Germany: Tenders/BEW Berliner Energie und Wärme GmbH/Klingenberg Biomass (KLBM)

Klingenberg Biomass (KLBM)

Cancelled

The competition has been cancelled.

Qualification deadline
Apr 7, 2025Expired
Award
Leistungsbewertung gemäß Kriterienkatalog, weight 40
Procedure
With negotiationTwo stages
Agreement
Construction work
Estimated value
€1until Mar 2029

Brief

The objective of the KLBM project is the erection of a biomass fired combined heat and power plant with a thermal production capacity of approximately 210 MWth and an electrical capacity of approximately 50 MWel. The new plant is to be built at Koepenicker Chaussee 42, 10317 Berlin. It shall be integrated and constructed on the existing production site “Klingenberg” next to the operating plant. So, the erection of the new plant will be in a brown field situation. The feedstock/fuels shall be transported to the plant by ship, train and truck. The potential fuels are forest residues, landscaping materials, short rotation coppice and waste wood (categories AI, AII, AIII, AIV in accordance with the national Waste Wood regulations). The plant shall be designed and permitted according to the waste incineration emission law (17th BImschV). The plant shall be operated via an existing control room. The emissions of the plant shall meet the lowest BREF limits. It is planned to tender in English and with a bespoke contract based on FIDIC Yellow 1999 agreements. There will be only 1 EPC lot. At first, the EPC contractor will be responsible for the engineering needed for the permit application which is submitted by Vattenfall Wärme Berlin AG. Afterwards, the contractor is responsible for the entire EPC-scope of the new plant as turnkey supplier. The contractor is responsible for the conceptual design, engineering, purchasing, construction & commissioning of its scope. Following this concept, the contract is split into 2 phases: 1) The Liminted Notice to Proceed (LNTP), planned for 2025 and 2) The Final Notice to Proceed (FNTP), planned to begin in 2026. With the LNTP the contractor finalizes the design and permit engineering. With the final issue of the permit approval, the Contractor receives the FNTP. With the FNTP the “execution phase” begins. This phase is consisting of detail engineering, procurement, construction, commissioning and handover of the biomass plant. The commissioning of the biomass plant is currently scheduled for 2029. EPC – Scope The EPC scope consists of everything which is needed to build and operate a complete biomass CHP-plant. This includes for e.g. the following components and systems without guarantee of completeness: - Biomass steam boiler - Steam turbine with transformer (in order to connect the turbine to the local 110 kV grid) - Complete low voltage electrical equipment incl. all cables and routings - Complete flue gas system (flue gas cleaning, flue gas condensation system, heat recovery heat pump, stack) - Complete supply and disposal systems (ship, train & truck unloading, storage facilities for feedstock, foreign material separation, conveyor systems, system for ash storage and loading) - Complete civil works, incl. buildings, foundations & supporting steal structures - Complete I&C (control system, instrumentation & automation) - All pipings, valves and pumps - Waste water, water treatment systems & sewage systems The entire system must be certified with CE conformity.

Kraftforsyning og reservestrøm

Result

TED
  • Reason for cancellation
    Decision of the buyer because of a change in needs
  • Number of tenders received
    6

Previous winners

  • Who are you up against?

    The suppliers who have won similar contracts at BEW Berliner Energie und Wärme GmbH

Will you bid?

The agent sets up the bid and writes the first draft. Free for 14 days.

Award Criteria

  • Description

    Preis

    Source

    No source found in the documents. Check the weight against the tender documents.

  • Description

    Die Leistungskriterien werden in der Ausschreibungsphase definiert.

    Source

    No source found in the documents. Check the weight against the tender documents.

From the notice

  • The objective of the KLBM project is the erection of a biomass fired combined heat and power plant with a thermal production capacity of approximately 210 MWth and an electrical capacity of approximately 50 MWel. The new plant is to be built at Koepenicker Chaussee 42, 10317 Berlin. It shall be integrated and constructed on the existing production site “Klingenberg” next to the operating plant. So, the erection of the new plant will be in a brown field situation. The feedstock/fuels shall be transported to the plant by ship, train and truck. The potential fuels are forest residues, landscaping materials, short rotation coppice and waste wood (categories AI, AII, AIII, AIV in accordance with the national Waste Wood regulations). The plant shall be designed and permitted according to the waste incineration emission law (17th BImschV). The plant shall be operated via an existing control room. The emissions of the plant shall meet the lowest BREF limits. It is planned to tender in English and with a bespoke contract based on FIDIC Yellow 1999 agreements. There will be only 1 EPC lot. At first, the EPC contractor will be responsible for the engineering needed for the permit application which is submitted by Vattenfall Wärme Berlin AG. Afterwards, the contractor is responsible for the entire EPC-scope of the new plant as turnkey supplier. The contractor is responsible for the conceptual design, engineering, purchasing, construction & commissioning of its scope. Following this concept, the contract is split into 2 phases: 1) The Liminted Notice to Proceed (LNTP), planned for 2025 and 2) The Final Notice to Proceed (FNTP), planned to begin in 2026. With the LNTP the contractor finalizes the design and permit engineering. With the final issue of the permit approval, the Contractor receives the FNTP. With the FNTP the “execution phase” begins. This phase is consisting of detail engineering, procurement, construction, commissioning and handover of the biomass plant. The commissioning of the biomass plant is currently scheduled for 2029. EPC – Scope The EPC scope consists of everything which is needed to build and operate a complete biomass CHP-plant. This includes for e.g. the following components and systems without guarantee of completeness: - Biomass steam boiler - Steam turbine with transformer (in order to connect the turbine to the local 110 kV grid) - Complete low voltage electrical equipment incl. all cables and routings - Complete flue gas system (flue gas cleaning, flue gas condensation system, heat recovery heat pump, stack) - Complete supply and disposal systems (ship, train & truck unloading, storage facilities for feedstock, foreign material separation, conveyor systems, system for ash storage and loading) - Complete civil works, incl. buildings, foundations & supporting steal structures - Complete I&C (control system, instrumentation & automation) - All pipings, valves and pumps - Waste water, water treatment systems & sewage systems The entire system must be certified with CE conformity.

  • Contact

    eu-vergabe@vattenfall.de
  • Type
    Result · Prequalification
  • Location
    Berlin
  • Main code
    Construction work for power plant
    45251100
  • 09323000District heating31120000Generators31121000Generating sets42160000Boiler installations42417200Conveyors45251140Thermal power plant construction work

Similar active competitions

  • Stadtwerke Torgelow GmbH

    Varmepumper og energianlegg

    Planung, Errichtung und Inbetriebnahme einer Hackschnitzelfeuerungsanlage/Heizanlage

    Die Stadtwerke Torgelow GmbH benötigt die Planung, Lieferung, Montage und Inbetriebnahme von Holzhackschnitzel-Heizanlagen sowie deren betriebsfertige Übergabe an zwei Standorten in Torgelow im Rahmen des Projekts „Klimaneutrales kommunales Wärmenetz“. Die Bauleistung wird in einem mehrstufigen Verhandlungsverfahren mit Teilnahmewettbewerb vergeben; ein Zuschlag kann bereits auf das Erstangebot erfolgen. Für die Teilnahme sind mindestens drei vergleichbare Referenzen aus den letzten zehn Jahren erforderlich: Jede muss Planung mindestens der Leistungsphasen 3 bis 8, Errichtung und Inbetriebnahme einer Energieerzeugungsanlage im selben Auftrag sowie einen Nettowert von mindestens 2 Millionen Euro umfassen. Mindestens eine Referenz muss eine fertiggestellte Anlage mit Leistungsende innerhalb der letzten drei Jahre und mindestens eine eine Holzhackschnitzelfeuerungsanlage mit mindestens 1 MW Gesamtfeuerungsleistung betreffen. Zusätzlich sind unter anderem Zertifizierungen nach AGFW FW 601 FW2 und DIN EN ISO 9001:2015 sowie mindestens fünf einschlägig beschäftigte Ingenieure und drei Mitarbeitende im Bereich Planung gefordert. Bewertet werden Preis (60 %), Umsetzungskonzept (20 %), Leistungsnachweise der Anlage (10 %) und Projektorganisation (10 %).

    Competition with qualification
    Dec 14, 2026(22 days)
  • EVN Wärme GmbH

    Industrimaskiner

    Prüfsystem Errichtung Biomassekesselanlagen 1,0-10,0 MW

    EVN Wärme GmbH als größter biogener Wärmelieferant beabsichtigt in den nächsten Jahren den Ausbau von bestehenden Fernheiz-werken und die Errichtung neuer Biomasseheizwerke in Niederösterreich und Oberösterreich. Die auszutauschenden bzw. neuen Anlagen werden sich in einem Leistungsbereich von 1MW bis 10 MW befinden. Der Umfang betrifft die Produktion, Lieferung, Montage und Inbetriebnahme aller für einen einwandfreien Betrieb notwendigen Komponenten wie beispielhaft angeführt Hauptschubboden, Querförderer, Hydraulikaggregate, Biomassekessel, Elektrofilter, Isolierungen, Kaminanlage, Entaschungs-System inkl. Verschubsystem, Schaltschrank, leitechnischen Komponenten, Verkabelung, erforderliche Feldgeräte. Die Kesselanlagen müssen den nachfolgenden Brennstoff verfeuern können. Qualität A: Waldhackgut und schöner Schredder In solcher Qualität gemäß ÖNORM C4005, gemäß gültiger Fassung, Rohrstoffgruppen C1, C2, C3, C4 bis zu einem Wassergehalt von M50, Partikelgröße P63 bis P100, maximal Aschegehalt 5,9% und möglichst ohne Verunreinigungen Qualität B: schlechtes Waldhackgut, Schredder, EBP (Paletten, Spreissl, Holzemballagen, unbehandeltes Altholz aus der Bauwirtschaft, Baum und Strauch-schnitt Mittelfraktion) In solcher Qualität gemäß ÖNORM C4005, gemäß gültiger Fassung, Rohrstoffgruppen C1, C2, C3, C4 bis zu einem Wassergehalt von M55, Partikelgröße P63 bis P100, maximal Aschegehalt 6% und 18% mit Verunreinigungen durch Fremdstoffe, Holzabfälle aus auf-bereitetem Gartenabfall, zerkleinerte Holzstücke aus der Aufbereitung vom Baum und Strauchschnitt. Zusätzlich können sich im Brennstoffmaterial Metallteile, Steine und Holzstücke mit einer max. Stücklänge von 1m befinden. Diese dürfen zu keinen Beschädigungen der Fördereinheiten bzw. des Rosts führen.

    Qualification system
    Jul 29, 2028(100+ days)
  • Elektrociepłownia Piotrków Trybunalski Sp. z o.o.

    Anleggsmaskiner og utstyr

    Budowa źródła wysokosprawnej kogeneracji gazowej o mocy 4,3 MWe na terenie Ciepłowni C1 wraz z infrastrukturą towarzyszącą

    Elektrociepłownia Piotrków Trybunalski Sp. z o.o. zleca w formule „zaprojektuj i wybuduj” budowę na terenie Ciepłowni C1 w Piotrkowie Trybunalskim gazowego źródła wysokosprawnej kogeneracji o mocy 4,3 MWe; maksymalna wartość zamówienia wynosi 34,5 mln zł. Dostawa obejmuje zaprojektowanie, budowę, dostawę i montaż dwóch agregatów po 2,15 MWe, kompletnych instalacji technologicznych i pomocniczych, układów odzysku ciepła i pomp ciepła, instalacji gazowej, spalinowej, cieplnych i elektrycznych, systemów automatyki i SCADA oraz połączenie nowego źródła z istniejącą infrastrukturą. Wykonawca przeprowadzi rozruch i próby, w tym 72-godzinny ruch próbny i pomiary gwarancyjne, przeszkoli personel oraz zapewni planowe przeglądy i serwis agregatów przez co najmniej 2 lata i do osiągnięcia 16 000 mth przez każdą jednostkę; serwis pomp ciepła i pozostałych urządzeń będzie prowadzony przez 3 lata. Prace będą realizowane w czynnej ciepłowni, z zachowaniem ciągłości jej eksploatacji. Oferty będą oceniane według ceny (90%) i skorygowanej sprawności elektrycznej (10%).

    Competition
    Nov 25, 2026(3 days)
    PLN 34,500,000