagenhalle mit Betriebsgebäude, Einhausungen für Großgeräte, ein 110-kV-Schaltanlagengebäude sowie Fundamente, Straßen, Entwässerungs- und Zaunanlagen und Geländeregulierung; vorgesehen sind rund 17.000 m² Grundstücksfläche, 6.500 m² Bruttogrundfläche und 75.600 m³ Bruttorauminhalt. Die Bauzeit beträgt 26 Monate. Das Vergabeverfahren besteht aus einer Qualifikationsphase und einem anschließenden Bieterwettbewerb. Für die Teilnahme sind mindestens drei in den letzten sieben Jahren abgeschlossene Referenzprojekte im Hochbau nachzuweisen, jeweils mit einem Mindestvolumen von 15 Millionen Euro für Kostengruppen 300–500; anerkannt werden insbesondere geleitete Neubauten von Industriegebäuden oder Industrie- und Lagerhallen. Außerdem muss der Bewerber für die gesamte Projektlaufzeit an jeder Arbeitsstelle eine deutschsprachige Ansprechperson mit mindestens B2-Niveau und einschlägiger Fachterminologie bereitstellen. Der Umsatz muss 2023, 2024 und 2025 jeweils mindestens 20 Millionen Euro netto betragen haben. Die Zuschlagswertung gewichtet den Preis mit 55 Punkten, technische Anforderungen mit 38 Punkten sowie kaufmännische und juristische Kriterien mit 7 Punkten.

    Competition with qualification
    Dec 16, 2026(24 days)